The Etowah Water & Sewer Authority is seeking pre-qualified contractors for the expansion of the Dawson Forest Wastewater Reclamation Facility to 2.5 MGD. Contractors must submit a pre-qualification application by December 18, 2026, at 5:00 p.m. ET. Pre-qualified applicants will be notified by January 8, 2027.

On PublicBidSearch: the original bid posting, 2 bid documents and the agency contact (name, email and phone) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName, email and phone — included with ProPro

Overview

Due
Dec 18, 2026
Time stated in bid documents
Dec 18, 2026, 5:00 PM Eastern Time
Submission
email
Documents analyzed
2 published · 1 analyzed

Scope of work

  • Expand Dawson Forest WRF to 2.5 MGD capacity
  • Construct SBR Tanks No. 3 & 4 and Aerobic Digesters No. 3 & 4
  • Install mechanical bar screen at influent pump station
  • Upgrade existing SBR and aerobic digester tanks
  • Install additional disc filter and UV treatment equipment
  • Upgrade civil, electrical, and instrumentation systems

Steps to Bid

  1. 1

    Obtain pre-qualification application and requirements was Nov 11, 2026

    This date has passed — confirm eligibility with the agency before bidding.

    Available starting November 11, 2026, from the Etowah Water & Sewer Authority Engineering & Construction Department at 1162 Highway 53 East, Dawsonville, GA 30534, or via email from Tim Collins at [email available with Pro].

  2. 2

    Complete and submit pre-qualification application by Dec 18, 2026, 5:00 PM

    Submit the completed application in PDF format via email to Tim Collins at [email available with Pro] by 5:00 p.m. local time on December 18, 2026. Use the subject line: PRE-QUALIFICATION APPLICATION – DAWSON FOREST WRF. EXP. TO 2.5 MGD.

  3. 3

    Wait for pre-qualification status notification by Jan 8, 2027

    All applicants will be notified of their pre-qualification status by January 8, 2027.

  4. 4

    Receive design drawings and specifications

    Pre-qualified applicants will be notified of the release date for contract drawings and specifications.

What you'll need

Submission

Email

NAICS

237190, 237990, 238290, 238330

How to submit

Submit the completed pre-qualification application in PDF format via email to [email available with Pro]. Use the subject line: PRE-QUALIFICATION APPLICATION – DAWSON FOREST WRF. EXP. TO 2.5 MGD. Do not submit hard copies.

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 4 watch-outs that disqualify bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

Invitation for bidder pre-qualification for the expansion of the Dawson Forest Wastewater Reclamation Facility (WRF) to a capacity of 2.5 million gallons per day (MGD). The project includes installation of a mechanical bar screen at the influent pump station, upgrades to existing SBR and aerobic digester tanks, construction of two new SBR tanks and two new aerobic digesters, installation of post-EQ pump No. 3, additional disc filter and UV treatment equipment, and miscellaneous civil, electrical, and instrumentation improvements. The pre-qualification application must be submitted electronically in PDF format by 5:00 p.m. local time on Friday, December 18, 2026, to Tim Collins at [email available with Pro]. The subject line must read: PRE-QUALIFICATION APPLICATION – DAWSON FOREST WRF. EXP. Design drawings and specifications will be released to pre-qualified bidders at a later date.

Key dates

Bids due
Dec 18, 2026

Documents

  • 202611_supportingdocs_PE-33656-NONST-2027-000000002-2026-11-09_09_24_56-325e.pdf5 pages
  • 202611_supportingdocs_PE-33656-NONST-2027-000000002-2026-11-09_09_24_62-96f2.pdf2 pages

See all documents · Download with Pro

Similar open bids

Closing this week nearby