Bridge Reconstruction and Approach Work on Treat Highway over Black Creek, Lenawee County
Michigan Department of Transportation — MDOTMichigan#46000-220683
This is a construction solicitation for bridge reconstruction and approach work on Treat Highway over Black Creek in Lenawee County, Michigan. The project includes replacement of the bridge with 36-inch x 49-inch prestressed concrete beams. The work is being conducted by a Local Agency under the Michigan Department of Transportation. Bids are due December 4, 2026, at 10:30 AM local time at 425 W. Ottawa St., Lansing, MI 48933. The project is classified under Net Classification 3125 Fa. Required SBP participation is 3.00%. The completion date is set for September 24, 2027.
Overview
- Due
- Dec 4, 2026
- Time stated in bid documents
- Dec 4, 2026, 10:30 AM Eastern Time
- Bid bond
- 10%
- Performance bond
- 100%
- Payment bond
- 100%
- Submission
- mail, hand delivery
- Contract term
- 3 years + two additional one-year renewal terms
- Documents analyzed
- 1
Steps to Bid
- 1
Register with MDOT eProp system to access proposal and plans.
- 2
Review the full bid package, including plans and specifications, available at Official linkPro.
- 3
Submit a bid proposal by December 4, 2026, at 10:30 AM local time. by Dec 4, 2026, 10:30 AM
- 4
Submit a bid bond, if required, with the proposal. by Dec 4, 2026, 10:30 AM
What you'll need
Submission
Mail, Hand delivery
NAICS
237130, 237199
How to submit
Bids must be submitted in a sealed envelope marked 'Bid for 46000-220683' and delivered to the address above by 10:30 AM on December 4, 2026. Late submissions will not be accepted.
In person/mail: 425 W. Ottawa St., Lansing, MI 48933
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
Cancel anytime · no card to browse
Project details
Contract ID: 46000-220683. Control Section: BFPO 46000. Project Number: 220683A. Federal Project Number: 26A1188. Estimated pages for plans: 68. Date advertised: November 6, 2026.
Key dates
- Bids due
- Dec 4, 2026
Documents
- ads.pdf33 pages
Contact
Agency contact for this bidName, email & phone — included with ProProMore from this agency
- Road Reconstruction, Drainage, and Bridge Work on I-475 and Approaches in Flint and Burton, Genesee County, MI — closes Nov 20, 2026
- Construction of Noise Barrier Wall, Concrete Barrier, Steel Sheet Piling, Drilled Shafts, Curb and Gutter, Drainage,… — closes Nov 20, 2026
- 0.06 mi of Hot Mix Asphalt Widening, Concrete Curb, Gutter, Sidewalk, and Ramps on I-94BL at Ravenswood Road in… — closes Dec 4, 2026
- Bridge Rehabilitation on M-77 over the Manistique River, Schoolcraft County — closes Dec 4, 2026
- Clearing of Clear Zones on M-66 from M-60 to Glenn Cross Road, Branch and Calhoun Counties — closes Dec 4, 2026
Similar open bids
- Bridge Rehabilitation on US-41 over Sturgeon River and M-28 over Ontonagon River, Baraga and Ontonagon Counties — Michigan Department of Transportation
- Bridge Rehabilitation Including Partial Slab Replacement, Full Depth Patching, Substructure Patching, and Approach… — Michigan Department of Transportation
- Bridge Rehabilitation on I-96 Under Morrison Lake Road, Ionia County, Michigan — Michigan Department of Transportation
- Bridge Rehabilitation on US-31 over Bear Creek in Petoskey, Emmet County, Michigan — Michigan Department of Transportation
Closing this week nearby
- Purchase of Two (2) Single Axle and Three (3) Tandem Axle Cab and Chassis Trucks — closes Nov 9, 2026
- 701 Orange St - Remove & Replace Roof & Gutterwork — closes Nov 9, 2026
- 701 Orange St - New Furnace & Water Heater — closes Nov 9, 2026
- Electrical Repairs to Code at 701 Orange St, Jackson, MI — closes Nov 9, 2026
- CHJ 549 Health Care Request Form — closes Nov 9, 2026