CR 458 Road Improvements (From the Williamson County / Travis County Line to SH 95)
Williamson County - C2460Texas#26IFB89
Williamson County, Texas is soliciting sealed bids for the reconstruction of CR 458 from the Williamson County/Travis County line to SH 95, including road widening, culvert and bridge culvert drainage, grading, paving, signage, and pavement marking. Bids must be submitted by December 17, 2026, at 10:00 AM CST, at the Williamson County Purchasing Office in Georgetown. A non-mandatory pre-solicitation conference is scheduled for December 2, 2026, at 10:00 AM CST. Bids will be opened publicly in the Purchasing Office.
On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Dec 17, 2026, 10:00 AM CT
- Time stated in bid documents
- Dec 17, 2026, 10:00 AM Central Time
- Submission
- mail, hand delivery
- Contract term
- 3 years + Two additional one-year renewal terms
- Documents analyzed
- 1
- Required submission items
- 4 items · full checklist with Pro
Scope of work
- Improve culvert and bridge culvert drainage systems
- Install new signage and pavement markings
Steps to Bid
- 1
Register as a vendor on the Williamson County Euna (Bonfire) portal at Official linkPro
- 2
Review the full solicitation documents, including specifications, drawings, and bid form, via the Euna portal or by visiting the Williamson County Purchasing website.
- 3
Attend the non-mandatory pre-solicitation conference on December 2, 2026, at 10:00 AM CST at the Williamson County Administration Building, 1848 Texas Trail, Georgetown, TX 78626. by Dec 2, 2026, 10:00 AM
- 4
Ensure the bid is received by the Purchasing Office on or before December 17, 2026, at 10:00 AM CST. Late submissions will not be accepted. by Dec 17, 2026, 10:00 AM
What you'll need
Submission
Mail, Hand delivery
NAICS
913271 - Road and, 913272 - Street and, 913273 - Bridge and, 913275 - Paving and, 913278 - Pavement, 913279 - Marking
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 3 watch-outs that disqualify bidders
- The 4-item required-submittals checklist
Cancel anytime · no card to browse
Project details
The project spans from the Williamson County / Travis County line to State Highway 95. A non-mandatory pre-solicitation conference will be held on December 2, 2026, at 10:00 AM CST at the Williamson County Administration Building, same address. Solicitation documents are available via the Williamson County Euna (Bonfire) portal at [link available with Pro].
Key dates
- Pre-bid meeting
- Dec 2, 2026, 10:00 AM Central Time
- Bids due
- Dec 17, 2026, 10:00 AM CT
Documents
- ESBD_573396_1793816829080_26IFB89 - Wilco Sun Advertisement.pdf2 pages
More from this agency
- Historic Courthouse Elevator Refurbishment · closes Dec 8, 2026
- West Main Street (From CR 226 / City Limit Line to South Patterson Avenue) · closes Dec 17, 2026
- Juvenile Justice Center Addition - Furniture Package · closes Jan 7, 2027
Similar bids in Texas
- Frontier Phase 5A - Paving Improvements · closes Dec 2, 2026
- ITB - Oil, Asphalt & Emulsion · closes Dec 3, 2026
- Hot Mix Asphalt and Asphalt Binder Certification and Training Services · closes Dec 23, 2026
- Local Let Maintenance Contract for Limestone Rock Asphalt on IH0035, La Salle County · closes Dec 10, 2026
- Skid Restoration (Non-Rehab) on FM1093, Harris County, Texas · closes Dec 8, 2026
Closing soon in Texas
- Roadway Widening to a Super 2 on State Highway 115, Winkler County, Texas · closes Dec 1, 2026
- Life Safety Cellular Systems · closes Dec 1, 2026
- Economic Analysis/Valuation of Edwards Aquifer Water Rights for Forbearance · closes Dec 2, 2026
- Request for Information for Request for Qualifications: Title II Architect Engineering Services for Design-Build… · closes Dec 3, 2026
- Phase Three Detention Basin Excavation, Spoil Placement, and Outfall to Serve Ellwood Phase Three · closes Dec 3, 2026