8th and Fountain Stormwater Detention Project
City of BloomingtonBloomington, Indiana
The City of Bloomington, Indiana, is soliciting sealed bids for the construction of two stormwater detention basins at the intersection of 8th and Fountain Streets. The scope includes right-of-way excavation, erosion controls, traffic maintenance, and landscaping. Bidders must be SAM-registered and not debarred. The project is subject to Davis-Bacon prevailing wage and Bloomington’s living wage. Bid bond required at 5% for projects $150,000 or more; performance and payment bonds required at 100% of contract price for projects over $100,000.
On PublicBidSearch: the newspaper notice for this bid.
Overview
- Due
- Dec 14, 2026
- Time stated in bid documents
- Dec 14, 2026, 4:30 PM Eastern Time
- Bid bond
- 5%
- Performance bond
- 100%
- Payment bond
- 100%
- Submission
- electronic portal
- Required submission items
- 3 items · full checklist with Pro
Scope of work
- Perform right-of-way excavation and utility coordination
- Install erosion controls and sediment basins
- Implement traffic maintenance and safety plan
- Complete associated landscaping and site restoration
Steps to Bid
- 1
Register with Official linkPro and ensure no debarment status.
- 2
Review the full bid documents available at Official linkPro.
- 3
Submit sealed bid electronically via OpenGov at Official linkPro. by Dec 14, 2026, 4:30 PM
What you'll need
Insurance
RequiredThe project is subject to federal environmental regulations, and applicable historic preservation and flood disaster protection requirements.
Submission
Electronic portal
NAICS
237130, 237990
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 4 watch-outs that disqualify bidders
- The 3-item required-submittals checklist
Cancel anytime · no card to browse
Project details
Bids must be submitted electronically via the City's procurement portal at [link available with Pro] or through OpenGov at [link available with Pro]. Bids will be publicly opened at the Utilities Service Building, 600 E. Miller Drive, Bloomington, IN, at 4:30 pm on the same date. The requester reserves the right to reject all bids. The project is subject to federal Davis-Bacon prevailing wage requirements, Bloomington's living wage ordinance, and federal environmental, historic preservation, and flood disaster protection regulations. Bidders must be registered with [link available with Pro] and not appear on SAM's suspended or debarred list. Disadvantaged, minority, and women-owned businesses are encouraged to apply. No discrimination on the basis of race, color, sex, or national origin. Funds will not be used for political activities, religious activities, lobbying, political patronage, or nepotism.
Key dates
- Bids due
- Dec 14, 2026
More from this agency
- Dunn Street Paving (17th to Bypass) — City of Bloomington, Indiana · closes Dec 9, 2026
- College Avenue Paving Project — North College Avenue from West 11th Street to SR45/46 Bypass · closes Dec 9, 2026
- 3rd Street Median Improvements — City of Bloomington, Indiana · closes Dec 9, 2026
- Alley Infrastructure Improvements - North-South and East-West Alleys between Rogers Street and Madison Street, from… · closes Dec 9, 2026
Closing soon near Bloomington
- BL601 Memorial Stadium Replace North Fascia LED Display · Bloomington · closes Dec 2, 2026
- Application of Bituminous Materials for Road Resurfacing Projects in Monroe County, Indiana · Monroe County · closes Dec 3, 2026
- SE878A Grove Lodge HVAC & Flat Roof Replacement · Bloomington · closes Dec 3, 2026
- BL000A Site Campus River Restoration Phase IV · Bloomington · closes Dec 3, 2026
- SE878B Orchard Lodge HVAC & Flat Roof Replacement · Bloomington · closes Dec 3, 2026