27-05 Replacement of Duplex Sewerage Ejector System
Cape Cod Community College — 1373CONVD - Cape Cod Community CollegeMain Campus, Massachusetts#BD-27-1373-1373C-1373L-135205
The project includes replacing the system, associated piping, and electrical controls. Work is to be performed during the school winter break (12/26/2026 to 12/30/2026) or off-hours. Bids are due by December 7th, 2026, at 11:00 am EST and must be submitted via email to [email available with Pro]. Prevailing wage rates apply to this project.
On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (name and email) for this bid.
Contact
Agency contact for this bidName and email — included with ProProOverview
- Due
- Dec 7, 2026
- Time stated in bid documents
- Dec 7, 2026, 11:00 AM Eastern Time
- Submission
- Documents analyzed
- 1
Scope of work
- Install a new Federal Pump Corp VSA-6H or equivalent duplex sewage pump unit.
- Ensure all work complies with local building codes and regulations.
Steps to Bid
- 1
Obtain IFB documents from Official linkPro or CCCC procurement website.
- 2
Receive responses to questions. by Dec 2, 2026, 4:00 PM
What you'll need
Contract duration
12/26/2026 to 12/30/2026
Submission
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 3 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
A duplex VSA-6H suspended wet-pit sewage pump unit as manufactured by Federal Pump Corp or simulator is specified. Each pump shall be rated 325 G.P.M. at 40 feet Total Dynamic Head, shall have a 4” inch discharge and be built for a pit or basin 10 Feet deep. Motors shall be 2 HP, 3 phase, 480 volts, 1750 R.P.M. open, drip-proof ball bearing type. The contractor is responsible for the safe disconnect, demolition, and disposal of all electrical, plumbing, and other structures to be removed for the installation of the new system. The contractor is required to clean up their worksites and disposal of work-related trash at the end of their shift each day. The contractor shall furnish all labor, supervision, tools, diagnostic equipment, transportation, materials, consumables, and incidental services necessary to work in a professional manner. The contractor shall maintain, at its own expense, insurance appropriate to the work, including commercial general liability, automobile liability, workers’ compensation, employer’s liability, and professional or pollution liability when applicable. The contractor shall comply with all applicable federal, state, provincial, and local laws, regulations, codes, ordinances, permits, and recognized industry standards. The contractor shall conduct appropriate background checks and ensure that all personnel follow site access, identification, confidentiality, and conduct requirements. Subcontractors may not be used without prior written approval. This IFB document is available on [link available with Pro] and the CCCC procurement website ([link available with Pro]). All questions to this IFB should be addressed directly to CCCC as described below. Proposers are solely responsible for obtaining any addenda or modifications that are subsequently made to this IFB through COMMBUYS website. All times listed in this IFB are Eastern Standard Time. All responses must be submitted in accordance with the specific terms of this IFB. Vendors may email the contact person at [email available with Pro] for this IFB in the event this IFB is incomplete. This IFB does not commit CCCC to pay any costs incurred in the preparation of a vendor’s response to this IFB.
Key dates
- Questions due
- Nov 25, 2026, 11:00 AM Eastern Time
- Pre-bid meeting
- Nov 20, 2026, 8:00 AM Eastern Time
- Site visit
- Nov 20, 2026, 8:00 AM Eastern Time
- Bids due
- Dec 7, 2026
- Expected award
- Dec 9, 2026, 4:00 PM Eastern Time
Documents
- IFB_27-05_Sewage_Pump_Tilden_Arts_Final.pdf46 pages
More from this agency
- Heat Pump and HVAC Training Equipment and Supplies – Amatrol Proprietary — closes Nov 24, 2026
- Heat Pump and HVAC Training Equipment and Supplies – Amatrol Proprietary — closes Nov 24, 2026
- Replacement of Duplex Sewerage Ejector System for Tilden Arts Building — closes Dec 7, 2026
Similar open bids
- NBHA-Owned Gas Pipe Inspection Services — New Bedford Housing Authority
- NBHA-26-152 Gas Pipe Inspections — New Bedford Housing Authority
- Water & Sewer Inventory Supply and Management System — Town of Arlington
- Water and Sewer Rate Analysis — Town of Hopkinton
- Water Meter Installation Project — City of Newburyport
Closing this week nearby
- Installation and Construction of Backup Generator at Cambridge Community Center – Reilience Hub Project — closes Nov 20, 2026
- Multifunction Device Procurement — closes Nov 20, 2026
- Window Replacement at Beaudry-Boucher Apartments, 68 Cabot St, Holyoke, MA — closes Nov 20, 2026
- Food Service Equipment for Natick, MA — closes Nov 23, 2026
- Process Server — closes Nov 23, 2026