Replacement of Duplex Sewerage Ejector System for Tilden Arts Building
Cape Cod Community CollegeWest Barnstable, Massachusetts#27-05
Cape Cod Community College is soliciting bids for the replacement of a duplex sewerage ejector system in the Tilden Arts Building. The project includes replacing the system, piping, and electrical controls. Work is to be performed during the school winter break (December 26-30, 2026) or off-hours. Bids are due by December 7, 2026, at 11:00 AM EST. Contractors must be licensed and comply with all applicable codes and safety regulations, including confined space certification. The IFB is available on [link available with Pro] and the CCCC procurement website.
On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (email) for this bid.
Contact
Agency contact for this bidEmail — included with ProProOverview
- Due
- Dec 7, 2026
- Submission
- Documents analyzed
- 1
Scope of work
- Replace existing duplex sewerage ejector system, associated piping, and electrical controls.
- Work to be performed during school winter break (12/26/2026 to 12/30/2026) or off-hours.
- Install a duplex VSA-6H suspended wet-pit sewage pump unit (Federal Pump Corp or simulator).
- Motors rated 2 HP, 3 phase, 480 volts, 1750 RPM.
- Includes alternating, auxiliary, and high water alarm float switches.
- Contractor responsible for demolition, disposal, and cleanup.
Steps to Bid
- 1
CCCC issues IFB on or before November 16th, 2026 was Nov 16, 2026
This date has passed — confirm eligibility with the agency before bidding.
- 2
Site walkthrough (meet at Tilden Arts Center Building #1 outside at the front door) by Nov 20, 2026, 8:00 AM
- 3
Respondent Questions Due by Nov 25, 2026, 11:00 AM
Submit questions via email to [email available with Pro]. Subject line must start with IFB 27-05 Replacement of Duplex Sewerage Ejector.
- 4
CCCC will Respond to Questions by Dec 2, 2026, 4:00 PM
- 5
IFB Responses Due
Submit all completed required forms in PDF format via email to [email available with Pro]. Subject line: "IFB 27-05 Replacement of Duplex Sewerage Ejector."
What you'll need
Contract duration
12/26/2026 to 12/30/2026
Submission
How to submit
All completed required forms must be in a PDF format and emailed to [email available with Pro] noting “IFB 27-05 Replacement of Duplex Sewerage Ejector.” in the email’s subject line before the IFB’s deadline. No late or faxed submissions will be accepted. No incomplete proposals will be considered.
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 10 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
The project objectives include reducing unplanned downtime and providing work plans for domestic water and sanitary system shutdowns. The new system should be a duplex VSA-6H suspended wet-pit sewage pump unit, Federal Pump Corp or simulator, rated at 325 GPM at 40 feet Total Dynamic Head, with a 4-inch discharge and built for a 10-foot deep pit. The contractor is responsible for demolition, disposal, cleanup, and providing all labor, tools, materials, and services. Confined space certification is required for employees working in confined spaces at CCCC.
Key dates
- Questions due
- Nov 25, 2026, 11:00 AM Eastern Time
- Pre-bid meeting
- Nov 20, 2026, 8:00 AM Eastern Time
- Site visit
- Nov 20, 2026, 8:00 AM Eastern Time
- Bids due
- Dec 7, 2026
- Expected award
- Dec 9, 2026, 4:00 PM Eastern Time
Documents
- IFB-27-05-Sewage-Pump-Tilden-Arts-Final.pdf46 pages
More from this agency
- Heat Pump and HVAC Training Equipment and Supplies – Amatrol Proprietary — closes Nov 24, 2026
- Heat Pump and HVAC Training Equipment and Supplies – Amatrol Proprietary — closes Nov 24, 2026
- 27-05 Replacement of Duplex Sewerage Ejector System — closes Dec 7, 2026
Similar open bids
- DX AHU Replacement - Sullivan Middle School — City of Worcester
- FISH 009149 — Andover Housing Authority
- Dracut 079121 Stairs — Dracut Housing Authority
- Toy Town Elementary School Building Updates — Town of Winchendon
- Reading 246093 Bath Renovations — Reading Housing Authority
Closing this week nearby
- Softball Backstop — closes Nov 18, 2026
- Walkway and Parking Lot Paving at Lower Mills — closes Nov 18, 2026
- Softball Backstop System & Installation — closes Nov 18, 2026
- Lynnfield High School Athletic Concession Building Concessions Management and Operator RFP — closes Nov 18, 2026
- Fire Protection Systems Term Contract for All MassPort Properties in Bedford, Boston, Braintree, Danvers, Framingham,… — closes Nov 18, 2026