OpenRFPCloses Dec 17, 2026

27-019-LH CMAR Installation of Storm Water Pump System Phase II (RFP) (12/17/26)

Macon Bibb County Board Of CommissionersGeorgia#PE-61100-NONST-2027-000000150

Bidders must submit a sealed RFP with one original, five copies, and one Flash Drive by 12:00 PM on December 17, 2026. Questions must be submitted by November 27, 2026, at 3:00 PM ET. The CMAR will provide preconstruction services, develop a GMP, and manage construction, including permanent power routing and removal of existing diesel pumps. The pump must be a Godwin Dri-Prime® CD150M, 50 HP, 460V, 3-phase, capable of 1,700 GPM and 165 ft head. A 5% bid bond is required. A 100% Performance and Payment Bond is required upon GMP acceptance.

On PublicBidSearch: the original bid posting, 3 bid documents and the agency contact (name, email and phone) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName, email and phone — included with ProPro

Overview

Due
Dec 17, 2026
Time stated in bid documents
Dec 17, 2026, 12:00 PM Eastern Time
Bid bond
5%
Performance bond
100%
Payment bond
100%
Submission
mail, hand delivery
Contract term
30 calendar days from Notice to Proceed
Documents analyzed
3

Scope of work

  • Route and install permanent power to the site
  • Decommission and remove existing diesel-driven pumps
  • Provide preconstruction services including constructability reviews and cost estimation
  • Manage procurement and develop a Guaranteed Maximum Price (GMP)
  • Oversee construction, including subcontractor and material management

Steps to Bid

  1. 1

    1

    Review the full RFP, including Attachment A (required documents), Attachment B (specifications), and all referenced attachments and addenda.

  2. 2

    2

    Schedule a one-on-one site visit with Chris Hofstadter at [email available with Pro] to inspect the Walker Road Landfill site.

  3. 3

    9

    Ensure the bid is accompanied by a bid bond in the amount of at least 5% of the total base bid, payable to the Owner.

What you'll need

Contract duration

30 calendar days from Notice to Proceed

Submission

Mail, Hand delivery

NAICS

541330, 541340, 541370, 541390

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 4 watch-outs that disqualify bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

A bid bond of at least 5% of the total base bid is required. A one-year warranty on all workmanship and labor is required.

Key dates

Questions due
Nov 27, 2026, 3:00 PM Eastern Time
Bids due
Dec 17, 2026

Documents

  • 202611_supportingdocs_PE-61100-NONST-2027-000000150-2026-11-18_09_24_30-05c5.pdf11 pages
  • 202611_supportingdocs_PE-61100-NONST-2027-000000150-2026-11-18_09_24_30-9237.pdf14 pages
  • 202611_supportingdocs_PE-61100-NONST-2027-000000150-2026-11-18_09_24_30-52e0.pdf8 pages

See all documents · Download with Pro

More from this agency

Similar open bids

Closing this week nearby