OpenRFPCloses Dec 17, 2026

Contract Maintenance of Water Storage Tanks RFP

Baldwin County Board Of CommissionersGeorgia#PE-60500-NONST-2027-000000039

Proposals must be submitted via email as a single searchable PDF by December 17, 2026, at 5:00 pm. Questions must be submitted by December 10, 2026, at 5:00 pm. A physical service center within 75 miles of Baldwin County is required. A performance bond and payment bond are required. A mandatory pre-bid meeting is scheduled for January 5, 2027, at 10:00 am. The contract term is five years, with an expected start date of January 1, 2027.

On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (name, email and phone) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName, email and phone — included with ProPro

Overview

Due
Dec 17, 2026
Time stated in bid documents
Dec 17, 2026, 5:00 PM Eastern Time
Bid bond
100%
Performance bond
100%
Payment bond
100%
Submission
email
Contract term
Five (5) years
Documents analyzed
1

Scope of work

  • Conduct annual exterior and interior inspections with photographs and condition ratings
  • Perform routine preventive maintenance of coatings, ladders, platforms, handrails, hatches, vents, screens, overflow piping, roof appurtenances, safety systems,
  • Perform corrosion control, sealant work, leak repairs, welding, structural repairs, and replacement of worn or damaged appurtenances
  • Perform routine tank cleaning and washout services, sediment removal, affected surface disinfection, and support return to service
  • Provide emergency services for leaks, storm damage, contamination concerns, vandalism, and other conditions threatening service or public safety
  • Develop a detailed annual maintenance and inspection schedule

Steps to Bid

  1. 1

    Confirm the firm has a physical service center within 75 miles of the Baldwin County boundary-line and that the service center's name and address are included in the firm profile.

  2. 2

    Submit the proposal via email to [email available with Pro] by December 17, 2026, at 5:00 pm. Late submissions will be rejected. by Dec 17, 2026, 5:00 PM

  3. 3

    Submit all questions in writing by December 10, 2026, at 5:00 pm to Matt Smith, PE, at [email available with Pro]. by Dec 10, 2026, 5:00 PM

  4. 4

    Attend the mandatory pre-bid meeting on January 5, 2027, at 10:00 am. by Jan 5, 2027, 10:00 AM

What you'll need

Contract duration

5 years from January 1, 2027

Submission

Email

NAICS

238290, 238299

How to submit

Submit one searchable PDF titled 'Proposal – Contract Maintenance of Water Storage Tank – [Firm Name]' via email to [email available with Pro]. The proposal must be received no later than Thursday, December 17, 2026, at 5:00 pm. Late submissions will be rejected. Respondents are responsible for confirming successful delivery.

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 5 watch-outs that disqualify bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

The Owner may issue task authorizations or work orders during the contract term. No work beyond included recurring services or approved allowances shall begin without written authorization. The contractor shall promptly report conditions requiring immediate action and provide supporting scope, schedule, and pricing. Questions must be submitted in writing by Thursday, December 10, 2026, at 5:00 pm to Matt Smith, PE, at [email available with Pro]. The Owner may request demonstrations or clarifications, verify references, and negotiate with the highest-ranked respondent. The Owner may award all or part of the work, establish allowances or not-to-exceed amounts, or reject all proposals. The five-year contract will require the contractor to maintain a single point of contact, submit scheduled inspection and maintenance reports, respond within contract service levels, obtain written authorization for extra work, provide itemized invoices, warrant completed work, and remain responsible for subcontractors. Performance deficiencies may require corrective action and may result in termination for cause or other remedies stated in the contract. The Owner may reject any or all proposals, waive informalities, cancel or revise this RFP, request additional information, or modify the schedule. All costs of preparing and submitting a proposal are the respondent’s responsibility. Submitted materials become the Owner’s property and may be subject to the Georgia Open Records Act. The Owner is not bound until a written agreement is approved and executed by authorized representatives. Award under this RFP does not guarantee any minimum amount of work beyond obligations expressly stated in the final contract. Proposers shall identify proposed subcontractors and remain fully responsible for their work. The 12

Key dates

Questions due
Dec 10, 2026, 5:00 PM Eastern Time
Pre-bid meeting
Jan 5, 2027, 10:00 AM Eastern Time
Bids due
Dec 17, 2026

Documents

  • 202611_supportingdocs_PE-60500-NONST-2027-000000039-2026-11-24_09_02_11-abe5.pdf13 pages

See all documents · Download with Pro

Similar bids in Georgia

Closing soon in Georgia