Seal Coat from Route 6 North Junction at Edina to Route 168 in Shelbyville, Knox and Shelby Counties, Missouri
Missouri Department of Transportation — MoDOTMissouri#261218-B02
The Missouri Department of Transportation (MoDOT) is soliciting bids for a 31.9-mile seal coat project on Route 15 in Knox and Shelby Counties, from Route 6 north junction at Edina to Route 168 in Shelbyville. The work includes emulsified asphalt seal coat, aggregate, pavement marking, temporary traffic control, mobilization, and a changeable message sign. The project must be completed by October 1, 2027, with liquidated damages of $1,800/day for road user costs and $750/day for administrative costs. Bids must be submitted electronically via Bid Express by 11:00 a.m. Central Time on December 18, 2026. The contractor must also submit a Quality Control Plan and designate a Water Pollution Control Manager. The project is subject to federal and state environmental regulations, including stormwater compliance and FAA airspace review.
On PublicBidSearch: the original bid posting, 4 bid documents and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Dec 18, 2026, 11:00 AM CT
- Bid bond
- 100%
- Performance bond
- 100%
- Payment bond
- 100%
- Submission
- electronic portal
- Contract term
- 41 calendar days from the Notice to Proceed
- Documents analyzed
- 4 published · 2 analyzed
Scope of work
- Apply emulsified asphalt (147,296 gallons)
- Apply Grade A2 seal coat aggregate (526,056 square yards)
- Install 4-inch white and yellow pavement marking paint
- Install changeable message sign (contractor furnished)
Steps to Bid
- 1
Ensure all folders are properly named and validated using the 'Check' function in Bid Express before submission.
What you'll need
Submission
Electronic portal
NAICS
237130, 237199
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 4 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
The contractor must comply with Missouri Standard Specifications for Highway Construction, including prevailing wage requirements, environmental compliance (Stormwater Pollution Prevention Plan), and federal Buy America requirements. The contractor must submit a Quality Control Plan, designate a Water Pollution Control Manager, and provide a subcontractor disclosure form if subcontractor values exceed $2 million or 20% of the total bid.
Key dates
- Questions due
- Dec 18, 2026, 11:00 AM Central Time
- Bids due
- Dec 18, 2026, 11:00 AM CT
Documents
- 261218_B02_JNE0101_BID_BOOK.pdf13 pages
- 261218_B02_JNE0101_JSP_Roadway.pdf35 pages
- 261218_B02_JNE0101_PLANS.pdf9 pages
- 261218_Notice_To_Contractors.pdf8 pages
More from this agency
- Supplemental Workforce for STIP Projects — Construction and Materials Division, District CO — closes Nov 18, 2026
- MoDOT KC District - Half Ton Crew Cab Long Bed Pickups Price Quote Request — closes Nov 19, 2026
- Commercial Rotary Cutters for Missouri Highways and Transportation — closes Nov 19, 2026
- Culvert Replacement and ADA Improvements over Muddy Creek in Harrisonville, Route 2, Cass County — closes Nov 20, 2026
- ADA Improvements and Pavement Replacement on Route 96 in Jasper County — closes Nov 20, 2026
Similar open bids
- Coldmill and Resurface Route I-49 in McDonald County — Missouri Department of Transportation
- Coldmill and Resurface Route 67 in Butler and Wayne Counties — Missouri Department of Transportation
- Intersection Pavement Replacement at Route M and County Road 459 — Missouri Department of Transportation
- 2027 Subdivision Pavement Surface Preservation — Jefferson County
- Route H Coldmill, Resurface, and ADA Improvements from St. Louis County Line to Halls Street — Missouri Department of Transportation
Closing this week nearby
- Alton R-Iv School District: E-Rate FY2027 Category 2 - Switches and Necessary Software and Licenses; Switches — closes Nov 18, 2026
- Guard Wheel Power Truck Shade Window Right Side (Core Return) — OEM Only, Per Bi-State Specifications — closes Nov 19, 2026
- ISD Santa Fe Trails Elementary School Roof Improvements — closes Nov 19, 2026
- New Ballas Sidewalk Project – Phase 3 — closes Nov 19, 2026