Request for Proposals: Renovate Room 388, Glass Hall
Missouri State UniversityMissouri
on December 15, 2026. A bid bond or certified check for 5% of the bid amount is required. Bidders must comply with prevailing wage requirements. The work is located on the Missouri State University campus.
On PublicBidSearch: the newspaper notice for this bid.
Overview
- Due
- Dec 15, 2026, 2:00 PM CT
- Time stated in bid documents
- Dec 15, 2026, 2:00 PM Central Time
- Bid bond
- 5%
- Submission
- electronic portal
- Required submission items
- 1 items · full checklist with Pro
Steps to Bid
- 1
Register with DemandStar if not already registered.
- 2
Review the full solicitation, plans, and specifications at Official linkPro.
- 3
Ensure the bid bond or certified check for 5% of the bid amount is included with the submission. by Dec 15, 2026, 2:00 PM
What you'll need
Insurance
RequiredBidders must agree to comply with the prevailing wage rate provisions and other statutory regulations as referred to in the specifications.
Submission
Electronic portal
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 2 watch-outs that disqualify bidders
- The 1-item required-submittals checklist
Cancel anytime · no card to browse
Project details
Bidders must comply with prevailing wage rate provisions and other statutory regulations as specified. Missouri State University is an AA/EO institution. This notice was published in the St. Louis Post-Dispatch.
Key dates
- Bids due
- Dec 15, 2026, 2:00 PM CT
Similar open bids
- Citywide Glass, Window, Door Repair and Replacement — City of Springfield
- Traffic Marking Beads Supply Contract — City of St. Louis
- Design & Construct Addition to Pre-Trip Inspection Building, Troop A CDL, Lees Summit, MO — Missouri Office of Administration - Division of Facilities…
- Guide Assy., Lower Pivot LH L/Flr Exit Door, Mud Flap Retainer - RFQ #705113 — Bi-State Development (Metro St. Louis)
- Request for Proposals – UniFi Door Access System — West County EMS & Fire Protection District
Closing this week nearby
- Alton R-Iv School District: E-Rate FY2027 Category 2 - Switches and Necessary Software and Licenses; Switches — closes Nov 18, 2026
- Supplemental Workforce for STIP Projects — Construction and Materials Division, District CO — closes Nov 18, 2026
- Guard Wheel Power Truck Shade Window Right Side (Core Return) — OEM Only, Per Bi-State Specifications — closes Nov 19, 2026
- ISD Santa Fe Trails Elementary School Roof Improvements — closes Nov 19, 2026
- New Ballas Sidewalk Project – Phase 3 — closes Nov 19, 2026