OpenIFBCloses Jan 7, 2027

Davis Slough Maintenance Station Building Roof Replacements

Department of Transportation — 7304610 - FacilitiesOregon#S-73000-00018265

The Oregon Department of Transportation is soliciting bids for the Davis Slough Maintenance Station Building Roof Replacements project. This project involves the removal and replacement of metal roofs, insulation, and gutters on three buildings: Storage Building #04, Maintenance Building #01, and Electrical Storage Building #03. The work includes demolition, installation of vapor barriers and insulation, new metal roofing panels, and gutters. Bids must be submitted electronically through the OregonBuys system. A mandatory pre-bid conference will be held on December 8, 2026, at 11:00 AM PST at the ODOT Davis Slough Maintenance Facility. Prevailing wage rates apply. A bid bond of 10% of the total bid amount is required. Performance and payment bonds, each in the total amount (100%) of the awarded contract, will be required after award.

On PublicBidSearch: the original bid posting, 5 bid documents and the agency contact (phone) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidPhone — included with ProPro

Overview

Due
Jan 7, 2027
Time stated in bid documents
Jan 7, 2027, 2:00 PM Pacific Time
Bid bond
10%
Performance bond
100%
Payment bond
100%
Submission
electronic portal
Documents analyzed
5

Scope of work

  • Install roof vapor barrier and fiberglass blanket insulation as applicable.
  • Install new metal roofing panels and accessories.
  • Replace gutters and downspouts around Maintenance Building #01.

Steps to Bid

  1. 1

    Register in OregonBuys if not already registered.

    Registration is free. Visit [link available with Pro] for assistance.

  2. 2

    Obtain ITB Documents from OregonBuys.

    Documents are available for download at [link available with Pro].

  3. 3

    Attend the Mandatory Pre-Bid Conference. by Dec 8, 2026, 11:00 AM

    Location: ODOT Davis Slough Maintenance Facility 61036 HWY 101 S, Coos Bay 97240. Bidders must be on time and attend the entire conference or send an authorized representative. Bids from non-compliant bidders will be rejected.

  4. 4

    Submit questions, requests for clarification, or requests for approval of equivalents. by Dec 31, 2026

    7 calendar days prior to the Bid Opening Date. Submit via email to the Purchaser/SPC.

  5. 5

    Submit Bid Security. by Jan 7, 2027, 2:00 PM

    Amount equal to 10% of the total bid. Accepted forms include bid bond, certified/cashier's check, or irrevocable letter of credit. Bid bond must use the State Bid Bond Form (Attachment A, Form A-3).

  6. 6

    Submit Bid Package via OregonBuys. by Jan 7, 2027, 2:00 PM

    All electronic files must be clearly identified with the OregonBuys Bid Number and marked 'Confidential'. Failure to submit pricing information or select 'Yes' on the Terms & Conditions tab may result in rejection.

  7. 7

    Submit First-Tier Subcontractor Disclosure Form. by Jan 7, 2027, 4:00 PM

    Submit via OregonBuys with the Bid Package or via email to the Purchaser/SPC within 2 working hours after the Bid Opening Date.

What you'll need

Contract duration

Substantial Completion: April 30, 2027; Final Completion: May 14, 2027

Submission

Electronic portal

How to submit

Bids must be submitted through the OregonBuys system. Each electronic file or attachment must be clearly identified with the OregonBuys Bid Number. Bidder shall select the “Confidential” checkbox in OregonBuys when uploading any files required in response to this ITB. Bidder shall make reasonable efforts to minimize the file size of attachments to 5 megabytes. Bidder must select the “Yes” option on the Terms & Conditions tab in OregonBuys. If Bidder selects “Yes with exceptions” or “No,”, the Bid will be rejected as non-responsive.

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 8 watch-outs that disqualify bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

Each building has unique and separate requirements as shown on the plans. The bid must be one price that includes all three roofs. Contractor shall provide related accessories such as fasteners, ridge cap, and eave trim as required for a complete installation, matching metal roof panels in color and finish. Exterior finish coating to be panel manufacturer’s standard Kynar 500 Paint System. Panel back coating to be panel manufacturer’s standard polyester wash coat. Fasteners to be factory-coated steel fasteners with neoprene washer complying with corrosion-resistance provisions for fastening to roof deck. Underlayment as recommended by roofing manufacturer. Installation of 1" snaplock standing seam metal panels over new underlayment, and through-the-roof fastener style metal panels. Existing vehicle exhaust roof vent to be removed and re-ducted to southwest wall, with new weather protected wall cover installed. All transitions to be flashed weather tight. Contractor shall provide a 1-year installation warranty on all workmanship and all warranties for equipment applicable to this contract.

Key dates

Questions due
Dec 31, 2026
Pre-bid meeting
Dec 8, 2026, 11:00 AM Pacific Time · Mandatory
Bids due
Jan 7, 2027

Documents

  • 00018265_ITB.pdf31 pages
  • 00018625_Sample_PI_Contract.pdf35 pages
  • EXHIBIT_5_SPECIFICATIONS.docx
  • EXHIBIT_6_PLANS_1.pdf3 pages
  • ExhIbit_7_Additional_Project_Requirements.doc

See all documents · Download with Pro