OpenRFPCloses Dec 23, 2026

Engineering, Procurement, and Construction Services for Solar at Connecticut Affordable Multifamily Housing, State and Municipal Sites

Connecticut Green BankHartford, Connecticut

Prevailing wage pricing is required for State projects and encouraged for others. Key dates include: Proposer Questions Due December 9, 2026 (Municipal/Affordable Multifamily) and December 16, 2026 (State); Submissions Due December 23, 2026 (Municipal/Affordable Multifamily) and January 11, 2027 (State). Proposals must be submitted electronically to [email available with Pro]. Site visits are encouraged and registration is required. Awardees must maintain specific insurance coverage, including commercial general liability of $1,000,000 per occurrence/$2,000,000 aggregate, automobile liability of $1,000,000, worker's compensation, umbrella liability of $5,000,000, and professional liability of $1,000,000 per occurrence/$1,000,000 aggregate.

On PublicBidSearch: the original bid posting, 14 bid documents and the agency contact (email) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidEmail — included with ProPro

Overview

Due
Dec 23, 2026
Time stated in bid documents
Dec 23, 2026, 4:00 PM Eastern Time
Submission
email
Documents analyzed
14 published · 11 analyzed

Scope of work

  • Provide engineering, procurement, and construction (EPC) services for solar PV projects.
  • Comply with prevailing wage requirements for State projects.
  • Submit fully engineered system designs signed and sealed by a Connecticut-registered Professional Engineer.

Steps to Bid

  1. 1

    Review RFP and all exhibits and associated documents.

    Proposers shall carefully examine the RFP and any and all amendments, exhibits, revisions, and other data and materials provided with respect to this RFP process.

  2. 2

    Submit Proposer Questions.

    Any questions must be submitted to [email available with Pro].

  3. 3

    Submit Proposals.

    Proposals shall be submitted electronically to [email available with Pro]. The subject line should be: “Proposal for Solar and Storage EPC Services - Cross Sector”.

What you'll need

Submission

Email

How to submit

Proposals shall be submitted electronically to [email available with Pro]. The subject line should be: “Proposal for Solar and Storage EPC Services - Cross Sector”.

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 8 watch-outs that disqualify bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

Secondary bids for prevailing wage are encouraged but optional for affordable multifamily housing and municipal projects, with the exception of Father Honan Terrace, where pricing for both standard and prevailing wages is solicited. CSW Energy has been retained to assist with technical due diligence, RFP co-administration, and proposal review. The scope of services includes participation in NRES, NRES School Carveout, and RRES Affordable Multifamily incentive programs. Awardees will be responsible for utility interconnection application processes and securing contingent approval for construction. Awardees are responsible for acquiring all necessary permits and approvals and paying applicable fees. Electrical plans must identify interconnection points, connection methods, new equipment locations, and any required upgrades. Data acquisition systems must allow for remote performance monitoring. FM Global review is required for specific sites. Roof-mounted systems require structural analysis, and may require squirrel guards, roof staging plans, slip sheets, overburden waivers, lightning protection bonding, and compliance with ballast block and rapid shutdown device requirements. Carport and ground-mounted systems have specific requirements including ALTA surveys, Phase 1 ESAs, construction entrance and access paths, underground surveys, fencing specifications, and design standards for carports (equipment mounting, snow rails, coating, clearance heights, stormwater/snow management, site lighting, construction phasing, and site repair). Module transport costs are to be included in the Contract Sum. Awardees are responsible for site security, cleanup, and developing a site-specific health and safety plan. Electrical installations must comply with National Electrical Code standards. Facility shutdowns for interconnection must be coordinated with site representatives. Solar commissioning requires performance testing and submission of a commissioning report.

Key dates

Questions due
Dec 9, 2026, 4:00 PM Eastern Time
Bids due
Dec 23, 2026

Documents

  • CGB-Solar-Cross-Sector-EPC-RFP-2-Final-PDF.pdf25 pages
  • url
  • Exhibit-B-AMFH-Muni-Final.xlsx
  • Exhibit-C-CGB-Approved-Vendor-List_8.1.2026-Final.pdf1 pages
  • Exhibit-D-CGB-Template-EPC-Combined-with-LTNP-for-Solar-11-2026-clean.pdf106 pages
  • Exhibit-E-CGB-Template-EPC-for-Solar-6-3-25-Commissioning-Form.pdf5 pages
  • Exhibit-F-Hyundai-Modules-Information-Specification.pdf9 pages
  • Exhibit-G-Specs-and-Pricing-AMFH-Muni.xlsx

6 more files

See all documents · Download with Pro

Similar bids near Hartford

Closing soon near Hartford