OpenIFBCloses Dec 9, 2026

Alley Infrastructure Improvements - North-South and East-West Alleys between Rogers Street and Madison Street, from 3rd Street to half block south of 8th Street

City of BloomingtonBloomington, Indiana

The City of Bloomington, Indiana, is soliciting sealed bids for alley infrastructure improvements in the North-South and East-West alleys between Rogers Street and Madison Street, from 3rd Street to half block south of 8th Street. The scope includes milling and resurfacing, patching, sidewalk and curb work, storm drain installation, and traffic and erosion control. Bidders must comply with equal opportunity and anti-discrimination policies.

On PublicBidSearch: the newspaper notice and the agency contact (name, email and phone) for this bid.

Open Newspaper Notice Pro

Contact

Agency contact for this bidName, email and phone — included with ProPro

Overview

Due
Dec 9, 2026
Time stated in bid documents
Dec 9, 2026, 11:00 AM Eastern Time
Submission
portal
Required submission items
5 items · full checklist with Pro

Scope of work

  • Resurface alleys with asphalt/concrete milling and resurfacing
  • Reconstruct sidewalks and curbs, including decorative pavers
  • Install storm sewer trench drain and adjust utility castings
  • Perform full depth asphalt patching and reconstruction
  • Maintain traffic and erosion control during work

Steps to Bid

  1. 1

    Register on the City of Bloomington procurement portal at Official linkPro

  2. 2

    Review the full solicitation and instructions to bidders

  3. 3

    Submit via the City’s procurement portal by the deadline by Dec 9, 2026, 11:00 AM

What you'll need

Insurance

Required

For projects utilizing Federal funding, wage rates shall be in compliance with the Davis Bacon Act.

Submission

Portal

NAICS

237130, 237199

How to submit

Submit via the City of Bloomington procurement portal at Official linkPro. All required documents must be included in the electronic submission package.

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 2 watch-outs that disqualify bidders
  • The 5-item required-submittals checklist
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

Paving exceptions apply at cross streets: 4th Street, Kirkwood Avenue, 6th Street, and 7th Street. Bids must be submitted through the City's procurement portal at [link available with Pro]. Morton Street, Bloomington, Indiana, and via Zoom at [link available with Pro]. Morton Street, Bloomington, Indiana, and via Zoom. For projects over $300,000 involving construction, improvement, alteration, repair, or maintenance of a road, street, alley, or highway, the contractor must be pre-qualified with the Indiana Department of Transportation (INDOT) under Indiana Code 8-23-10. If the project may require a trench of at least 5 feet in depth, the low bidder must submit a trench safety plan to the project engineer at least 10 days before work begins. The City of Bloomington is an equal opportunity employer and requires compliance with Title VII of the 1964 Civil Rights Act and the Bloomington Human Rights Ordinance. Bidders must comply with the City's contract compliance policy covering nondiscrimination, anti-harassment, grievance procedures, and prohibition of retaliation. Bids may be held for up to 60 days after opening for review and qualification investigation.

Key dates

Bids due
Dec 9, 2026
Expected award
Dec 15, 2026

More from this agency

Closing soon near Bloomington