CMAR Installation of Storm Water Pump Systems Phase II
Macon-Bibb CountyMacon, Georgia#27-019-LH
Macon-Bibb County is seeking Construction Manager at Risk (CMAR) Services for the Installation of Storm Water Pump System Phase II at the Walker Road Landfill. Questions are due by 3:00 PM on November 27, 2026. A bid bond of 5% of the total base bid is required. Upon award, a 100% Payment Bond and 100% Performance Bond will be required. Insurance requirements include Worker's Compensation, General Liability ($1,000,000 CSL), and Automobile Liability ($1,000,000 CSL). The project involves replacing existing diesel pumps with an electric-driven system and has a 30-day completion timeline after Notice to Proceed. The CMAR will collaborate on design, provide estimates, and manage construction.
On PublicBidSearch: the original bid posting, 3 bid documents and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Dec 17, 2026
- Bid bond
- 5%
- Performance bond
- 10000%
- Payment bond
- 10000%
- Submission
- hand delivery, mail
- Contract term
- one year(s)
- Documents analyzed
- 3
Scope of work
- Install new electric-driven stormwater pump system at Walker Road Landfill.
- Replace existing diesel-driven pumps with permanent power routing.
- Provide preconstruction collaboration, procurement, and construction services.
- Develop master schedule, cost estimates, and constructability reviews.
- Manage subcontracts, purchase orders, and site safety.
- Decommission and remove existing diesel pumps upon successful startup.
Steps to Bid
- 1
Submit questions by email to [email available with Pro]. was Nov 27, 2026, 3:00 PM
This date has passed — confirm eligibility with the agency before bidding.
standard eastern time
What you'll need
Contract duration
30 calendar days following the Notice to Proceed
Submission
Hand delivery, Mail
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 8 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
Macon-Bibb County Board of Commissioners will receive sealed requests for proposals for Construction Manager at Risk (CMAR) Services for Installation of Storm Water Pump System Phase II for the Walker Road Landfill located in Macon, Bibb County, Georgia. The deadline to submit questions is Friday, November 27, 2026, by 3:00 pm standard eastern time, via email to [email available with Pro]. Bid documents can be obtained from the Georgia Procurement Registry website ([link available with Pro]) or the Macon-Bibb County Procurement Page ([link available with Pro]). An onsite visit can be scheduled by contacting Chris Hofstadter at [email available with Pro]. Bids must be accompanied by a bid bond of not less than five percent (5%) of the total base bid. The contract, if awarded, will be based on technical and cost proposal scores. A Payment Bond and a Performance Bond, both in the amount of one hundred percent (100%) of the contract price, will be required. Insurance coverage shall be carried with an insurance company licensed to do business in the State of Georgia, with Macon-Bibb County named as additional insured. Required coverage includes Worker’s Compensation (Statutory), General Liability ($1,000,000.00 combined single limit), and Automobile Liability ($1,000,000.00 combined single limit). The project requires a Godwin Dri-Prime® Model CD150M six-inch centrifugal single-stage end suction pump set or approved equal. The Contractor shall guarantee all labor and workmanship for a minimum of one year from the date of completion.
Key dates
- Questions due
- Nov 27, 2026, 3:00 PM Eastern Time
- Bids due
- Dec 17, 2026
Documents
- 27-019-LH-Construction-Manager-at-Risk-RFP.pdf14 pages
- 27-019-LH-Attachment-A.pdf11 pages
- 27-019-LH-Attachment-B-MBC-WRLF-Stormwater-Pump-REQUEST-FOR-PROPOSALS.pdf8 pages
Similar bids in Georgia
- Library Learning Commons FF&E (Annual Contact) · closes Dec 11, 2026
- Modifications and Renovations to the Whitfield County College and Career Academy · closes Jan 5, 2027
- REQUEST FOR QUALIFIATIONS AND ADAPTIVE REUSE SOLICITATION FOR THE HISTORIC COMMUNITY HOUSE · closes Jan 11, 2027
- Construction of Water System Improvements for FY 25 CDBG - Still Waters Engineering Project No. P1601.001 · closes Jan 5, 2027
- GDOT Maintenance Barns, Franklin County · closes Dec 22, 2026
Closing soon in Georgia
- Snapfinger Woods Sidewalk Construction with Pedestrian Hybrid Beacon (12 Months) · closes Dec 1, 2026
- Request for Proposals for Aging-Related Services for the CSRA · closes Dec 1, 2026
- Alderman Lane and Parking Improvements · closes Dec 2, 2026
- Asphalt Patching on Multiple County Roads · closes Dec 2, 2026
- Evans High School Turf Request TC-12-03-26A · closes Dec 3, 2026