BCMUD No. 57 Phase 3 Detention Basin Excavation, Spoil Placement & Outfall to Serve Ellwood Phase 3
Brazoria County Municipal Utility District No. 57Brazoria, Texas#221-022-202 DST (I)
Brazoria County Municipal Utility District No. 57 is soliciting bids for construction of a detention basin and storm sewer infrastructure. Scope includes 1,661 LF of 36”–60” RCP storm sewer, 236 LF of 6’x6’ RCB storm sewer, and 273,477 CY of excavation. A pre-bid meeting is scheduled for November 23, 2026, at 2:00 PM CT. Submissions must be delivered to EHRA via physical drop-off or Zoom.
On PublicBidSearch: the original bid posting and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Nov 30, 2026, 2:00 PM CT
- Time stated in bid documents
- Nov 30, 2026, 2:00 PM Central Time
- Submission
- hand delivery, email
Scope of work
- Excavate 273,477 CY of material
- Place spoil on designated site
- Connect to existing outfall system for Ellwood Phase 3
Steps to Bid
- 1
Register with EHRA and obtain access to the bid package.
- 2
Attend the pre-bid meeting on November 23, 2026, at 2:00 PM CT, held in person at EHRA and via Zoom. was Nov 23, 2026, 2:00 PM
This date has passed — confirm eligibility with the agency before bidding.
- 3
Submit a complete bid package by November 30, 2026, at 2:00 PM CT. by Nov 30, 2026, 2:00 PM
What you'll need
Submission
Hand delivery, Email
How to submit
Submit one original and one electronic copy via email to [email available with Pro]. Bid must be delivered in a sealed envelope labeled with the bid number and project title.
In person/mail: EHRA, 123 Main St, Houston, TX 77001
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 2 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
The project scope includes the installation of approximately 1,661 linear feet of 36-inch to 60-inch reinforced concrete pipe (RCP) storm sewer; 236 linear feet of 6-foot by 6-foot reinforced concrete box (RCB) storm sewer; and 273,477 cubic yards of excavation. Work shall include spoil placement and connection to the existing outfall system to serve Ellwood Phase 3.
Key dates
- Pre-bid meeting
- Nov 23, 2026, 2:00 PM Central Time
- Bids due
- Nov 30, 2026, 2:00 PM CT
More from this agency
- Brazoria County Municipal Utility District No. 57 Phase Three Detention Basin Excavation, Spoil Placement, and Outfall… · closes Nov 30, 2026
- Construction of Streetscape Improvements at Brazoria County Municipal Utility District No. 57 Meridiana Section 16 &… · closes Dec 3, 2026
- Invitation to Bid — Brazoria County Municipal Utility District No. 57: Phase Three Detention Basin Excavation, Spoil… · closes Dec 3, 2026
Similar bids near Brazoria County
- Excavation, Paving, and Grading for Crosby Farms, Section 6 and Section 8 · Houston · closes Dec 10, 2026
Closing soon near Brazoria County
- Nutrition Services Large and Small Equipment · Brazoria County · closes Nov 30, 2026
- Waste Water Treatment Plant (WWTP) Chemicals · Galveston · closes Dec 1, 2026
- Preventive Maintenance and Monitoring Program for Pumps and Motors · Hitchcock · closes Dec 1, 2026
- Construction of 12-INCH WATERLINE INTERCONNECT FROM KARSTEN BLVD · Iowa Colony · closes Dec 2, 2026
- Landscape, Hardscape, and Entry Infrastructure for Meridiana Section 16 & Brisco Pond · Brazoria County · closes Dec 3, 2026