OpenConstructionCloses Dec 8, 2026

Bridge Replacement - S-46-1474 Smith Road over Morris Branch (Closed) - York County

South Carolina Department of Transportation — SCDOTSouth Carolina#4676390

The South Carolina Department of Transportation (SCDOT) is soliciting bids for the replacement of a bridge on S-46-1474 Smith Road over Morris Branch in York County. The project includes removal of the existing bridge and pavement, excavation, grading, asphalt paving, installation of structural concrete and reinforcement, drainage and utility work, traffic control, and erosion control. The work is to be completed by September 30, 2027. Bidders must be prequalified by SCDOT. A mandatory pre-bid conference is required. Proposals must be submitted electronically via BidX. The notice is for a construction project under the Federal-Aid Highway Program.

On PublicBidSearch: the original bid posting, 2 bid documents and the agency contact (name, email and phone) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName, email and phone — included with ProPro

Overview

Due
Dec 8, 2026
Time stated in bid documents
Dec 8, 2026, 2:00 PM Eastern Time
Submission
electronic portal
Contract term
3 years + two additional one-year renewal terms
Documents analyzed
2

Scope of work

  • Excavate and grade site
  • Install drainage and utility systems
  • Pave with asphalt base and surface courses
  • Install traffic control and pavement markings

Steps to Bid

  1. 1

    Register and obtain a user account on the SCDOT Construction Extranet (Official linkPro) to access proposal documents, plans, and bid forms.

  2. 2

    Download and complete the bid form from BidX (Official linkPro).

  3. 3

    Attend the mandatory pre-bid conference on November 5, 2026, at 10:00 AM in the 5th-floor auditorium at 955 Park Street, Columbia, SC. Contractors who do not attend will not be allowed to submit a bid. was Nov 5, 2026, 10:00 AM

    This date has passed — confirm eligibility with the agency before bidding.

What you'll need

Prequalification

Required

Submission

Electronic portal

NAICS

237130, 237199

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 3 watch-outs that disqualify bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

Work includes removal of existing bridge and pavement, excavation, borrow and muck excavation, grading, flowable fill, asphalt base and surface courses, traffic control, pavement markings, installation of 2.0-inch Schedule 80 PVC conduit, structural concrete (Class 4000 and Class 4000DS), non-shrink grout, reinforcement steel, 3'-0'' x 3'-3'' box beams, 42-inch mash concrete barrier parapet/railling wall, dynamic pile analyzer test setup, pile driving setup, reinforced pile tips (HP14 x 89), steel H bearing piling (HP14 x 89), 18-inch smooth wall pipe, drilled pile setup, soil and rock excavation for drilled pile foundations, beveling of pipe ends, concrete curb and gutter (2'-0'' vertical face), elastomeric bearings, waterproofing, liquid membrane waterproofing (bridge deck), rip-rap (Class A and Class B), geotextile for erosion control under riprap (Class 2, Type B), leading end treatment (TL2), standard shoulder (MGS3 GR), and barrier connector (MTBBC2). Project completion date is 9/30/2027. DBE goal is 0.00%. Bid forms are available on BidX ([link available with Pro]). Proposals and plans are accessible via the SCDOT Construction Extranet. The proposal governs over this notice; quantities are approximate.

Key dates

Pre-bid meeting
Nov 5, 2026, 10:00 AM Eastern Time
Bids due
Dec 8, 2026

Documents

  • 12-2026.pdf1 pages
  • 12082026_Notice_To_Contractors.pdf31 pages

See all documents · Download with Pro