Barry County Bridge Repair Bundle
Barry CountyMissouri
Work includes clearing and grubbing, concrete collar installation, substructure repairs, and rock blanket placement. The low water crossing replacement includes concrete toe walls, paving, corrugated metal pipe, and rock blanket. Bidders must purchase plans from Great River Engineering for $75 and be on the planholder list.
On PublicBidSearch: the newspaper notice and the agency contact (name and phone) for this bid.
Contact
Agency contact for this bidName and phone — included with ProProOverview
- Due
- Dec 10, 2026, 10:00 AM CT
- Time stated in bid documents
- Dec 10, 2026, 10:00 AM Central Time
- Submission
- mail, hand delivery
- Required submission items
- 2 items · full checklist with Pro
Scope of work
- Clear and grub overgrown foliage at bridge sites
- Install concrete collars around bridge abutments
- Perform formed and unformed substructure repairs on bridges
Steps to Bid
- 1
1
Purchase the digital plans and specifications from Great River Engineering (GRE) at 417-886-7171 for $75.00 (non-refundable).
What you'll need
Submission
Mail, Hand delivery
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 2 watch-outs that disqualify bidders
- The 2-item required-submittals checklist
Cancel anytime · no card to browse
Project details
A digital copy of the plans and specifications may be purchased through Great River Engineering (GRE), at 417-886-7171, upon payment of $75.00, which is not refundable.
Key dates
- Bids due
- Dec 10, 2026, 10:00 AM CT
Similar bids in Missouri
- Bridge Replacement over Union Pacific Railroad on Route 61, St. Genevieve County, Missouri · closes Dec 23, 2026
- 8 Bridge Rehabilitations on Route C, 7, and 13 in Henry and St. Clair Counties · closes Dec 18, 2026
- Bridge Rehabilitation over Osage River, Cole County · closes Dec 18, 2026
- Bridge Deck Replacement Over Hinkson Creek · closes Dec 18, 2026
- Bridge Replacement over Brewers Creek · closes Dec 18, 2026
Closing soon in Missouri
- Lease of Approximately 143.5 Acres of University-Owned Farmland for Row Crop Production · closes Dec 1, 2026
- City-wide IDIQ Electrical Services, Installation, Maintenance and Repairs · closes Dec 1, 2026
- Renovate CCC Restroom into Cabin at Washington State Park, Desoto, Missouri · closes Dec 3, 2026
- Request for Qualifications: Green Infrastructure Design & Construction Management Services for the City of St. Louis… · closes Dec 4, 2026
- Port Authority LPA Solicitation for Capability to Perform All Aspects of Project, Including Schedule and Budget… · closes Dec 4, 2026