CI-277 F17 Northwest Wing Abatement & Interior Demolition
CSU, Channel IslandsCamarillo, Ventura, California#0000040943
The project duration is 90 calendar days from the Notice to Proceed. A mandatory pre-bid walkthrough is required on November 20, 2026, at 10:00 AM.
On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Dec 8, 2026
- Time stated in bid documents
- Dec 8, 2026, 2:00 PM Pacific Time
- Bid bond
- 10%
- Performance bond
- 100%
- Payment bond
- 100%
- Submission
- mail, hand delivery
- Contract term
- 90 calendar days from the Notice to Proceed
- Documents analyzed
- 1
Scope of work
- Abate asbestos-containing pipe insulation in crawl spaces
- Remove nonstructural walls, ceilings, and MEP components
- Repair and verify fire barriers
- Contain and dispose of hazardous debris
- Demolish interior stair structure (optional alternate)
Steps to Bid
- 1
Obtain the bid package from the CSUCI OneDrive link: Official linkPro by Before bid submission
- 2
Attend the mandatory pre-bid walkthrough on November 20, 2026, at 10:00 AM at the gate entry to the Control Courtyard. Sign-in required. was Nov 20, 2026, 10:00 AM
This date has passed — confirm eligibility with the agency before bidding.
- 3
Submit all bid questions via the Q&A module on the CSUCI PlanetBids portal by November 30, 2026, at 2:00 PM. by Nov 30, 2026, 2:00 PM
- 4
Submit the bid in person or by mail to the Facilities Service Work Center, Ironwood Hall, Room 160, 1 University Drive, Camarillo, CA 93012. by Dec 8, 2026, 2:00 PM
What you'll need
Contract duration
90 calendar days from the Notice to Proceed
Submission
Mail, Hand delivery
NAICS
238290
How to submit
Sealed bid proposals must be submitted in person or by mail to the above address. No electronic submissions accepted. Bid must be received by 2:00 PM on December 8, 2026.
In person/mail: Facilities Service Work Center, Ironwood Hall, Room 160, 1 University Drive, Camarillo, CA 93012
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 5 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
Existing structural concrete, rainwater leaders/piping, and exterior building elements shall remain except where specifically noted in the contract documents. The remainder of Building F17 to the east is excluded. Independent abatement inspection and monitoring will be provided separately by the campus. Construction estimate: $330,000.00. 1: Demolition of the interior stair structure (risers, treads, railings, supports), priced separately at $20,000. Allowance No. 1: $25,000 for authorized unforeseen work, held outside the base bid. Contract term: 90 calendar days from the Notice to Proceed.
Key dates
- Pre-bid meeting
- Nov 20, 2026, 10:00 AM Pacific Time
- Site visit
- Nov 20, 2026, 10:00 AM Pacific Time
- Bids due
- Dec 8, 2026
Documents
- 20261113084631607_CI-277_Notice_to_Contractors_final.pdf3 pages
Similar open bids
- Districtwide Fire Break & Weed Abatement — Grossmont-Cuyamaca Community College District
- RFQ #2026-038-005 Brush Clearance, Weed and Refuse Abatement Services — Fire
- Demolition of Connex Box Structures and Removal of Debris — Alameda County
- STEM Courtyard at Chabot College — Chabot-Las Positas Community College District
- Municipal Yard Facility Condition Assessment — City of Garden Grove
Closing this week nearby
- 2027 Annual Pavement Rehabilitation Project – Professional Design Services RFP — closes Nov 20, 2026
- RFP – Country Club Drive Pavement Rehabilitation and Active Transportation Design Services — closes Nov 20, 2026
- 2026 Affordable Housing Notice of Funding Availability — closes Nov 20, 2026
- On-Call Armed Security Guard Services for the City of Santa Rosa Police Department — closes Nov 20, 2026
- Construction Manager at Risk for BMR Building at Middlefield Development — closes Nov 20, 2026