Sidewalk Improvements - Multiple Sites - 2
Miami-Dade CountyMiami, Florida#20260220 (MCC 7360)
Work includes construction, reconstruction, and repair of sidewalks, curb ramps, curbs, gutters, and related site work, along with removal of existing materials and sodding. The actual work locations will be defined in future work orders. Experience must be demonstrated through at least three similar projects in the public right-of-way. The contract is subject to a 2% user access fee (UAP) for contracts over $500,000. The project is funded in part by the Quality Neighborhood Improvement Program (QNIP). Bids are due January 6, 2027, at 2:00 PM at the Clerk of the Board office. A pre-bid meeting is scheduled for December 9, 2026, at 10:00 AM, via Microsoft Teams.
On PublicBidSearch: the original bid posting, 2 bid documents and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Jan 6, 2027
- Time stated in bid documents
- Jan 6, 2027, 2:00 PM Eastern Time
- Submission
- mail, hand delivery
- Contract term
- 540 calendar days
- Documents analyzed
- 2 published · 1 analyzed
- Required submission items
- 5 items · full checklist with Pro
Scope of work
- Construct new sidewalks and sidewalk connectors
- Install curb ramps and adjust utility valve covers
- Remove and dispose of existing pavements, trees, and debris
- Grade and prepare subgrade and sodding
Steps to Bid
- 1
Attend the pre-bid meeting on December 9, 2026, at 10:00 AM via Microsoft Teams (optional but encouraged) by Dec 9, 2026, 10:00 AM
- 2
Submit questions to Katherine Fernandez at [email available with Pro], copying [email available with Pro], by December 9, 2026, at 10:00 AM by Dec 9, 2026, 10:00 AM
What you'll need
Submission
Mail, Hand delivery
NAICS
237130
How to submit
Submit sealed bid in one envelope. Include one original and one electronic copy on USB drive. Bid must be received by 2:00 PM on January 6, 2027. Bid opening will occur immediately after submission in the 18th floor conference room.
In person/mail: 111 NW 1 St, Suite 1710, Miami, FL 33128
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 6 watch-outs that disqualify bidders
- The 5-item required-submittals checklist
Cancel anytime · no card to browse
Project details
Work under this contract includes furnishing all supervision, labor, materials, tools, equipment, and performing all operations required to construct the work in accordance with the contract documents. Scope includes construction of new sidewalks, sidewalk connectors, driveway approaches, curb ramps, curbs, and/or gutters; reconstruction and/or repair of existing sidewalks, sidewalk connectors, driveway approaches, curb ramps, curbs, and/or gutters; removal and disposal of existing pavements, trees, tree roots, and debris; grading and preparation of subgrade and sodding; and adjustment of existing utility valve covers to new finished grade. One or a combination of multiple work types may be required at any site per the work order. The contractor and all subcontractors are prohibited from performing any work outside the contract or directed by the engineer within the project site limits without prior written notification to the engineer, including work for private or commercial entities. The actual work locations will be specified in work orders issued after contract award. The Department does not guarantee the full contract amount will be issued; actual work orders are at the Department’s sole discretion and may be updated post-award. The combined total cost of all work orders shall not exceed the contract award amount. The contractor must obtain all required permits prior to work. The contractor shall comply with all applicable procurement regulations and funding source requirements.
Key dates
- Pre-bid meeting
- Dec 9, 2026, 10:00 AM Eastern Time
- Bids due
- Jan 6, 2027
Documents
- 20260220_INVITATION_TO_BID.pdf5 pages
- 202600220_Solicitation_Documents_Sidewalk.pdf
More from this agency
- Pump Station 0812 Relocation and Upgrade · closes Dec 1, 2026
- Intersection Improvements - Multiple Sites 1 · closes Jan 13, 2027
- Intersection Improvements - Multiple Sites 2 · closes Jan 13, 2027
- Sidewalk Improvements - Multiple Sites - 4 · closes Jan 13, 2027
- Sidewalk Improvements - Multiple Sites - 3 · closes Jan 13, 2027
Similar bids near Miami
- Sidewalk Improvements - Multiple Sites - 1 · Miami · closes Dec 30, 2026
- Old Cutler Commons UN1 & UN2 Sub-Basins Water Quality Improvement Project · Cutler Bay · closes Jan 13, 2027
- Winfield Blvd Pedestrian Sidewalk and Bridge · Margate · closes Dec 8, 2026
Closing soon near Miami
- Twin Homes Homeownership Opportunities · Miami · closes Dec 1, 2026
- Specialized Repairs, Rebuilding, and Transmission Repair Service · Miami · closes Dec 1, 2026
- Micro-Schools Initiative · Miami · closes Dec 1, 2026
- MIA Central Terminal Public Restrooms Modernization Group 2 · Miami · closes Dec 2, 2026
- Fence Improvements - Portwide · Miami · closes Dec 4, 2026