Black Ripstop Fabric for Tabor City Sewing Plant
Department of Adult CorrectionNorth Carolina#Doc2457784312
The contract is for an 'As Needed' basis over a three-year term with no guaranteed minimum or maximum quantity. The fabric must meet strict specifications including 108 x 48 picks per inch, 6.75 oz per square yard weight, 65% polyester/35% cotton, 63-inch width, and flammability compliance. Vendors must submit a 2-yard sample by January 6, 2027, at 2:00 PM ET. Bids must be submitted electronically via the NC eProcurement Sourcing Tool by the same deadline. The contract manager is Lorraine Middleton; the plant manager is Sharon Jones.
On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Jan 6, 2027
- Time stated in bid documents
- Jan 6, 2027, 2:00 PM Eastern Time
- Submission
- electronic portal
- Contract term
- three (3) years, beginning on the date of final Contract execution
- Documents analyzed
- 1
Scope of work
- Furnish and deliver 150,000 yards of Black Ripstop Fabric
- Submit 2-yard sample head end to Tabor City Sewing Plant by January 6, 2027
- Deliver FOB Destination to Tabor City, NC within 30 days of purchase order
- Provide manufacturer authorization and certification of financial condition
Steps to Bid
- 1
Register in the NC eProcurement Sourcing Tool and obtain an eVP number.
- 2
Review the full IFB document, attachments, and Instructions to Vendors.
- 3
Submit written questions via the Sourcing Tool's message board by December 1, 2026, at 10:00 AM ET. by Dec 1, 2026, 10:00 AM
- 4
Submit a 2-yard sample head end to the Tabor City Sewing Plant at 4600 Swamp Fox Hwy W, Tabor City, NC 28463, by January 6, 2027, at 2:00 PM ET. by Jan 6, 2027, 2:00 PM
- 5
Complete and submit all required attachments in the Sourcing Tool, including the Pricing Form, Customer Reference Form, Certification of Financial Condition, Sustainability Efforts, and Alcohol/Drug-Free Workplace Policy. by Jan 6, 2027, 2:00 PM
- 6
Submit the final bid response through the Sourcing Tool by January 6, 2027, at 2:00 PM ET. by Jan 6, 2027, 2:00 PM
What you'll need
Submission
Electronic portal
NAICS
313990
How to submit
Bids must be submitted through the NC eProcurement Sourcing Tool. The Sourcing Tool will not accept submissions via the Message Board. All required attachments must be completed and uploaded in the Sourcing Tool. The final submission must be completed and confirmed in the system by the deadline. Late submissions will be rejected. Bids must be submitted in the Sourcing Tool by January 6, 2027, at 2:00 PM ET.
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 6 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
The fabric is intended for use in manufacturing correctional clothing and other products under the Correction Enterprises program. The solicitation is for a single line item: 150,000 yards of Black Ripstop Fabric, with specifications including 108 ends x 48 picks per inch, 6.75 oz per square yard weight, 65% polyester and 35% cotton fiber content, 63-inch width, and compliance with Flammability Standards (Part 1610, CS-191-53).
Key dates
- Questions due
- Dec 1, 2026, 10:00 AM Eastern Time
- Bids due
- Jan 6, 2027
Documents
- 52-IFB-2457784312-MLE-Black_Ripstop_Fabric-Tabor_City_Sewing_Plant-11-18-202.pdf27 pages
More from this agency
- 32 oz Carafe Bottle and Cap Sets · closes Dec 1, 2026
- Officer and Healthcare Patches – Columbus Sewing Plant · closes Dec 2, 2026
- Passover Seder Items · closes Dec 4, 2026
- Locum Tenens Dentists, Assistants, and Hygienists for North Carolina Department of Adult Correction Dental Clinics · closes Dec 8, 2026
- Mobile MRI Services · closes Dec 11, 2026
Similar bids in North Carolina
- Cape Fear Valley School of Nursing - Multi-room Renovation · closes Dec 4, 2026
- Currituck Water System Improvements Phase 1 · closes Dec 10, 2026
- Re-Bid for Cabarrus Youth Development Center Building Automation System and Fire Safety System Renovation · closes Dec 15, 2026
- New Peck Playfield at Old Peck Site · closes Dec 10, 2026
- Residence Hall Renovations - Royall Residence Hall (Construction Bid Solicitations from Prequalified Contractors) · closes Dec 3, 2026
Closing soon in North Carolina
- Wake CC: Fire Alarm Replacement · closes Nov 30, 2026
- Southwestern Community College Facilities Capital Project List · closes Dec 3, 2026
- Jones Ferry Road WTP Rapid Mix Improvements · closes Dec 3, 2026
- HQS and NSPIRE Inspection Services · closes Dec 3, 2026
- Coke Building / Warehouse Fence Project · closes Dec 4, 2026