Gas Line Repair
Dept of the Air Force — FA4600 55 CONS PKPOffutt AFB, Nebraska#FA460027Q0011
This is a Request for Quote (RFQ) for gas line repair services at Offutt Air Force Base. The contractor will repair and replace existing gas leaks on 6” and 8” pipes and valves, and associated components on 2” pipe and valves. New piping and components must be rated for natural gas distribution service. This acquisition is set aside for small businesses under NAICS 23712. A site visit is scheduled for December 1, 2026, at 1:00 PM CST. Questions are due by December 2, 2026, at 4:30 PM CST. The target price range is between $25,000 and $100,000.
On PublicBidSearch: the original bid posting, 6 bid documents and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Dec 8, 2026, 11:00 AM CT
- Time stated in bid documents
- Dec 8, 2026, 11:00 AM Central Time
- Performance bond
- 100%
- Payment bond
- 100%
- Submission
- email, electronic portal
- Documents analyzed
- 6 published · 5 analyzed
Scope of work
- Repair existing 6" gas line leak near B479 by replacing pipe and service tee.
- Replace leaking and inoperable 8" valves and flanges near B73.
- Replace 2" isolation valve on service line to B73.
- Perform pressure and operational testing of new piping and valves.
- Clean up and dispose of all removed equipment and project waste.
Steps to Bid
- 1
Complete and return the "55 SFS Form 31-Base Entry Authorization List" if you do not have the necessary identification to enter the base for the site visit. by Nov 24, 2026
- 2
Attend the site visit. by Dec 1, 2026, 1:00 PM
Access: Offutt Air Force Base is not an open base, and you must have a valid ID. Anyone who does not have the necessary identification to enter the base must complete the attachment titled “55 SFS Form 31-Base Entry Authorization List” and return by 24 November 2026. Base access is not guaranteed, if you are unable to complete the attachment in time base access may still be granted but you must express interest and will need to be escorted on.
- 3
Submit all questions in writing to the Contracting Office. by Dec 2, 2026, 4:30 PM
Answers to all questions will be posted via amendment to [link available with Pro] as soon as readily available.
What you'll need
Contract duration
30 Calendar Days
Submission
Email, Electronic portal
NAICS
237120
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 2 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
This is a Request for Quote (RFQ) for commercial SERVICES (Construction) in accordance with the format in Revolutionary Federal Acquisition Regulation Overhaul (RFO) Subpart 12.202(b)(1), as supplemented with additional information included in the notice.This announcement constitutes the only solicitation; quotes are being requested, and a separate solicitation will not be issued. Solicitation number FA460027Q0011 is issued as a Request for Quotation (RFQ). New piping and components shall be rated for natural gas distribution service in accordance with regulations and standards listed below in Other General Requirements. This acquisition is set aside for a small business concern under NAICS 23712 - Oil and Gas Pipeline and Related Structures Construction. This solicitation incorporates provisions and clauses by reference. The full text of provisions and clauses may be accessed electronically at [link available with Pro]. All prospective offerors must be registered in the System for Award Management (SAM) at [link available with Pro]. Lack of a SAM registration will make an offeror ineligible for award. APPLICABLE LABOR LAWS This solicitation is subject to the Construction Wage Requirements RFO 52.222-6 and the current wage determination, Davis Bacon Act WD # NE20260051, Revised on May 18, 2026. The most updated wage determination can be found at [link available with Pro]. SITE VISIT A site visit will take place on 1 December 2026, 1:00PM CST. Access: Offutt Air Force Base is not an open base, and you must have a valid ID. Anyone who does not have the necessary identification to enter the base must complete the attachment titled “55 SFS Form 31-Base Entry Authorization List” and return by 24 November 2026. Base access is not guaranteed, if you are unable to complete the attachment in time base access may still be granted but you must express interest and will need to be escorted on. QUESTIONS DUE DATE AND TIME All questions concerning this solicitation shall be sent in writing to the Contracting Office by 2 December 2026, 4:30 PM CST. Answers to all questions will be posted via amendment to [link available with Pro] as soon as readily available. OFFER DUE DATE AND TIME All offers must be submitted to the Contracting Office by 8 December, 2026, 11:00 AM CST. CONTRACTING OFFICE CONTACT INFORMATION All information regarding this solicitation shall be sent by email to: Contract Specialist – SSgt Darrell Gomba, [email available with Pro] Contracting Officer – SrA Dean White, [email available with Pro]
Key dates
- Questions due
- Dec 2, 2026, 4:30 PM Central Time
- Pre-bid meeting
- Dec 1, 2026, 1:00 PM Central Time
- Site visit
- Dec 1, 2026, 1:00 PM Central Time
- Bids due
- Dec 8, 2026, 11:00 AM CT
Documents
- 55_SFS_Form_31-Base_Entry_Authorization_List.docx
- Solicitation_-_FA460027Q0011.pdf25 pages
- PWS_Gas_Line_Repairs_rev3.pdf2 pages
- Site_Conditions.pdf2 pages
- 20261015_-_Environmental_Special_Conditions_-_Division_1-01_57-1C_3_Rev_0.pdf21 pages
- Wage_Determination_-_Heavy_-_NE20260051.pdf5 pages
More from this agency
- B304 Cooling Tower #3 Fan Drive Replacement and Electrical Repair — closes Dec 14, 2026
Similar open bids
- Springfield Highlands Storm Sewer and Paving — Sanitary and Improvement District No. 391 of Sarpy County
- Storm Sewer & Paving – Section I, Community Improvement District No. 1, City of Blair, Nebraska — City of Blair
Closing this week nearby
- Giles Road Widening Project — closes Nov 20, 2026
- 2027 Various Asphalt Overlays, Project C-77 (25-01) — closes Nov 20, 2026
- Request for Proposals: 2027 Various Asphalt Overlays, Project C-77 (25-01) for the Public Works Department — closes Nov 20, 2026
- Bridge #15 Rehabilitation, 36th Street over Big Papio Creek, Project C-77(24-18) — closes Nov 20, 2026
- Canopy Yard Cottonwood Commons Prequalified Caterers — closes Nov 20, 2026