Design & Construct Addition to Pre-Trip Inspection Building, Troop A CDL, Lees Summit, MO
Missouri Office of Administration - Division of Facilities Management — Pre-Trip Inspection Building Troop A CDLLees Summit, Missouri#R2609-01
The addition will include office and breakroom space, a restroom, and a mechanical room, with a slab-on-grade foundation, metal stud walls, 4-inch CMU veneer, insulated walls and roof, aluminum storefront windows, and a standing seam metal roof. A separate slab-on-grade metal frame vestibule with a standing seam roof is also included. Electronic bids must be submitted to [email available with Pro] by 1:30 PM on December 17, 2026. A pre-bid meeting is mandatory and will be held at 10:00 AM on December 1, 2026, at 1950 NE Independence Avenue, Lees Summit, MO 64064.
On PublicBidSearch: the original bid posting, 4 bid documents and the agency contact (name and email) for this bid.
Contact
Agency contact for this bidName and email — included with ProProOverview
- Due
- Dec 17, 2026, 11:59 PM CT
- Submission
- Contract term
- 180 working days from the date of the Notice of Intent to Award
- Documents analyzed
- 4 published · 2 analyzed
- Required submission items
- 7 items · full checklist with Pro
Scope of work
- Renovate existing conditioned space in Pre-Trip Inspection Building, Troop A CDL
- Construct 1,097 sq ft addition for office and breakroom space
Steps to Bid
- 1
Register as a planholder by obtaining a bid set from American Document Solutions (ADS) at 1400 Forum Blvd., Suite 7A, Columbia, MO 65203, or view electronically at Official linkPro. A $100 deposit is required for paper sets; deposits are refundable if plans are returned within 15 working
- 2
Attend the mandatory pre-bid meeting on December 1, 2026, at 10:00 AM at 1950 NE Independence Avenue, Lees Summit, MO 64064. Access to the site requires a photo ID.
What you'll need
Insurance
RequiredThe Contractor shall pay not less than the specified hourly rate of wages, as set out in the wage order attached to and made part of the specifications for work under this contract, to all workers performing work under the contract, in accordance with sections 290.210 to 290.340, RSMo. The Contractor shall forfeit a penalty to the Owner of one hundred dollars per day (or portion of a day) for each worker that is paid less than the specified rates for any work done under the contract by the Contractor or by any subcontractor, in accordance with section 290.250, RSMo.
Contract duration
180 working days from the date of the Notice of Intent to Award
Submission
NAICS
236220, 236221
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 5 watch-outs that disqualify bidders
- The 7-item required-submittals checklist
Cancel anytime · no card to browse
Project details
The project involves the renovation of the existing conditioned space within the Pre-Trip Inspection Building for Troop A CDL in Lees Summit, Missouri. A completed Anti-Discrimination Against Israel Act Certification (Box A, B, or C) is required. The Affidavit of Work Authorization (004541) and Anti-Discrimination Against Israel Act Certification (004545) must be submitted with the bid.
Key dates
- Pre-bid meeting
- Dec 1, 2026, 10:00 AM Central Time
- Bids due
- Dec 17, 2026, 11:59 PM CT
Documents
- R2609-01_Final_Bid_Documents.pdf18 pages
- R2609-01_IFB.pdf1 pages
- R2609-01_Final_Bid_Plans.pdf
- R2609-01_Final_Bid_Specs.pdf
More from this agency
- Replace Security Doors at Fulton Reception and Diagnostic Correctional Center — closes Nov 19, 2026
- Reclaim & Stabilize Marsh Phase 1 Campgrounds – Big Lake State Park — closes Dec 1, 2026
- Renovate Interior to Create Storage — closes Dec 3, 2026
- Update CCC Restroom and Renovate Washington State Park CCC Restroom into Cabin — closes Dec 3, 2026
- HVAC and Interior Renovation — closes Dec 8, 2026
Similar open bids
- Citywide Glass, Window, Door Repair and Replacement — City of Springfield
- Traffic Marking Beads Supply Contract — City of St. Louis
- Guide Assy., Lower Pivot LH L/Flr Exit Door, Mud Flap Retainer - RFQ #705113 — Bi-State Development (Metro St. Louis)
- Request for Proposals – UniFi Door Access System — West County EMS & Fire Protection District
- Request for Proposals: Renovate Room 388, Glass Hall — Missouri State University
Closing this week nearby
- Alton R-Iv School District: E-Rate FY2027 Category 2 - Switches and Necessary Software and Licenses; Switches — closes Nov 18, 2026
- Supplemental Workforce for STIP Projects — Construction and Materials Division, District CO — closes Nov 18, 2026
- Guard Wheel Power Truck Shade Window Right Side (Core Return) — OEM Only, Per Bi-State Specifications — closes Nov 19, 2026
- ISD Santa Fe Trails Elementary School Roof Improvements — closes Nov 19, 2026
- New Ballas Sidewalk Project – Phase 3 — closes Nov 19, 2026