Bridge Replacement Over Huzzah Creek
Missouri Department of Transportation — MoDOTMissouri#261218-D06
This project involves the replacement of a bridge over Huzzah Creek on Route 32 in Dent County, Missouri. The work includes a wide range of construction activities such as excavation, paving, bridge construction, guardrail installation, and traffic control. The contract completion date is December 1, 2027. Bids must be submitted electronically via Bid Express. A bid bond is required. Prevailing wage rates apply.
On PublicBidSearch: the original bid posting, 6 bid documents and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Dec 18, 2026, 11:00 AM CT
- Submission
- electronic portal
- Documents analyzed
- 6 published · 3 analyzed
Scope of work
- Includes clearing, excavation, embankment, and aggregate base.
- Paving with bituminous mixture and tack coat.
- Installation of guardrail, crash terminals, and signs.
- Bridge construction including concrete piles, substructure concrete, slab on steel, and structural steel girders.
- Temporary traffic control, pavement marking, and erosion control measures.
Steps to Bid
- 1
Submit bids electronically using "Bid Express Secure Internet Bidding" at Official linkPro.
Paper bids will be considered irregular.
- 2
Complete the Bid form from the Bidx website.
- 3
Bid only one of the two alternates for Alternate Pavements and leave the contract unit price column blank for any pay item listed for the other alternate.
- 4
Ensure bid is not submitted in the Schedule of Items folder or the Signature and Identity of Bidder folder.
Use the yellow checkmark (Check Bid) at the top to list any errors.
What you'll need
Contract duration
176 calendar days for Subproject B; March 31, 2027 for Subproject A; December 1, 2027 for Subproject B
Submission
Electronic portal
NAICS
237310
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 10 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
Job JCD0235: Route 32, Dent County. Bridge replacement over Huzzah Creek in Boss, MO, for a total length of 0.248 miles. Contract ID: 261218-D06. Federal Project Number(s): FAF 19-1(23). The project involves clearing and grubbing, removal of improvements, various types of excavation and embankment, aggregate for base, bituminous pavement mixture, tack coat, rock blanket, temporary traffic control devices (changeable message signs, work zone traffic signal system, temporary rumble strips, lump sum temporary traffic control), pavement marking (preformed thermoplastic, paint, removal), erosion control, surveying and staking, pipe installation (84-inch, 12-inch, 18-inch), mulching, seeding, sediment traps, rock ditch checks, silt fence, Type C berm, guardrail, bridge approach transition sections, crashworthy end terminals, posts and anchors for signs, flat sheet signs, bridge excavation, removal of bridges, bridge approach slabs, galvanized cast-in-place concrete piles, pre-bore for piling, Class B concrete (substructure), slab on steel, Type H barrier, reinforcing steel, fabricated structural low alloy steel (plate girder), finished field coat, vertical drains, and laminated neoprene bearing pads. Prevailing wage rates apply as determined by the Missouri Department of Labor and Industrial Relations and the United States Department of Labor.
Key dates
- Bids due
- Dec 18, 2026, 11:00 AM CT
Documents
- 261218_D06_JCD0235_BID_BOOK.pdf16 pages
- 261218_D06_JCD0235_JSP_Roadway.pdf44 pages
- 261218_D06_JCD0235_Bridge_JSP.pdf3 pages
- 261218_D06_JCD0235_PLANS.pdf75 pages
- 261218_D06_JCD0235_X_SECTIONS.pdf19 pages
- 261218_Notice_To_Contractors.pdf8 pages
More from this agency
- Supplemental Workforce for STIP Projects — Construction and Materials Division, District CO — closes Nov 18, 2026
- MoDOT KC District - Half Ton Crew Cab Long Bed Pickups Price Quote Request — closes Nov 19, 2026
- Commercial Rotary Cutters for Missouri Highways and Transportation — closes Nov 19, 2026
- Culvert Replacement and ADA Improvements over Muddy Creek in Harrisonville, Route 2, Cass County — closes Nov 20, 2026
- ADA Improvements and Pavement Replacement on Route 96 in Jasper County — closes Nov 20, 2026
Similar open bids
- Coldmill, Resurface, and Bridge Rehabilitation on Route 68 in Maries and Phelps Counties — Missouri Department of Transportation
- Bridge Rehabilitation Over Route 54 Near Holts Summit, Callaway County — Missouri Department of Transportation
- Bridge Replacement over Brewers Creek — Missouri Department of Transportation
- Bridge and Culvert Replacement in Greene County — Missouri Department of Transportation
- Bridge Replacement over Shetley Creek and Big Creek, Route M, Madison County, MO — Missouri Department of Transportation
Closing this week nearby
- Alton R-Iv School District: E-Rate FY2027 Category 2 - Switches and Necessary Software and Licenses; Switches — closes Nov 18, 2026
- Guard Wheel Power Truck Shade Window Right Side (Core Return) — OEM Only, Per Bi-State Specifications — closes Nov 19, 2026
- ISD Santa Fe Trails Elementary School Roof Improvements — closes Nov 19, 2026
- New Ballas Sidewalk Project – Phase 3 — closes Nov 19, 2026