B304 Cooling Tower #3 Fan Drive Replacement and Electrical Repair
Dept of the Air Force — FA4600 55 CONS PKPOffutt AFB, Nebraska#FA460027Q0009
The contractor must supply and install a like-for-like fan drive compatible with the existing motor and tower configuration, replace wiring and conduit, remove and reinstall the fan blade and guard, align the drive to the motor, and perform start-up testing. The contractor must be SAM-registered and comply with the Service Contract Act wage determination WD #2015-5005, Revision 30. A site visit is scheduled for 1 December 2026 at 1:00 PM CST. Questions must be submitted by 7 December 2026 at 10:00 AM CST. Offers must be received by 14 December 2026 at 10:00 AM CST. The contractor must provide a 1-year warranty on all labor and materials.
On PublicBidSearch: the original bid posting, 4 bid documents and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Dec 14, 2026, 10:00 AM CT
- Time stated in bid documents
- Dec 14, 2026, 10:00 AM Central Time
- Submission
- Documents analyzed
- 4
Scope of work
- Replace fan drive and gearbox on Cooling Tower #3
- Repair or replace wiring and conduit from motor to tower enclosure
- Align new fan drive to fan blade assembly
- Coordinate with motor contractor for alignment and connection
- Perform start-up testing and verify full operation
Steps to Bid
- 1
Register in Official linkPro and ensure active status.
- 2
Review the solicitation, PWS, wage determination, and EAL form.
- 3
Complete and return the EAL form by 24 November 2026, COB. by Nov 24, 2026, 11:59 PM
- 4
Attend the site visit on 1 December 2026 at 1:00 PM CST (base access not guaranteed). by Dec 1, 2026, 1:00 PM
- 5
Submit questions in writing to the Contracting Office by 7 December 2026 at 10:00 AM CST. by Dec 7, 2026, 10:00 AM
- 6
Prepare and submit a signed offer including: solicitation number, offeror name and contact info, UEI, EFT indicator, responses to required representations, and a statement of agreement with all terms.
- 7
Submit one electronic copy of the completed pricing in accordance with the CLIN structure on page 3.
- 8
Submit the offer to the Contracting Office by 14 December 2026 at 10:00 AM CST. by Dec 14, 2026, 10:00 AM
What you'll need
Contract duration
21 December 2026 to 22 March 2027
Submission
NAICS
561210
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 6 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
Solicitation FA460027Q0009 for commercial services at Offutt AFB, NE. The Contractor shall procure and provide a new fan drive to match the cooling tower #3 fan and motor, with like-for-like fit, form, and function. The fan drive must be compatible with the existing cooling tower fan and motor configuration, matching current unit capacity, size, and operational requirements. The new motor is being provided and installed on a separate contract. Work includes removal of the fan guard and fan blade on Tower #3, replacement of the fan drive/gearbox, shaft and coupling, and alignment of the new drive to the fan blade assembly. The Contractor shall coordinate with the motor contractor to align the gearbox-to-motor shaft, coupling, and connections, and provide required hardware. A minimum 1-year warranty on all labor and materials is required. The Contractor shall clean up and dispose of all removed equipment and project waste off-base in accordance with Environmental Special Conditions section 01 57 19. EAL form must be completed and returned by 24 November 2026. All offerors must be registered in SAM. The contract is subject to the Service Contract Labor Standards (RFO 52.222-41) and the current wage determination, Service Contract Act WD #2015-5005, Revision 30, revised 26 August 2026. The Contractor shall provide all materials, labor, tools, equipment, supervision, and incidental costs. Work must conform to NFPA, AFI, ETL, Unified Facility Criteria, and ISO 9001 standards. The Contractor shall coordinate with the Government for system operation and testing, with two weeks’ notice required for outages. The Contractor shall provide Lock-Out-Tag-Out equipment and comply with FAA and airfield coordination requirements for crane use. The Contractor shall not alter, add, or delete any work without prior written approval. The Contractor shall perform quality assurance per ISO 9001. The Contractor shall notify the Contracting Officer’s Representative at least 15 calendar days in advance of any utility interruption. The Contractor shall use PWS requirements. The Contractor shall dispose of all waste off-base in accordance with Offutt AFB Environmental Special Conditions section 01 57 19.
Key dates
- Questions due
- Dec 7, 2026, 10:00 AM Central Time
- Site visit
- Dec 1, 2026, 1:00 PM Central Time
- Bids due
- Dec 14, 2026, 10:00 AM CT
Documents
- Solicitation_-_FA460027Q0009.pdf17 pages
- Attachment_1_-_PWS_-_11.19.2026.pdf3 pages
- Attachment_2_-_Wage_Determination_2015-5005_V30_-_08.27.2026.pdf7 pages
- Attachment_3_-_EAL_-_11.19.2026.pdf2 pages
More from this agency
- Gas Line Repair — closes Dec 8, 2026
Similar open bids
- LWS Isolation Transformer OTP11 Replacement — City of Lincoln / Lancaster County Purchasing
- E-Rate FY2027 Category 2: Uninterruptable Power Supply/Battery Backup and Software Licenses; Basic Maintenance for 10… — Springfield Platteview Community Schools
- Don Henry Power Center Generator Excitation Replacement, HU 2026-103 — City of Hastings, Nebraska
- Request for Proposal (RFP) for ADA External Website Compliance — Nebraska Public Power District
- 115kV Transmission Line 1266 Rebuild: Stanton North Substation to Dead-End Structure 79 — Nebraska Public Power District
Closing this week nearby
- Giles Road Widening Project — closes Nov 20, 2026
- 2027 Various Asphalt Overlays, Project C-77 (25-01) — closes Nov 20, 2026
- Request for Proposals: 2027 Various Asphalt Overlays, Project C-77 (25-01) for the Public Works Department — closes Nov 20, 2026
- Bridge #15 Rehabilitation, 36th Street over Big Papio Creek, Project C-77(24-18) — closes Nov 20, 2026
- Canopy Yard Cottonwood Commons Prequalified Caterers — closes Nov 20, 2026