OpenConstructionCloses Dec 4, 2026

Bridge Rehabilitation on US-41 over Sturgeon River and M-28 over Ontonagon River, Baraga and Ontonagon Counties

Michigan Department of Transportation — MDOTMichigan#07012-219333

The Michigan Department of Transportation (MDOT) is soliciting bids for the rehabilitation of two bridges: US-41 over Sturgeon River and M-28 over Ontonagon River in Baraga and Ontonagon Counties. Work includes removal and replacement of epoxy overlay, deck and substructure patching, expansion joint replacement, superstructure and rail system repairs, and full painting. A 5-year performance warranty is required for the epoxy overlay and a 2-year warranty for the bridge coating. The project is expected to be completed by October 29, 2027. Bids are due at 10:30 AM local time on December 4, 2026, at 425 W. Ottawa St., Lansing, MI 48933. Proposal and plans are available online.

Open Original Bid Source Pro

Overview

Due
Dec 4, 2026
Bid bond
10%
Performance bond
100%
Payment bond
100%
Submission
mail, hand delivery
Documents analyzed
1

Steps to Bid

  1. 1

    Review the full bid package, including plans and specifications, available at Official linkPro.

  2. 2

    Submit questions to MDOT by the deadline specified in the solicitation (not explicitly stated in the provided documents).

  3. 3

    Submit a complete bid package, including the signed bid form, bid bond, and all required documentation, by 10:30 AM local time on December 4, 2026. by Dec 4, 2026, 10:30 AM

  4. 4

    Deliver the bid package in person or by mail to the MDOT Bid Letting Office at 425 W. Ottawa St., Lansing, MI 48933. by Dec 4, 2026, 10:30 AM

What you'll need

Contract duration

10/29/2027

Submission

Mail, Hand delivery

NAICS

455810, 455820, 455830, 455840, 455850, 455860, 455870, 455880, 455890

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 3 watch-outs that disqualify bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

Scope includes removal of existing epoxy overlay, application of new epoxy overlay, deck patching, expansion joint replacement, thrie beam retrofit, patching of concrete rail posts and rail balustrades, replacement of R4 railing posts, superstructure repairs, full paint, substructure patching, and approach work. The completion date is October 29, 2027. Proposal and plans are available online at [link available with Pro].

Key dates

Bids due
Dec 4, 2026

Documents

  • ads.pdf8 pages

See all documents · Download with Pro