Town of Patrick - Sidewalk TAP Project - Chesterfield County
South Carolina Department of Transportation — SCDOTSouth Carolina#1378610
The Town of Patrick is procuring construction of a 0.35-mile sidewalk along SC Highway 102 Turnage and Cranford Street in Chesterfield County, SC. Scope includes excavation, pipe installation, concrete sidewalks and driveways, detectable warning materials, pedestrian ramps, rip-rap, and pavement markings. The project is funded by federal sources. Bidders must attend a mandatory pre-bid conference on November 5, 2026, at 10:00 AM in Columbia, SC. The proposal and plans are available on the SCDOT Construction Extranet and Bid Express.
On PublicBidSearch: the original bid posting, 2 bid documents and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Dec 8, 2026
- Time stated in bid documents
- Dec 8, 2026, 2:00 PM Eastern Time
- Submission
- electronic portal
- Documents analyzed
- 2
Scope of work
- Construct 1,000 square yards of 4-inch uniform concrete sidewalk
- Install 256 linear feet of 15-inch smooth wall pipe and 80 linear feet of 18-inch smooth wall pipe
- Provide 100 square yards of pedestrian ramp construction
- Install 5 tons of Class B rip-rap and 2.2 square yards of Class 2 Type B geotextile for erosion control
- Mark 74 linear feet of 4-inch white broken lines (fast dry paint) and 48 linear feet of 24-inch white solid lines (fast dry paint)
Steps to Bid
- 1
Register on the SCDOT Construction Extranet and Bid Express (Official linkPro) to access the proposal, plans, and bid forms.
- 2
Attend the mandatory pre-bid conference on November 5, 2026, at 10:00 AM in the 5th-floor auditorium at 955 Park Street, Columbia, SC. Contractors who do not attend will not be allowed to submit a bid. was Nov 5, 2026, 10:00 AM
This date has passed — confirm eligibility with the agency before bidding.
What you'll need
Submission
Electronic portal
NAICS
237130, 237199
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 2 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
Work includes selected clearing and grubbing, removal and disposal of existing pavement, unclassified and borrow excavation, station grading, maintenance stone, liquid asphalt binder PG64-22, asphalt surface course Type C, driveway paving—surface Type C, traffic control, permanent construction signs (ground-mounted), pavement markings (4-inch white broken lines, 24-inch white solid lines, and thermoplastic markings), installation of 15-inch and 18-inch smooth wall pipes, cleaning of existing pipes, concrete collar for up to 24-inch pipe, concrete sidewalk (4-inch uniform), detectable warning material, concrete driveway (6-inch uniform), pedestrian ramp construction, rip-rap (Class B), geotextile for erosion control under riprap (Class 2, Type B), and permanent grassing. Approximate length: 0.35 miles. Completion date: July 31, 2027. The proposal governs over this notice; quantities are approximate.
Key dates
- Pre-bid meeting
- Nov 5, 2026, 10:00 AM Eastern Time
- Bids due
- Dec 8, 2026
Documents
- 12-2026.pdf1 pages
- 12082026_Notice_To_Contractors.pdf31 pages
More from this agency
- Section/Corridor Improvement - SC 48 (Assembly Street) MP 0 - MP 2.5 - Phase 2 - Multi-Use Path - Richland County · closes Dec 8, 2026
- South Carolina Department of Transportation — Regular Highway Letting, December 8, 2026 · closes Dec 8, 2026
- SC 97 (Great Falls Hwy.) MP 18.58 to MP 29.109, Chester County — Roadway Departure Mitigation · closes Dec 8, 2026
- Bridge Replacement - S-46-1474 Smith Road over Morris Branch (Closed) - York County · closes Dec 8, 2026
- Carolina Crossroads Phase 3A - Frontage Roads and Utilities, Lexington & Richland Counties · closes Dec 8, 2026
Similar bids in South Carolina
- Keith Drive & Lowndes Hill Sidewalks · closes Dec 10, 2026
- FY 2024-2025 CDBG Sidewalks · North Charleston · closes Dec 2, 2026
- Sidewalk Repairs & Improvements – 4” Sidewalk, 6” Driveways, Curb & Gutter · Conway
- Pedestrian Safety Phase 3 - Vardry Street Improvements · Greenville · closes Dec 8, 2026
- Mauldin Sidewalks · Mauldin · closes Dec 3, 2026
Closing soon in South Carolina
- FRAUD ALERT- Emails Impersonating South Carolina Procurement Staff · closes Nov 30, 2026
- Deer Park Middle School Classroom Addition · closes Dec 1, 2026
- BTMS HVAC Unit Upgrades · closes Dec 3, 2026
- Pine Street Elementary School - Roof Consultant · closes Dec 3, 2026
- REQUEST FOR LEASE PROPOSALS FOR OFFICE SPACE IN HORRY COUNTY FOR THE SOUTH CAROLINA DEPARTMENT OF HEALTH AND HUMAN… · closes Dec 4, 2026