As-Needed Spot Sewer Replacement No. 50
San Francisco Public Utilities Commission — INFRASTRUCTURE DIVISIONSan Francisco, California#WW-798
The San Francisco Public Utilities Commission is soliciting bids for as-needed spot sewer replacement across San Francisco, including trenchless rehabilitation of 8-inch to 18-inch sewer lines using UV-cured and CIPP liners, HDPE pipe installation via pipe-bursting, and open-cut work. Bidders must submit documented Good Faith efforts on CMD Form 2B unless exceeding the LBE requirement by 35%. The project is valued at $16 million. A pre-bid teleconference is scheduled for November 17, 2026, at 10:00 AM. All materials are available by request with a signed confidentiality agreement.
Overview
- Due
- Dec 11, 2026
- Time stated in bid documents
- Dec 10, 2026, 11:59 PM Pacific Time
- Submission
- Required submission items
- 1 items · full checklist with Pro
Scope of work
- Install HDPE pipe via trenchless pipe-bursting method
- Perform open-cut pipeline and manhole installation
- Conduct CCTV and pipeline inspection
- Restore pavement and surface after excavation
- Provide traffic control and safety services
Steps to Bid
- 1
Attend the pre-bid teleconference on November 17, 2026, at 10:00 AM via Zoom or phone. by Nov 17, 2026, 10:00 AM
- 2
Sign and comply with a Confidentiality Agreement before receiving bid materials. by Nov 17, 2026, 10:00 AM
What you'll need
Submission
NAICS
237130, 237199
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 2 watch-outs that disqualify bidders
- The 1-item required-submittals checklist
Cancel anytime · no card to browse
Project details
The project involves contingency-based as-needed repair, rehabilitation, or replacement of sections or full length of existing sewer pipelines on short notice at locations to be determined within the City and County of San Francisco. Work includes lining laterals and 8-inch, 12-inch, and 15-inch main sewers with UV-cured liner; rehabilitating 12-inch, 15-inch, and 18-inch diameter main sewers using cured-in-place-pipe (CIPP) liner; and installing HDPE pipe for laterals and main sewers via trenchless pipe-bursting methods. The scope also includes open-cut pipeline and manhole installation; trenchless pipeline and structure rehabilitation; trucking, hauling, and logistics; CCTV and pipeline inspection; environmental and waste management; traffic control and safety services; pavement and surface restoration; and utility protection and support work. PUC-LBEs and prime or joint venture LBE participation cannot be counted toward the requirement. Bid discounts may be applied per San Francisco Administrative Code Chapter 14B and Section 2.01 of CMD Attachment 1. The project is located in San Francisco, California. The estimated value is $16,000,000.
Key dates
- Pre-bid meeting
- Nov 17, 2026, 10:00 AM Pacific Time
- Bids due
- Dec 11, 2026
Contact
Agency contact for this bidName, email & phone — included with ProProMore from this agency
- Master As-Needed Alameda Watershed Improvements — closes Nov 11, 2026
- Master As-Needed Peninsula and San Francisco Watershed Impro... Cost: $10,000,000 ("Master Agreement") — closes Nov 11, 2026
- General Engineering (A-License) Construction, San Joaquin, S... Cost: The Maximum Contract Amount is $5,000,000 — closes Nov 13, 2026
- Canyon Tunnel Hetchy Adit Improvements — closes Nov 20, 2026
- Large Diameter Brick Sewer Improvements — closes Nov 20, 2026
Similar open bids
- HD-S3262 On-Call Services for Underground Wet Utilities — Port of Long Beach
- Broad Street and Randolph Street Sewer Replacement — San Francisco Public Utilities Commission
- Collection System Manhole Rehabilitation Project FY 2026-2027 — Olivenhain Municipal Water District
- Park Avenue Water Transmission Main Replacement — City of Riverside
- 8-inch Ductile Iron Water Main Replacement and Sewer Line Upgrade with Paving Renovation on Harkness Ave., Goettingen… — San Francisco Public Utilities Commission
Closing this week nearby
- Special Events Coordinator — closes Nov 9, 2026
- Third Party Collection Services Extension — closes Nov 9, 2026
- Ice Machine Maintenance & Repair and Freon Extraction — closes Nov 9, 2026
- Meadows Parkway Pavement Rehabilitation — closes Nov 9, 2026
- Meadows Parkway Pavement Rehabilitation Project No. PW25-07 — closes Nov 9, 2026