Bridge Rehabilitation on US-41 over Sturgeon River and M-28 over Ontonagon River, Baraga and Ontonagon Counties
Michigan Department of Transportation — MDOTMichigan#07012-219333
The Michigan Department of Transportation (MDOT) is soliciting bids for the rehabilitation of two bridges: US-41 over Sturgeon River and M-28 over Ontonagon River in Baraga and Ontonagon Counties. Work includes removal and replacement of epoxy overlay, deck and substructure patching, expansion joint replacement, superstructure and rail system repairs, and full painting. A 5-year performance warranty is required for the epoxy overlay and a 2-year warranty for the bridge coating. The project is expected to be completed by October 29, 2027. Bids are due at 10:30 AM local time on December 4, 2026, at 425 W. Ottawa St., Lansing, MI 48933. Proposal and plans are available online.
Overview
- Due
- Dec 4, 2026
- Bid bond
- 10%
- Performance bond
- 100%
- Payment bond
- 100%
- Submission
- mail, hand delivery
- Documents analyzed
- 1
Steps to Bid
- 1
Review the full bid package, including plans and specifications, available at Official linkPro.
- 2
Submit questions to MDOT by the deadline specified in the solicitation (not explicitly stated in the provided documents).
- 3
Submit a complete bid package, including the signed bid form, bid bond, and all required documentation, by 10:30 AM local time on December 4, 2026. by Dec 4, 2026, 10:30 AM
- 4
Deliver the bid package in person or by mail to the MDOT Bid Letting Office at 425 W. Ottawa St., Lansing, MI 48933. by Dec 4, 2026, 10:30 AM
What you'll need
Contract duration
10/29/2027
Submission
Mail, Hand delivery
NAICS
455810, 455820, 455830, 455840, 455850, 455860, 455870, 455880, 455890
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 3 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
Scope includes removal of existing epoxy overlay, application of new epoxy overlay, deck patching, expansion joint replacement, thrie beam retrofit, patching of concrete rail posts and rail balustrades, replacement of R4 railing posts, superstructure repairs, full paint, substructure patching, and approach work. The completion date is October 29, 2027. Proposal and plans are available online at [link available with Pro].
Key dates
- Bids due
- Dec 4, 2026
Documents
- ads.pdf8 pages
Contact
Agency contact for this bidName, email & phone — included with ProProMore from this agency
- Road Reconstruction, Drainage, and Bridge Work on I-475 and Approaches in Flint and Burton, Genesee County, MI — closes Nov 20, 2026
- Construction of Noise Barrier Wall, Concrete Barrier, Steel Sheet Piling, Drilled Shafts, Curb and Gutter, Drainage,… — closes Nov 20, 2026
- 0.06 mi of Hot Mix Asphalt Widening, Concrete Curb, Gutter, Sidewalk, and Ramps on I-94BL at Ravenswood Road in… — closes Dec 4, 2026
- Bridge Rehabilitation on M-77 over the Manistique River, Schoolcraft County — closes Dec 4, 2026
- Clearing of Clear Zones on M-66 from M-60 to Glenn Cross Road, Branch and Calhoun Counties — closes Dec 4, 2026
Similar open bids
- Bridge Rehabilitation Including Partial Slab Replacement, Full Depth Patching, Substructure Patching, and Approach… — Michigan Department of Transportation
- Bridge Reconstruction and Approach Work on Treat Highway over Black Creek, Lenawee County — Michigan Department of Transportation
- Bridge Rehabilitation on I-96 Under Morrison Lake Road, Ionia County, Michigan — Michigan Department of Transportation
- Bridge Rehabilitation on US-31 over Bear Creek in Petoskey, Emmet County, Michigan — Michigan Department of Transportation
Closing this week nearby
- Purchase of Two (2) Single Axle and Three (3) Tandem Axle Cab and Chassis Trucks — closes Nov 9, 2026
- 701 Orange St - Remove & Replace Roof & Gutterwork — closes Nov 9, 2026
- 701 Orange St - New Furnace & Water Heater — closes Nov 9, 2026
- Electrical Repairs to Code at 701 Orange St, Jackson, MI — closes Nov 9, 2026
- CHJ 549 Health Care Request Form — closes Nov 9, 2026