Route H Coldmill, Resurface, and ADA Improvements from St. Louis County Line to Halls Street
Missouri Department of Transportation — MoDOTMissouri#261218-F04
This project on Route H in St. Louis City County involves cold milling, resurfacing, and ADA improvements over 3.879 miles. Bids are due electronically via Bid Express by December 18, 2026, at 11:00 a.m. local time. Key work includes asphalt paving, pavement repair, traffic control, and signal/lighting system upgrades. The contract period is from March 1, 2027, to October 15, 2027. Liquidated damages apply for late completion. Prevailing wage rates are required. A Bid Guaranty is required, and specific MoDOT bid bond forms must be used if submitting a paper bond.
On PublicBidSearch: the original bid posting, 4 bid documents and the agency contact (name and phone) for this bid.
Contact
Agency contact for this bidName and phone — included with ProProOverview
- Due
- Dec 18, 2026, 11:00 AM CT
- Bid bond
- Required
- Submission
- electronic portal
- Contract term
- March 1, 2027 to October 15, 2027
- Documents analyzed
- 4 published · 2 analyzed
Scope of work
- Coldmill, resurface, and perform ADA improvements on Route H for 3.879 miles.
- Install new and relocate existing city lighting poles and luminaires.
- Install and program traffic signal controllers, pedestrian pushbuttons, and associated equipment.
- Provide temporary traffic control and maintain work zones.
- Perform roadway repairs including pavement repair, subgrade compaction, and aggregate base placement.
Steps to Bid
- 1
Submit bids electronically through Bid Express.
- 2
Submit Bid Guaranty meeting requirements of Sec 102 of Missouri Standard Specifications for Highway Construction.
- 3
Submit Subcontractor Disclosure Form (if applicable).
What you'll need
Bid security
RequiredBid bonds are required. MoDOT provided bid bond forms must be used if submitting a paper bond. Annual bid bonds shall be executed by June 15th of each year.
Contract duration
October 15, 2027
Submission
Electronic portal
NAICS
237310
How to submit
All bids shall be submitted electronically using "Bid Express Secure Internet Bidding" at Official linkPro. Any paper bid submitted will be considered irregular per section 102.8 of the Missouri Standard Specifications for Highway Construction.
In person/mail: Missouri Highways and Transportation Commission, Attention: State Design Engineer/Bid Bond, P.O. Box 270, Jefferson City, MO 65102
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 10 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
Job JSL0065: Route H, St. Louis City County. The contract ID is 261218-F04, with Federal Project Number FAS S503(87). The project includes roadway items such as asphaltic concrete mixture, tack coat, concrete base, subgrade compaction, aggregate base, full depth pavement repair, changeable message signs, temporary traffic control, mobilization, pavement marking paint and preformed thermoplastic markings, cold milling of bituminous pavement, and bituminous shoulder rumble strips. It also includes lighting items for the installation and relocation of city lighting poles, and signal items for signal heads, posts, controller assembly housing, conduit, cable, pull boxes, concrete base, traffic signal maintenance and programming, accessible pedestrian pushbuttons and signing, ATC traffic signal controllers, intersection warning flashers, and ITS items for communication equipment installation or relocation. Liquidated damages are specified for failure to complete the work on time, including separate amounts for road user costs ($2,300 per calendar day) and contract administrative costs ($1,500 per calendar day). Prevailing wage rates determined by the Missouri Department of Labor and Industrial Relations and the United States Department of Labor apply.
Key dates
- Bids due
- Dec 18, 2026, 11:00 AM CT
Documents
- 261218_F04_JSL0065_BID_BOOK.pdf15 pages
- 261218_F04_JSL0065_JSP_Roadway.pdf82 pages
- 261218_F04_JSL0065_PLANS.pdf47 pages
- 261218_Notice_To_Contractors.pdf8 pages
More from this agency
- Supplemental Workforce for STIP Projects — Construction and Materials Division, District CO — closes Nov 18, 2026
- MoDOT KC District - Half Ton Crew Cab Long Bed Pickups Price Quote Request — closes Nov 19, 2026
- Commercial Rotary Cutters for Missouri Highways and Transportation — closes Nov 19, 2026
- Culvert Replacement and ADA Improvements over Muddy Creek in Harrisonville, Route 2, Cass County — closes Nov 20, 2026
- ADA Improvements and Pavement Replacement on Route 96 in Jasper County — closes Nov 20, 2026
Similar open bids
- Coldmill and Resurface Route I-49 in McDonald County — Missouri Department of Transportation
- Coldmill and Resurface Route 67 in Butler and Wayne Counties — Missouri Department of Transportation
- Intersection Pavement Replacement at Route M and County Road 459 — Missouri Department of Transportation
- 2027 Subdivision Pavement Surface Preservation — Jefferson County
- Seal Coat from Route 6 North Junction at Edina to Route 168 in Shelbyville, Knox and Shelby Counties, Missouri — Missouri Department of Transportation
Closing this week nearby
- Alton R-Iv School District: E-Rate FY2027 Category 2 - Switches and Necessary Software and Licenses; Switches — closes Nov 18, 2026
- Guard Wheel Power Truck Shade Window Right Side (Core Return) — OEM Only, Per Bi-State Specifications — closes Nov 19, 2026
- ISD Santa Fe Trails Elementary School Roof Improvements — closes Nov 19, 2026
- New Ballas Sidewalk Project – Phase 3 — closes Nov 19, 2026