Fire Extinguisher Inspection, Testing, and Refilling Services
City of LebanonLebanon, Cass, Missouri#MD-99-261124-W-1046
The City of Lebanon, Missouri, is soliciting bids for fire extinguisher inspection, testing, and refilling services for the 2027 calendar year. The scope includes annual inspections, refilling, hydrostatic testing, and fleet-specific maintenance across city buildings, vehicles, and high-risk facilities. Kitchen hood inspections are also required. Bids must be submitted electronically via Ion Wave Technologies by 2:00 PM CT on November 24, 2026. Vendors must register at least seven days prior to the deadline. No advance payments will be made. Bidders must comply with NFPA 10 and local safety codes.
On PublicBidSearch: the original bid posting, 2 bid documents and the agency contact (name and phone) for this bid.
Contact
Agency contact for this bidName and phone — included with ProProOverview
- Due
- Nov 24, 2026, 2:00 PM CT
- Time stated in bid documents
- Nov 24, 2026, 2:00 PM Central Time
- Submission
- electronic portal
- Contract term
- one (1) year term beginning January 1, 2027
- Documents analyzed
- 2
Scope of work
- Refill or recharge extinguishers found under-pressurized or partially discharged
- Perform hydrostatic testing and 6-year maintenance per extinguisher type
- Conduct specialized inspections for extinguishers in high-vibration environments
- Maintain a bar-coded inventory and tracking log of all extinguishers
Steps to Bid
- 1
Register with Ion Wave Technologies at least 7 calendar days before the due date. was Nov 17, 2026, 2:00 PM
This date has passed — confirm eligibility with the agency before bidding.
- 2
Submit all questions electronically through the Ion Wave portal by 5:00 PM CT on November 18, 2026. was Nov 18, 2026, 5:00 PM
This date has passed — confirm eligibility with the agency before bidding.
- 3
Download and complete the bid form and required attachments via the Ion Wave portal. by Nov 24, 2026, 2:00 PM
- 4
Submit the completed bid electronically through Ion Wave Technologies by 2:00 PM CT on November 24, 2026. by Nov 24, 2026, 2:00 PM
What you'll need
Submission
Electronic portal
NAICS
339999, 561490
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 3 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
The scope includes annual physical inspections of all portable fire extinguishers across city buildings and vehicles, including pressure gauge, seal, tamper indicator, hose, and nozzle checks; verification of placement, visibility, and accessibility; and tracking via bar-code inventory. All units must be maintained in full compliance with NFPA 10 and local safety codes. Hydrostatic testing and 6-year maintenance are required per extinguisher type (e.g., dry chemical, CO2, water). Specialized inspections are required for extinguishers in high-vibration environments such as public works and emergency vehicles. The program includes three phases: Phase 1 (City Fleet & Emergency Vehicles), Phase 2 (High-Risk Facilities), and Phase 3 (Administrative Facilities). Invoices must be itemized and submitted after completion and acceptance of services. All materials, labor, equipment, and supplies are to be provided by the bidder unless otherwise specified.
Key dates
- Questions due
- Nov 18, 2026, 5:00 PM Central Time
- Bids due
- Nov 24, 2026, 2:00 PM CT
Documents
- Bid_Invitation.pdf5 pages
- Fire_Extinguisher_Inspection_Testing_and_Refilling_Services.pdf7 pages
More from this agency
- Utility Grade Phase Identification System — closes Nov 24, 2026
- Replacement of HVAC Unit at Public Works FY27 — closes Nov 24, 2026
- Public Works Fleet Bid FY27 — closes Nov 24, 2026
- Airport Refueler Truck FY27 — closes Nov 24, 2026
- Airport Bush Hog FY27 — closes Nov 24, 2026
Similar open bids
- Golf Course Tractor FY27 — City of Lebanon
- Resurface Route MM and Bus 136 in Scotland County, Missouri — Missouri Department of Transportation
- Coldmill and Resurface on 44 Spur and Bus Loop 44 in St. Robert, and Route 17 in Waynesville — Missouri Department of Transportation
Closing this week nearby
- Alton R-Iv School District: E-Rate FY2027 Category 2 - Switches and Necessary Software and Licenses; Switches — closes Nov 18, 2026
- Supplemental Workforce for STIP Projects — Construction and Materials Division, District CO — closes Nov 18, 2026
- Guard Wheel Power Truck Shade Window Right Side (Core Return) — OEM Only, Per Bi-State Specifications — closes Nov 19, 2026
- ISD Santa Fe Trails Elementary School Roof Improvements — closes Nov 19, 2026
- New Ballas Sidewalk Project – Phase 3 — closes Nov 19, 2026