Bell Ferry Road / Roberts Boulevard / Vaughn Road Transit ADA Improvements
Cobb County GovernmentMarietta, Georgia#B2755
Cobb County is soliciting bids for construction of ADA-compliant ramps and sidewalk panels along Bell Ferry Road, Roberts Boulevard, and Vaughn Road in Marietta, GA. The project includes site prep, concrete work, and paving to meet federal and state accessibility standards. Bids must be submitted electronically via BidExpress by 12:00 noon on December 10, 2026. A mandatory pre-bid conference is scheduled for December 1, 2026, at 9:30 a.m. at Cobb County DOT. Contractors exceeding $2M must be prequalified with GDOT; those at or below $2M must be registered subcontractors or prequalified with GDOT. Subcontractors must also meet GDOT prequalification or registration.
On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Dec 10, 2026
- Time stated in bid documents
- Dec 10, 2026, 12:00 PM Eastern Time
- Bid bond
- 10%
- Performance bond
- 100%
- Payment bond
- 100%
- Submission
- electronic portal
- Documents analyzed
- 1
- Required submission items
- 3 items · full checklist with Pro
Scope of work
- Upgrade accessibility features on Vaughn Road
- Complete work within 150 days of Notice to Proceed
Steps to Bid
- 1
Register with BidExpress and download the bid documents
- 2
Attend the mandatory pre-bid conference on December 1, 2026, at 9:30 a.m. at Cobb County DOT by Dec 1, 2026, 9:30 AM
- 3
Submit a complete bid package via BidExpress by 12:00 noon on December 10, 2026 by Dec 10, 2026, 12:00 PM
What you'll need
Prequalification
RequiredContract duration
150 calendar days from Notice to Proceed
Submission
Electronic portal
NAICS
237130, 237199
How to submit
Submit via BidExpress at Official linkPro. All documents must be uploaded in the required format and submitted by 12:00 noon on December 10, 2026.
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 5 watch-outs that disqualify bidders
- The 3-item required-submittals checklist
Cancel anytime · no card to browse
Project details
Bidders exceeding $2,000,000 must be prequalified with GDOT; those at or below $2,000,000 must be registered subcontractors or prequalified with GDOT.
Key dates
- Pre-bid meeting
- Dec 1, 2026, 9:30 AM Eastern Time
- Bids due
- Dec 10, 2026
Documents
- B2755_MDJ_Legal_Ad-1.pdf2 pages
More from this agency
- Canton Road at Lake Drive / Old Noonday School House Road — closes Dec 10, 2026
- Cobb Parkway at McCollum Parkway Realignment — closes Feb 25, 2027
- Request for Qualifications for Prequalification of New Contractors for Cobb County Water System for 2026–2028 Period — closes May 31, 2028
Similar open bids
- Asphalt Materials for Douglas County, Georgia Projects — Douglas County Board Of Commissioners
- Boat Ramp Renovations at Raysville Campground and Rousseau Creek Road — Mcduffie County Board Of Commissioners
- Intersection Improvements on SR 6/SR101 at Coots Lake, Polk County, Georgia — Transportation-2, Department Of
- Uvalda East Oak Street and South Railroad Street Paving and Resurfacing — Uvalda, City Of
- Concrete Materials Request for Quote (RFQ) – Douglas County, Georgia — Douglas County Board Of Commissioners
Closing this week nearby
- Generator Set, Diesel (NSN 6115016275690) — closes Nov 19, 2026
- On-Call HVAC Services — closes Nov 19, 2026
- Grease Interceptor Maintenance, Cleaning and Inspection Services at Hartsfield-Jackson Atlanta International Airport — closes Nov 19, 2026
- Spiva Cove Bridge Replacement and Kiutuestia Creek Road Culvert Repair at Lows Mill Road — closes Nov 19, 2026
- Thomas Murphy Ballroom Back-of-House and Kitchen Flooring Replacement — closes Nov 19, 2026