AwardedRFQ

Administrative Building HVAC Replacement Design

Clallam County PUDSequim, Washington#260314

Public Utility District #1 of Clallam County seeks Statements of Qualifications from engineering firms for the design of a replacement HVAC system for its 29,496 sq ft administrative building in Sequim, WA. The existing VRF system has experienced significant issues since 2015. Firms must demonstrate experience in commercial HVAC replacement design, including assessment, alternative analysis, and full construction document preparation. The deadline for submitting Statements of Qualifications is July 15, 2026.

Awarded to Hultz BHU Engineers Inc

On PublicBidSearch: the original bid posting, 6 bid documents and the agency contact (name, email and phone) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName, email and phone — included with ProPro

Overview

Due
Jul 15, 2026
Time stated in bid documents
Jul 15, 2026, 12:00 PM Pacific Time
Submission
email

Steps to Bid

  1. 1

    Submit intent to submit via email.

    Send intent to [email available with Pro].

  2. 2

    Attend optional site visit.

    Scheduled for July 7, 2026, or July 9, 2026, at 10:00 a.m. PDT at 104 Hooker Road, Sequim, Washington. Contact Jason Seibel by email to notify of attendance.

  3. 3

    Submit Statement of Qualifications. was Jul 15, 2026, 12:00 PM

    This date has passed — confirm eligibility with the agency before bidding.

    Submit in .pdf file format by email to [email available with Pro] and [email available with Pro]. Maximum 25 pages, excluding cover, cover letter, table of contents, and resumes.

What you'll need

License

Staff shown in the organization chart should currently possess all applicable certifications and licensing from the State of Washington required to complete the project.

Prequalification

Not required

Award method

Negotiation based on evaluated scores and qualifications

Submission

Email

How to submit

Statements of Qualifications must be submitted in .pdf file format by E-Mail to [email available with Pro] and [email available with Pro]. Statements of Qualifications shall be a maximum of twenty-five (25) pages, excluding cover, cover letter, table of contents, and resumes of the project team. One page is equivalent to one side of an 8.5x11 sheet of paper. Pages are to be letter size (8.5x11) and/or an 11x17 folded page containing a table and/or chart counting as one page. Font shall not be less than 11 point.

Get alerts for bids like this

New construction bids in Washington

This bid has closed. We'll tell you when the next one like it posts. Free, no card needed.

Get alerts — free

Project details

The facility is located at 104 Hooker Road, Sequim, WA 98382. The existing system is a Variable Refrigerant Flow (VRF) system manufactured by LG, with a dedicated outside air system (DOAS) and energy recovery ventilator manufactured by Aaon. The VRF system consists of three dual frame outdoor heat pumps and one single frame outdoor heat pump, combined with 38 indoor units. The system has experienced issues since its original construction in 2015, including failed thermostats, incorrect control wiring, system communication problems, failing control boards, failed compressors, and unresolved error codes. Currently, two heat pumps (HP-2 and -4) are not operational. The selected consultant will evaluate the existing HVAC system, assess facility needs, analyze feasible replacement alternatives, and prepare complete construction documents for the selected replacement system. The replacement system must comply with all applicable federal, state, and local codes, including the current Washington State Energy Code. Scope of services includes: Existing Conditions Assessment (site investigations, field verification, review of as-built drawings and maintenance records, assessment of equipment, controls, and distribution systems, identification of deficiencies and code compliance issues); Consider HVAC Alternatives (heating and cooling load calculations, analysis of alternatives based on cost, energy efficiency, maintenance, reliability, comfort, and compatibility); Basis of Design (development of a BOD document); Design and Construction Documents (preparation of demolition plans, mechanical plans, equipment schedules, control sequences, technical specifications, cost estimates, and coordination with other disciplines); Permitting and Bidding Support (assistance with permit applications, response to plan review comments, bidder questions, and addenda preparation); and Construction Administration (review of submittals, response to RFIs, site observations, review of testing/balancing/startup/commissioning documentation, and assistance with project closeout). Deliverables include: Existing Conditions Assessment Report, HVAC Alternatives Analysis Report, Basis of Design Report, Design Development Documents, Final Construction Drawings and Specifications, Engineer's Construction Cost Estimate, Energy Code Compliance Documentation, Permit Review Responses, and Equipment Manuals, Commissioning, Operations and Maintenance Plan, and As-built Documentation. The selected consultant will be expected to negotiate a contract based on evaluated scores and the District's standard Professional Services Agreement.

Documents

  • 260314-HVAC-replacement-design.pdf7 pages
  • Exhibit-A-Administration-Specs-compressed.pdf
  • Exhibit-B-Administration-Bldg.-Bid-Set-compressed.pdf
  • 260314-Addendum-No-1.pdf
  • CCPUD-Admin-HVAC-Operations-and-Maintenance-Manual.pdf
  • 1st-Flr-and-2nd-Flr-Admin.zip

See all documents · Download with Pro

More from this agency

Similar bids near Sequim

Closing soon near Sequim