Pavement Reconstruction (Removal, Grading, Drainage, and Pavement) on I-59 Northbound from SR-68 Interchange to SR-35 Interchange
Alabama Department of Transportation — ALDOTCollinsville, Alabama#IM-I059(449)
This is a construction solicitation for pavement reconstruction on 13.996 miles of I-59 Northbound from SR-68 Interchange in Collinsville to SR-35 Interchange in Fort Payne, Alabama. Scope includes removal of existing pavement, drainage structures, and guardrail; excavation and borrow; installation of storm and roadway pipes; base and bituminous layers; concrete pavement replacement; traffic control; erosion control; and final pavement markings. A $5.00 bid proposal and $172.00 per set of plans are available for purchase. Questions must be submitted by November 20, 2026.
On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (name only) for this bid.
Contact
Agency contact for this bidName only — included with ProProOverview
- Due
- Dec 4, 2026, 4:00 AM CT
- Time stated in bid documents
- Dec 4, 2026, 4:00 AM Central Time
- Submission
- mail, hand delivery
- Documents analyzed
- 1
Scope of work
- Remove 194,886 sq yd of concrete pavement
- Install 135,999 LF of pavement edge drain
- Construct 13.996 miles of new asphalt and concrete pavement
- Install 1,500 sq yd of concrete pavement replacement
- Install 165 LF of 48” roadway pipe (Class 3 R.C.)
- Install 561 LF of silt fence and 2,288 sandbags for erosion control
Steps to Bid
- 1
Register with ALDOT and obtain a vendor ID if not already registered.
- 2
Purchase the bid proposal for $5.00 and the plans for $172.00 per set.
- 3
Submit questions to the agency by November 20, 2026. by Nov 20, 2026, 10:00 AM
- 4
Prepare and submit the bid package by December 4, 2026, at 4:00 AM Central Time. by Dec 4, 2026, 4:00 AM
What you'll need
Contract duration
13.996 miles
Submission
Mail, Hand delivery
NAICS
237130
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 1 watch-out that disqualifies bidders
Cancel anytime · no card to browse
Project details
Project length: 13.996 miles. Scope includes removal of existing pavement, concrete flumes, pipe, guardrail, headwalls, inlets, and impact attenuators; excavation and borrow material; installation of storm and roadway pipes (18”, 24”, 42”, 48” Class 3 R.C.); drainage structures; subbase and base course (crushed aggregate, permeable asphalt treated base, cement treated base); bituminous layers (tack coat, upper/lower binder, wearing surface); concrete pavement replacement; traffic control and temporary signage; erosion control (silt fence, hay bales, sandbags, geotextile); seeding, mowing, and sodding; and final pavement marking. The project is scheduled for completion on January 30, 2030.
Key dates
- Pre-bid meeting
- Nov 20, 2026, 10:00 AM Central Time
- Bids due
- Dec 4, 2026, 4:00 AM CT
Documents
- PITEMS010.pdf4 pages
More from this agency
- Construction Engineering and Inspection (CE&I) Services for I-10 Widening Project NH-I010(352), Baldwin County, Alabama — closes Nov 20, 2026
- Left and Right Turn Lane Installation (Grading, Drainage, Pavement, and Traffic Stripe) on SR-106 at 0.250 Mile East… — closes Dec 4, 2026
- Resurfacing and Traffic Stripe on CR-77 from CR-22 to SR-74 (US-278) Southeast of Addison, Winston County, Alabama — closes Dec 4, 2026
- Micro-Milling, Resurfacing, Guardrail Installation (Steel Blockout Replacement), and Traffic Stripe on SR-59 from CR… — closes Dec 4, 2026
- Roadway Improvements (Sign Replacement) on I-565 from I-65 Interchange to SR-2 (US-72) Interchange, Madison and… — closes Dec 4, 2026
Similar open bids
- Resurfacing of Main Street and Storm Drainage Improvements — City of Cullman, Alabama — CITY OF CULLMAN
- Basin 15 Drainage Improvements Projects — Alabama Public Notice — statewide
- Lillian Park Parking and Drainage Improvements Project, Baldwin County, AL — Alabama Public Notice — statewide
- Periodic Bid for Drainage Projects-2027 — City of Huntsville
- Periodic Bid for Drainage Projects-2027, Project No. 71-27-DR03 — City of Huntsville
Closing this week nearby
- Satellite Phones and FirstSatNet PTT Services — closes Nov 19, 2026
- REQ #270161 Lexmark Printer for Legal — closes Nov 19, 2026
- Professional Engineering Services for Airport Industrial Park Project — closes Nov 19, 2026
- Campus Recreation Center Roof Replacement — closes Nov 19, 2026
- 2026-14 BP #2 - Landscaping at Mobile International Airport — closes Nov 19, 2026