Airport Bush Hog FY27
City of LebanonLebanon, Carter, Missouri#AP-73-261124-F-1040
The City of Lebanon, Missouri, is seeking bids for one bat wing bush hog for the Lebanon Municipal Airport. The equipment must meet or exceed the specifications in the bid packet. Bids must be submitted electronically via Ion Wave Technologies by 2:00 PM CT on November 24, 2026. Bidders must register with the portal at least seven days prior to the deadline. All prices must be net delivered firm, including all freight and handling. Delivery must occur between 8:00 AM and 4:00 PM, Monday through Friday, with 24 hours’ notice. Oversized or heavy freight must be delivered on flatbed trucks and palletized. The bid must remain valid for 30 days after submission. The City may use its purchasing card; bidders must agree or disagree to this. The winning bidder must provide warranty documentation and agree to the specifications and bid validity terms.
On PublicBidSearch: the original bid posting, 2 bid documents and the agency contact (name and phone) for this bid.
Contact
Agency contact for this bidName and phone — included with ProProOverview
- Due
- Nov 24, 2026, 2:00 PM CT
- Time stated in bid documents
- Nov 24, 2026, 2:00 PM Central Time
- Submission
- electronic portal
- Documents analyzed
- 2 published · 1 analyzed
Steps to Bid
- 1
Register with Ion Wave Technologies e-bidding portal at least 7 calendar days before the bid deadline. was Nov 17, 2026, 2:00 PM
This date has passed — confirm eligibility with the agency before bidding.
- 2
Review the bid packet and specifications for the bat wing bush hog.
- 3
Submit all required bid documents, including warranty information and bid form, via the Ion Wave Technologies portal. by Nov 24, 2026, 2:00 PM
- 4
Ensure all bid information is complete, including make, model year, model number, gearbox warranty, machine warranty, and total price. by Nov 24, 2026, 2:00 PM
What you'll need
Submission
Electronic portal
NAICS
333112, 333113
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 6 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
Bidders must submit their proposals electronically via the Ion Wave Technologies e-bidding portal. The bid must include the make, model year, model number, gearbox warranty duration, and machine warranty duration. All prices must be net delivered firm prices, inclusive of all delivery, handling, surcharges, and freight charges. Freight over 90 pounds must be palletized and forklift-ready.
Key dates
- Questions due
- Nov 18, 2026, 5:00 PM Central Time
- Bids due
- Nov 24, 2026, 2:00 PM CT
Documents
- Bid_Invitation.pdf6 pages
- Airport_Bush_Hog_FY27.pdf
More from this agency
- Fire Extinguisher Inspection, Testing, and Refilling Services — closes Nov 24, 2026
- Utility Grade Phase Identification System — closes Nov 24, 2026
- Replacement of HVAC Unit at Public Works FY27 — closes Nov 24, 2026
- Public Works Fleet Bid FY27 — closes Nov 24, 2026
- Airport Refueler Truck FY27 — closes Nov 24, 2026
Similar open bids
- E-Rate FY2027 Category 1 & Category 2 - Standalone Data Transmission Service; Antennas, Connectors, and Related… — Senath-Hornersville Dist C 8
- Absentee Ballot Packets, Sample Ballots, and Related Services — Boone County Missouri
- Butler School District R 5: E-Rate FY2027 Category 2 - Managed Internal Broadband Services (MIBS) for Existing Equipment — Butler School District R 5
- HDCSO Analytical Laboratory Systems (ALS) Course Instruction Services — DEPT OF THE ARMY
- Voting System Microwave Upgrade — City of Branson
Closing this week nearby
- Alton R-Iv School District: E-Rate FY2027 Category 2 - Switches and Necessary Software and Licenses; Switches — closes Nov 18, 2026
- Supplemental Workforce for STIP Projects — Construction and Materials Division, District CO — closes Nov 18, 2026
- Guard Wheel Power Truck Shade Window Right Side (Core Return) — OEM Only, Per Bi-State Specifications — closes Nov 19, 2026
- ISD Santa Fe Trails Elementary School Roof Improvements — closes Nov 19, 2026
- New Ballas Sidewalk Project – Phase 3 — closes Nov 19, 2026