OpenRFPCloses Dec 17, 2026, 9:00 AM CT

Airlock Wall Construction at Rock Island Arsenal

Dept of the Army — W6QK ACC-RIRock Island, Illinois#W519TC27RA013

This solicitation is for the construction of an airlock wall at Rock Island Arsenal - Joint Manufacturing and Technology Center (RIA-JMTC). The project includes a high-speed overhead door and a standard man-door. A mandatory pre-construction site visit is scheduled for December 3, 2026. Contractors must comply with all security requirements for accessing the installation. Davis-Bacon Act Wage Determination IL20260012 Modification 3 applies.

On PublicBidSearch: the original bid posting, 3 bid documents and the agency contact (name and email) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName and email — included with ProPro

Overview

Due
Dec 17, 2026, 9:00 AM CT
Time stated in bid documents
Dec 17, 2026, 9:00 AM Central Time
Submission
mail, hand delivery
Contract term
21 Dec 2026
Documents analyzed
3 published · 2 analyzed
Required submission items
1 items · full checklist with Pro

Scope of work

  • Construct an airlock wall (approx. 60-ft W x 38-ft H) in Building 299.
  • Install one (1) large high-speed overhead door (24-ft W x 21-ft H).
  • Install one (1) standard man-door (min. 3-ft W x 7-ft H) with panic hardware.
  • Ensure compliance with fire resistance and life safety codes (NFPA 701, ASTM E84/UL 723).
  • Connect overhead door to building's fire suppression control panel.

Steps to Bid

  1. 1

    Make a reservation for the mandatory site visit at least two business days prior to December 3, 2026. by Dec 1, 2026

    Reservations for the site visit are mandatory. Contact John Jacobsen at [email available with Pro].

  2. 2

    Attend the pre-construction site visit. by Dec 3, 2026, 10:00 AM

    Meeting at the Northeast corner of Building 299, Rock Island Arsenal. Attendees must wear steel-toed safety shoes and safety glasses.

What you'll need

Insurance

Required

52.228-5 Insurance-Work on a Government Installation. 1997-01

Contract duration

21 Dec 2026 To 01 Mar 2027

Submission

Mail, Hand delivery

NAICS

332321

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 10 watch-outs that disqualify bidders
  • The 1-item required-submittals checklist
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

The Army Contracting Command - Rock Island (ACC-RI) is soliciting bids for the construction of an airlock wall within Building 299 at the Rock Island Arsenal - Joint Manufacturing and Technology Center (RIA-JMTC). The overhead door must be connected to the building's fire suppression control panel and have a reset switch accessible from floor level. The man-door must swing in the direction of exit travel and be equipped with code-compliant, single-motion panic hardware. A flat, level landing of at least 12 inches is required before the ramp slope begins, as the door cannot swing over the sloped surface. The power strip from the existing overhead bridge crane will need to be shortened and terminated. A pre-construction site visit is mandatory and scheduled for December 3, 2026, at 1000 Central Time, meeting at the Northeast corner of Building 299. Reservations are required at least two business days prior. Contractors must wear steel-toed safety shoes and safety glasses. Security requirements for accessing RIA-JMTC, including background checks and potential FPCON level adjustments, must be followed. No Common Access Cards (CAC) will be issued for this action. The period of performance is from December 21, 2026, to March 1, 2027.

Key dates

Pre-bid meeting
Dec 3, 2026, 10:00 AM Central Time · Mandatory
Site visit
Dec 3, 2026, 10:00 AM Central Time
Bids due
Dec 17, 2026, 9:00 AM CT

Documents

  • W519TC27RA013.pdf79 pages
  • 25-4-05_Quality_Assurance_Surveillance_Plan.xls
  • RIPD_E4000-25-4-05_Airlock_Wall_B299_28R1_29_2810-Nov-26_29.docx

See all documents · Download with Pro

More from this agency

Similar bids near Rock Island

Closing soon near Rock Island