OpenConstructionCloses Dec 4, 2026, 4:00 AM CT

Pavement Reconstruction (Removal, Grading, Drainage, and Pavement) on I-59 Northbound from SR-68 Interchange to SR-35 Interchange

Alabama Department of Transportation — ALDOTCollinsville, Alabama#IM-I059(449)

This is a construction solicitation for pavement reconstruction on 13.996 miles of I-59 Northbound from SR-68 Interchange in Collinsville to SR-35 Interchange in Fort Payne, Alabama. Scope includes removal of existing pavement, drainage structures, and guardrail; excavation and borrow; installation of storm and roadway pipes; base and bituminous layers; concrete pavement replacement; traffic control; erosion control; and final pavement markings. A $5.00 bid proposal and $172.00 per set of plans are available for purchase. Questions must be submitted by November 20, 2026.

On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (name only) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName only — included with ProPro

Overview

Due
Dec 4, 2026, 4:00 AM CT
Time stated in bid documents
Dec 4, 2026, 4:00 AM Central Time
Submission
mail, hand delivery
Documents analyzed
1

Scope of work

  • Remove 194,886 sq yd of concrete pavement
  • Install 135,999 LF of pavement edge drain
  • Construct 13.996 miles of new asphalt and concrete pavement
  • Install 1,500 sq yd of concrete pavement replacement
  • Install 165 LF of 48” roadway pipe (Class 3 R.C.)
  • Install 561 LF of silt fence and 2,288 sandbags for erosion control

Steps to Bid

  1. 1

    Register with ALDOT and obtain a vendor ID if not already registered.

  2. 2

    Purchase the bid proposal for $5.00 and the plans for $172.00 per set.

  3. 3

    Submit questions to the agency by November 20, 2026. by Nov 20, 2026, 10:00 AM

  4. 4

    Prepare and submit the bid package by December 4, 2026, at 4:00 AM Central Time. by Dec 4, 2026, 4:00 AM

What you'll need

Contract duration

13.996 miles

Submission

Mail, Hand delivery

NAICS

237130

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 1 watch-out that disqualifies bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

Project length: 13.996 miles. Scope includes removal of existing pavement, concrete flumes, pipe, guardrail, headwalls, inlets, and impact attenuators; excavation and borrow material; installation of storm and roadway pipes (18”, 24”, 42”, 48” Class 3 R.C.); drainage structures; subbase and base course (crushed aggregate, permeable asphalt treated base, cement treated base); bituminous layers (tack coat, upper/lower binder, wearing surface); concrete pavement replacement; traffic control and temporary signage; erosion control (silt fence, hay bales, sandbags, geotextile); seeding, mowing, and sodding; and final pavement marking. The project is scheduled for completion on January 30, 2030.

Key dates

Pre-bid meeting
Nov 20, 2026, 10:00 AM Central Time
Bids due
Dec 4, 2026, 4:00 AM CT

Documents

  • PITEMS010.pdf4 pages

See all documents · Download with Pro

More from this agency

Similar open bids

Closing this week nearby