Invitation to Bid — Brazoria County Municipal Utility District No. 57: Phase Three Detention Basin Excavation, Spoil Placement, and Outfall to Serve Ellwood Phase Three
Brazoria County Municipal Utility District No. 57Texas#221-022-202
Brazoria County Municipal Utility District No. 57 is soliciting sealed bids for the construction of Phase Three Detention Basin Excavation, Spoil Placement, and Outfall to Serve Ellwood Phase Three. The scope includes approximately 1,661 LF of 36”–60” RCP storm sewer, 236 LF of 6’x6’ RCB storm sewer, and 273,477 CY of excavation. Bids must be submitted electronically via CivCast USA or as a paper copy in duplicate by 2:00 p.m. on Monday, November 30, 2026. A non-mandatory pre-bid conference is scheduled for November 23, 2026, at 2:00 p.m. via Zoom. Each bid must include a Bid Bond or Certified/Cashier’s Check equal to 2% of the total bid amount, payable to the Owner. The Owner may reject any or all bids. Documents are available on [link available with Pro] or at the Engineer’s office.
On PublicBidSearch: the newspaper notice for this bid.
Overview
- Due
- Dec 3, 2026, 2:00 PM CT
- Bid bond
- 2%
- Submission
- electronic portal, mail
Scope of work
- Excavate 273,477 CY of material
- Perform work in accordance with plans, specs, and addenda
Steps to Bid
- 1
Review the bid documents, plans, and specifications available on Official linkPro or at the Engineer’s office.
- 2
Attend the non-mandatory pre-bid conference on November 23, 2026, at 2:00 p.m. via Zoom (call-in details posted on CivCast). was Nov 23, 2026, 2:00 PM
This date has passed — confirm eligibility with the agency before bidding.
- 3
Submit a sealed bid electronically via CivCast USA or as a paper copy in duplicate to EHRA, 10011 Meadowglen Lane, Houston, Texas 77042.
- 4
Ensure the bid is accompanied by a Bid Bond or Certified/Cashier’s Check equal to 2% of the total bid amount, payable to the Owner.
What you'll need
Submission
Electronic portal, Mail
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 4 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
Bids will be received by Brazoria County Municipal Utility District No. 57 at the office of the Engineer, EHRA, 10011 Meadowglen Lane, Houston, Texas 77042, and electronic bids delivered via CivCast, until 2:00 p.m. on Monday, November 30, 2026. All bids will be publicly opened and read, in person and via Zoom Conference Call, for the construction of the project: BRAZORIA COUNTY MUNICIPAL UTILITY DISTRICT NO. 57 PHASE THREE DETENTION BASIN EXCAVATION, SPOIL PLACEMENT, AND OUTFALL TO SERVE ELLWOOD PHASE THREE, Project No. 221-022-202. The project scope includes the installation of approximately 1,661 linear feet of 36”–60” RCP storm sewer, 236 linear feet of 6’x6’ RCB storm sewer, and 273,477 cubic yards of excavation. The work will be performed in accordance with the plans, specifications, and any addenda issued prior to the bid opening. Plans, specifications, and bid documents are available for free download or hard copy purchase on the CivCastUSA website ([link available with Pro]), and may also be reviewed at the office of the Engineer or in Houston area plan rooms. Each bid must be accompanied by a Certified or Cashier's Check from a responsible bank in Texas, or a Bid Bond issued by a surety authorized to do business in Texas, equal to 2% of the total bid amount. The Owner reserves the right to reject any or all bids or to accept any bid deemed advantageous, and may waive informalities in bidding. All bids received after the closing time will be returned unopened. Call-in details will be posted on the CivCast website. The notice was published in the Alvin Sun on November 11, 2026, and November 18, 2026.
Key dates
- Pre-bid meeting
- Nov 23, 2026, 2:00 PM Central Time
- Bids due
- Dec 3, 2026, 2:00 PM CT
More from this agency
- Brazoria County Municipal Utility District No. 57 Phase Three Detention Basin Excavation, Spoil Placement, and Outfall… · closes Nov 30, 2026
- BCMUD No. 57 Phase 3 Detention Basin Excavation, Spoil Placement & Outfall to Serve Ellwood Phase 3 · closes Nov 30, 2026
- Construction of Streetscape Improvements at Brazoria County Municipal Utility District No. 57 Meridiana Section 16 &… · closes Dec 3, 2026
Similar bids in Texas
- Village Grove Phase 3-3 Subdivision Improvements · closes Dec 11, 2026
- Mass Grading and Detention for Section 1 of Walnut Trail (On Behalf of Walnut Creek MUD) · closes Dec 21, 2026
- Construction of Detention and Grading to Serve Tamarron Detention Phase XII · closes Dec 8, 2026
- East Collin County MUD No. 1 Wastewater Treatment Facility – Phase 1, 0.15 MGD MBR WWTP Installation · closes Dec 17, 2026
- Wastewater Treatment Plant No. 1 - Phase 1 (0.15 MGD) Site Work to Serve Fort Bend County Municipal Utility District… · closes Dec 9, 2026
Closing soon in Texas
- Website Design & Web Application Development for Workforce Solutions Coastal Bend · closes Nov 30, 2026
- Roadway Widening to a Super 2 on State Highway 115, Winkler County, Texas · closes Dec 1, 2026
- Life Safety Cellular Systems · closes Dec 1, 2026
- Frontier Phase 5A - Paving Improvements · closes Dec 2, 2026
- Request for Information for Request for Qualifications: Title II Architect Engineering Services for Design-Build… · closes Dec 3, 2026