Bridge Replacement over Shetley Creek and Big Creek, Route M, Madison County, MO
Missouri Department of Transportation — MoDOTMissouri#261218-H05
MoDOT is seeking bids for the replacement of two bridges on Route M in Madison County, Missouri: one over Shetley Creek (0.17 miles) and one over Big Creek (0.2 miles). The contract, 261218-H05, is for a total value between $2.5M and $5M. Bids must be submitted electronically via Bid Express by 11:00 AM CT on December 18, 2026. The successful bidder must submit a bid bond equal to 5% of the bid amount. The work includes full bridge construction, earthwork, excavation, concrete and steel work, guardrail, signing, pavement marking, and erosion control. The project is subject to prevailing wage laws. The work site is in Madison County, Missouri.
On PublicBidSearch: the original bid posting, 6 bid documents and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Dec 18, 2026, 11:00 AM CT
- Time stated in bid documents
- Dec 18, 2026, 11:00 AM Central Time
- Bid bond
- 5%
- Performance bond
- 100%
- Payment bond
- 100%
- Submission
- electronic portal
- Contract term
- 12/1/28
- Documents analyzed
- 6 published · 3 analyzed
- Required submission items
- 7 items · full checklist with Pro
Scope of work
- Construct new bridge substructure and superstructure
- Excavate and backfill for bridge foundations
- Install steel piling and concrete substructure
- Construct concrete deck and guardrail
Steps to Bid
- 1
Register and obtain a digital ID for Bid Express (may take 5 business days)
- 2
Submit all required forms and documents via Bid Express by 11:00 AM CT on December 18, 2026 by Dec 18, 2026, 11:00 AM
- 3
Ensure all bid documents are properly formatted and submitted electronically by Dec 18, 2026, 11:00 AM
What you'll need
Contract duration
12/1/28
Submission
Electronic portal
NAICS
237130
How to submit
All bids must be submitted electronically through Bid Express at Official linkPro. Paper bids will be considered irregular. Bidders must use the Bid Express system and submit all required forms and documents via the electronic portal. The bid must be submitted with a digital ID. The bid bond must be submitted electronically via Bid Express. The Subcontractor Disclosure Form must be submitted to the Design Division by 4:00 PM on the third business day after the bid opening date if not available at the time of bid submission.
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 3 watch-outs that disqualify bidders
- The 7-item required-submittals checklist
Cancel anytime · no card to browse
Project details
Job JSE0036: Bridge replacement over Shetley Creek northeast of Buckhorn, 0.17 miles in length. Job JSE0037: Bridge replacement over Big Creek northeast of Buckhorn, 0.2 miles in length. The contract is identified as 261218-H05 and is part of MoDOT's December 18, 2026, letting. The estimated contract value is between $2.5 million and $5 million. The period of performance is 12/1/28. The project is subject to prevailing wage requirements under Missouri and federal law.
Key dates
- Bids due
- Dec 18, 2026, 11:00 AM CT
Documents
- 261218_H05_JSE0036_JSE0037_Bid_Book.pdf19 pages
- 261218_H05_JSE0036_JSE0037_JSP_Roadway_S.pdf
- 261218_H05_JSE0036_JSE0037_JSP_Bridge.pdf4 pages
- 261218_H05_JSE0036_JSE0037_X_Sections.pdf
- 261218_Notice_To_Contractors.pdf8 pages
1 agency-portal link
More from this agency
- Supplemental Workforce for STIP Projects — Construction and Materials Division, District CO — closes Nov 18, 2026
- MoDOT KC District - Half Ton Crew Cab Long Bed Pickups Price Quote Request — closes Nov 19, 2026
- Commercial Rotary Cutters for Missouri Highways and Transportation — closes Nov 19, 2026
- Culvert Replacement and ADA Improvements over Muddy Creek in Harrisonville, Route 2, Cass County — closes Nov 20, 2026
- ADA Improvements and Pavement Replacement on Route 96 in Jasper County — closes Nov 20, 2026
Similar open bids
- Coldmill, Resurface, and Bridge Rehabilitation on Route 68 in Maries and Phelps Counties — Missouri Department of Transportation
- Bridge Rehabilitation Over Route 54 Near Holts Summit, Callaway County — Missouri Department of Transportation
- Bridge Replacement Over Huzzah Creek — Missouri Department of Transportation
- Bridge Replacement over Brewers Creek — Missouri Department of Transportation
- Bridge and Culvert Replacement in Greene County — Missouri Department of Transportation
Closing this week nearby
- Alton R-Iv School District: E-Rate FY2027 Category 2 - Switches and Necessary Software and Licenses; Switches — closes Nov 18, 2026
- Guard Wheel Power Truck Shade Window Right Side (Core Return) — OEM Only, Per Bi-State Specifications — closes Nov 19, 2026
- ISD Santa Fe Trails Elementary School Roof Improvements — closes Nov 19, 2026
- New Ballas Sidewalk Project – Phase 3 — closes Nov 19, 2026