Roadway Resurfacing - Multiple Sites - 4
Miami-Dade CountyMiami, Miami-Dade, Florida#20260230 (MCC 7360)
The work includes milling and resurfacing, widening and resurfacing of intersecting streets, resurfacing of asphaltic pathways, temporary utility repairs, shoulder clearing and excavation, grading and clean-up, pavement markings with reflective markers at fire hydrants, sidewalk and curb installation, and pedestrian ramp construction. Resurfacing may include asphaltic concrete surface and leveling courses, application to primed rock roads, and limited fathering on private driveways. The pre-bid meeting is non-mandatory and held virtually on December 8, 2026. The estimated value is $4,129,679.
On PublicBidSearch: the original bid posting, 2 bid documents and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Jan 6, 2027
- Time stated in bid documents
- Jan 6, 2027, 2:00 PM Eastern Time
- Bid bond
- 10%
- Performance bond
- 100%
- Payment bond
- 100%
- Submission
- mail, hand delivery
- Contract term
- 540 calendar days
- Documents analyzed
- 2 published · 1 analyzed
- Required submission items
- 5 items · full checklist with Pro
Scope of work
- Milling and resurfacing of multiple roadway sections
- Temporary utility repairs (cold patches)
Steps to Bid
- 1
Attend the non-mandatory pre-bid meeting on December 8, 2026, at 10:00 AM via Microsoft Teams at Official linkPro
- 2
Submit all questions to Katherine Fernandez at [email available with Pro], copying [email available with Pro], by December 8, 2026, prior to the pre-bid meeting
What you'll need
Submission
Mail, Hand delivery
NAICS
237130, 237199
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 4 watch-outs that disqualify bidders
- The 5-item required-submittals checklist
Cancel anytime · no card to browse
Project details
Work under this Contract includes furnishing of all supervision, labor, materials, tools, equipment, and performing all operations required to construct the Work in accordance with the Contract Documents. Work includes but is not limited to: milling and resurfacing; widening and resurfacing of intersecting streets, up to the existing joint at the side street or up to the point of curvature as determined by the Engineer or as indicated in the Plans; resurfacing of asphaltic pathways (pedestrian, bicycle, etc.) adjacent or not to the edge of pavement as necessary; temporary utility repairs (cold patches); clearing and excavating of shoulder areas or build-up, as directed by the Engineer; grading and clean-up of adjacent shoulders and removal of roots, as required; pavement markings including the installation of reflective pavement markers (blue/blue) at fire hydrant locations; sidewalk, sidewalk curbs and connectors, and pedestrian ramps. Resurfacing work may include: (1) application of asphaltic concrete surface course to existing wearing course; (2) application of asphaltic concrete leveling courses to existing wearing surfaces prior to and in preparation for item (1); (3) application of asphaltic concrete to previously primed rock roads; (4) fathering of the asphaltic concrete mat on private driveways to a point two (2) feet from the edge of the roadway; resurfacing of the remainder of private driveways is expressly prohibited unless directed by the Engineer; (5) adjustment of all storm water, water and sewer valves and manholes prior to resurfacing using the built-up method, not adjustment rings. Location of Work: This is a work-driven contract. The actual location(s) of work shall be identified in the Work Order(s) issued subsequent to the Award of the Contract. The combined total cost for all work authorized by the Work Order(s) shall not exceed the Contract Award amount. The Department does not guarantee that the full amount of the Contract will be issued to the Contractor. The actual amount of Work Orders assigned will be the prerogative of the Department in its sole discretion and dependent only upon its needs. and Chapter 14-2, Florida Administrative Code, to perform the work described in the Contract Documents. The Bidder must demonstrate that it has full-time personnel with the necessary experience to perform the Project’s Scope of Work. The Bidder must provide a detailed description of at least three (3) projects similar in detail to the Project’s Scope of Work, in which the Bidder’s identified personnel is currently engaged or has completed within the past five years.
Key dates
- Pre-bid meeting
- Dec 8, 2026, 10:00 AM Eastern Time
- Bids due
- Jan 6, 2027
Documents
- 20260230_INVITATION_TO_BID.pdf5 pages
- 202600230_Solicitation_Docs_Roadway_Resurf..pdf
More from this agency
- Transit Facilities Improvements Per Recertification Requirements · closes Jan 6, 2027
- Metrorail and Metromover Electronic Real Time Signage · closes Jan 6, 2027
- Roadway Resurfacing - Multiple Sites - 3 · closes Jan 6, 2027
- Sidewalk Improvements - Multiple Sites - 2 · closes Jan 6, 2027
- Intersection Improvements - Multiple Sites 1 · closes Jan 13, 2027
Similar bids near Miami
- Roadway Resurfacing - Multiple Sites - 2 · Miami · closes Dec 30, 2026
- Roadway Resurfacing - Multiple Sites - 1 · Miami · closes Dec 30, 2026
- SW-2 Bypass Pumping & Rehabilitation (Project No. 25-11070A) · Hollywood · closes Dec 3, 2026
- Sample Road Improvement Project · Lighthouse Point · closes Dec 7, 2026
Closing soon near Miami
- Pump Station 0812 Relocation and Upgrade · Miami · closes Dec 1, 2026
- Remanufactured Engines · Miami · closes Dec 1, 2026
- Purchase of Original Equipment Manufacturers (OEM) and Aftermarket Parts · Miami · closes Dec 1, 2026
- Managed Information Technology Services · Miami · closes Dec 1, 2026
- Vacant Lot Maintenance - Mowing and Fence Line Clearing · Miami · closes Dec 3, 2026