Construction of County Road 466A from East of Timbertop Lane to East of Poinsettia Avenue
Lake County Board of County Commissioners — Procurement ServicesTavares, Florida#26-710
Lake County is soliciting sealed bids for the construction of County Road 466A from east of Timbertop Lane to east of Poinsettia Avenue, a 1.185-mile stretch. The project involves upgrading the roadway from two-lane undivided to four-lane divided with median, sidewalks, curbs, gutters, retaining walls, fencing, signing, and pavement marking. A traffic signal will be installed at the intersection with Village Park Drive, including full signal system components, power, and pedestrian features. Drainage, utility coordination, and ADA-compliant pedestrian facilities are included. The project is within existing right of way. A non-mandatory pre-bid conference is scheduled for November 12, 2026. A 5% bid guarantee is required. The County reserves the right to reject any or all bids.
On PublicBidSearch: the original bid posting, 8 bid documents and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Dec 17, 2026
- Bid bond
- 5%
- Submission
- electronic portal
- Documents analyzed
- 8 published · 2 analyzed
Scope of work
- Upgrade County Road 466A from 2-lane to 4-lane divided roadway over 1.185 miles
- Install 30-ft and 22-ft raised medians, 12-ft and 11-ft travel lanes, 4-ft paved shoulders, and 5-ft sidewalks
- Provide drainage improvements including inlets, culverts, and manholes
- Ensure all pedestrian facilities comply with ADA standards
Steps to Bid
- 1
Review the full bid package, including plans, specifications, and bid forms, via the official procurement portal at Official linkPro.
- 2
Attend the non-mandatory pre-bid conference on November 12, 2026, at 9:00 a.m. at Lake County Public Works, 350 North Sinclair Avenue, Tavares, FL, to ask questions and review project details. was Nov 12, 2026, 9:00 AM
This date has passed — confirm eligibility with the agency before bidding.
- 3
Ensure the bid is accompanied by a bid guarantee in the form of a bid bond or letter of credit for 5% of the base bid amount, payable to Lake County, and acceptable to the County Attorney.
What you'll need
Submission
Electronic portal
NAICS
237130
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 3 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
Construction of County Road 466A from approximately 150 feet east of Timbertop Lane to approximately 350 feet east of Poinsettia Avenue, a 1.185-mile segment. Scope includes upgrading from a two-lane undivided roadway to a 4-lane divided roadway with four 12-foot travel lanes (first 250 feet west of Lake Josephine Drive) and four 11-foot travel lanes (remainder), 4-foot paved shoulders, 5-foot sidewalks on both sides, and a 30-foot raised median (first section) or 22-foot raised median (second section). Work includes installation of sidewalks, driveways, concrete traffic separators, curb and gutter, case-in-place retaining walls, fencing, signing, pavement marking, and a traffic signal at County Road 466A and Village Park Drive. Signal work includes mast arms, open trench and directional bore conduit, signal and fiber optic cable, controller/cabinet, pull boxes, power service, signal priority and pre-emption system, pedestrian signals, poles, vehicular traffic signals, vehicle detection, pedestrian detectors, ethernet switch, uninterruptible power supply, and remote power management unit. Overhead illuminated street signs and luminaries will be installed. Drainage improvements include inlets, end walls, pipe culverts, mitered end sections, and manholes. Additional work includes mobilization, traffic maintenance, clearing and grubbing, excavation, embankment, stabilization, and sodding. An Environmental Resource Permit (ERP) has been obtained from the St. Johns River Water Management District. Right of way acquisition is complete. Work will be performed within existing right of way or easements. Plans, specifications, and bid forms are available via the County’s procurement portal.
Key dates
- Pre-bid meeting
- Nov 12, 2026, 9:00 AM Eastern Time
- Bids due
- Dec 17, 2026
Documents
- 26-710_26-710BidAnnouncement.pdf2 pages
- 26-710_26-710BidDocument.pdf
- 26-710_26-710RoadwayPlansPhase3B.pdf
- 26-710_26-710SIGNALIZATIONPLANSSS.pdf
- 26-710_26-710Pre-BidAttendance.pdf2 pages
- 26-710_26-710CR466ARoadwayFinal09.03.26posted11.19.26.pdf
- 26-710_26-710UWSFiles_OtherDocuments.docx
- 26-710_No.1Addendumto26-710posted11.25.26.pdf13 pages
More from this agency
- Playground Equipment and Swing Set Refurbishment at Paisley Park · closes Dec 3, 2026
- Fee Structure Review · closes Dec 10, 2026
- Hartwood Marsh Road Widening and Reconstruction · closes Dec 10, 2026
- CR 466A Fruitland Park Utility Project · closes Dec 17, 2026
- Inmate Catastrophic Insurance · closes Jan 5, 2027
Similar bids near Tavares
- 2027 Overlay Projects – S. Highland St., Cherokee Ave., S. Westwood St./Dale Swain St., Etheredge St., S. Broad St.,… · Bushnell · closes Dec 11, 2026
- Beresford Avenue Extension Phase 2B: S. Kepler Road/Dr. MLK Beltway to State Road 44 · DeLand · closes Dec 1, 2026
- Exterior Painting of Two Concrete Ground Storage Tanks · Orange City · closes Dec 3, 2026
- Redevelopment of City-Owned Real Property on Silver Star Road for Residential Development · Orlando · closes Dec 22, 2026
- Tomoka Landfill Roadway Improvement and Scale Addition · DeLand · closes Jan 7, 2027
Closing soon near Tavares
- Sole Source Designation of Bound Tree Medical for Curaplex OneScope Pro Video Laryngoscope Cameras and accessories · The Villages · closes Nov 30, 2026
- Real Estate Brokerage and Property Management Services · Groveland · closes Dec 1, 2026
- Sumter County Employee Benefits Brokerage Services · Bushnell · closes Dec 2, 2026
- Demolition of Structure and Debris Cleanup and Disposal · Sanford · closes Dec 3, 2026
- CRA Master Plan Update for the City of Apopka · Apopka · closes Dec 3, 2026