OpenRFPCloses Dec 3, 2026

Design-Build of 2 Storage Facilities

Town of West Hartford — ProcurementWest Hartford, Hartford, Connecticut#270007

The Town of West Hartford is seeking qualified Design-Build teams to plan, design, engineer, and construct two storage facilities at the Public Works Municipal Complex: a police vehicle storage facility at 12 Brixton Street and a public works equipment and material storage facility at 17 Brixton Street. The project emphasizes security, durability, energy efficiency, and low maintenance. Bidders must be qualified for design-build delivery. A pre-bid meeting is scheduled for November 17, 2026. The contact for questions is Tara Cummins at [email available with Pro] or (860) 561-7472.

On PublicBidSearch: the original bid posting and the agency contact (name, email and phone) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName, email and phone — included with ProPro

Overview

Due
Dec 3, 2026
Time stated in bid documents
Dec 3, 2026, 2:00 PM Eastern Time
Submission
mail, hand delivery

Scope of work

  • Deliver full design-build services including planning, engineering, and construction
  • Complete project within a timeframe consistent with operational readiness needs

Steps to Bid

  1. 1

    Register with the Town of West Hartford procurement portal (if required)

  2. 2

    Attend the pre-bid meeting on November 17, 2026, at 7:00 AM ET was Nov 17, 2026, 7:00 AM

    This date has passed — confirm eligibility with the agency before bidding.

  3. 3

    Submit a proposal to the Town of West Hartford Procurement Department by December 3, 2026, at 2:00 PM ET by Dec 3, 2026, 2:00 PM

What you'll need

Submission

Mail, Hand delivery

NAICS

30500, 90600, 90607, 90610, 90735, 91200, 91300, 91400, 91831, 91842

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 4 watch-outs that disqualify bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

The purpose of this project is to design and construct two storage facilities with security, durability, energy-efficiency, and low maintenance as underlying requirements to improve operational efficiencies and readiness.

Key dates

Pre-bid meeting
Nov 17, 2026, 7:00 AM Eastern Time
Bids due
Dec 3, 2026

More from this agency

Similar bids near West Hartford

Closing soon near West Hartford