North River Gap Sidewalk Project
Sandy Springs, City OfGeorgia#PE-66098-NONST-2027-000000160
The City of Sandy Springs is soliciting bids for the T6026-1 North River Gap Sidewalk Project. The scope includes constructing approximately 300 LF of sidewalk, ADA ramps, and driveway reconstruction. The contract duration is 75 days from the Notice to Proceed. Bidders must be prequalified or registered with the Georgia Department of Transportation. Bonds are required if the bid price exceeds $100,000.00. Bids must be submitted online through the Bonfire Portal by January 7, 2027, at 2:00 PM EST.
On PublicBidSearch: the original bid posting, 3 bid documents and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Jan 7, 2027
- Time stated in bid documents
- Jan 7, 2027, 2:00 PM Eastern Time
- Bid bond
- Bonds will be required for this project if proposal is over $100,000.00.
- Performance bond
- 100%
- Payment bond
- 100%
- Submission
- electronic portal
- Contract term
- 75 Days from issuance of the NTP (Notice To Proceed)
- Documents analyzed
- 3 published · 2 analyzed
Scope of work
- Reconstruct two driveways.
- Work on the east side of North River Drive.
Steps to Bid
- 1
Submit questions or requests for clarification via Bonfire under Message Vendor Discussions. by Dec 9, 2026, 5:00 PM
Questions are due no later than December 9, 2026, 5:00 p.m. Questions received after this date and time may not be answered.
- 2
Attend the non-mandatory pre-bid conference. by Dec 1, 2026, 2:00 PM
Time: December 1, 2026, 2:00 PM Eastern Time (US and Canada) VIA MICROSOFT TEAMS WEBINAR
- 3
Submit bids online through the Bonfire Portal. by Jan 7, 2027, 2:00 PM
Any proposal submitted in any other format (email, paper, fax, mail, etc.) will not be accepted for any reason.
What you'll need
Bid security
RequiredBonds will be required for this project if proposal is over $100,000.00.
Contract duration
75 Days from issuance of the NTP (Notice To Proceed)
Award method
The City of Sandy Springs reserves the right to reject all bids and to waive technicalities and informalities, and to make award in the best interest of the City of Sandy Springs.
Submission
Electronic portal
NAICS
91347, 91382, 51585
How to submit
Bids shall only be accepted online through the Bonfire Portal at: Official linkPro. Any proposal submitted in any other format (email, paper, fax, mail, etc.) will not be accepted for any reason.
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 7 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
The project involves constructing approximately 300 lineal feet of sidewalk on the east side of North River Drive, from existing sidewalk at 100 North River Drive to existing sidewalk at 501 North River Parkway. This includes ADA ramps at driveways, reconstruction of two driveways, and other associated improvements. The project is funded through the Sandy Springs Capital Sidewalk Program. The contract term is 75 days from the issuance of the Notice to Proceed (NTP). All work shall be performed in accordance with GDOT Standard Specifications, current edition, and applicable Special Provisions. The project will be constructed under City of Sandy Springs Public Works Permit No. City-26-27, and the Contractor is responsible for obtaining all other required permits.
Key dates
- Questions due
- Dec 9, 2026, 5:00 PM Eastern Time
- Pre-bid meeting
- Dec 1, 2026, 2:00 PM Eastern Time
- Bids due
- Jan 7, 2027
Documents
- 202611_supportingdocs_PE-66098-NONST-2027-000000160-2026-11-19_17_34_17-28c0.pdf76 pages
- 202611_supportingdocs_PE-66098-NONST-2027-000000160-2026-11-19_17_34_32-dc25.pdf7 pages
- 202611_supportingdocs_PE-66098-NONST-2027-000000160-2026-11-19_17_34_52-5b2e.pdf
More from this agency
- Trenchless Stormwater Pipe Rehabilitation Project - 2027 — closes Nov 30, 2026
- Stormwater Repair, Maintenance, and Inspection Services — closes Dec 15, 2026
- Roadway Asset Inventory and Pavement Condition Assessment Services — closes Dec 18, 2026
- Abernathy Greenway Southside Improvements (Re-bid) — closes Jan 5, 2027
Similar open bids
- North Green Street Sidewalk Improvements, City of Swainsboro, Georgia — Swainsboro, City Of
- PCC Slab Replacement on SR 421/I-516 Exit 5 NB Off-Ramp, Chatham County, Georgia — Georgia Department of Transportation
- General Contractor/Builder for the Housing Attainability Program — Gainesville, City Of
- Carver Lake Park – Phase 1 — Columbus Consolidated Government
- RFB 2027 - 06 - Streetscapes VI - Towne Lake Parkway - Mill Street to Main Street - Phase II — Woodstock, City Of
Closing this week nearby
- Differential Gear U, NSN 2520150266567, Quantity 4 — closes Nov 20, 2026
- Power Supply Procurement - NSN 6120016274887 — closes Nov 20, 2026
- Resurface & Maintenance of SR 216 from SR 45 to SR 37 — closes Nov 20, 2026
- ADDENDUM NO. 1 – EXTENSION OF PROPOSAL DEADLINE — RFP 2026-03: Playground Equipment, Safety Surfacing, Delivery and… — closes Nov 20, 2026
- Playground Equipment, Safety Surfacing, Delivery and Installation — RFP No. 2026-03 — closes Nov 20, 2026