DNR Washington County SRA - Install New Floating Docks
DNR - Natural ResourcesIllinois#27-422DNR-REALT-B-54674
The Illinois Department of Natural Resources (DNR) is soliciting bids for the installation of new floating boat docks at the Washington County State Recreation Area (SRA). The project includes removal of existing docks and installation of new galvanized steel frame floating docks with composite decking, concrete abutments, and riprap. Locations 1-3 are part of the base bid, with locations 4-7 as additive alternates. Bidders must be registered in the Illinois Procurement Gateway (IPG) or submit a Vendor Disclosure. Electronic submissions are required through BidBuy by November 12, 2026, at 2:00 PM CT. Vendor must have 3 years of experience in commercial marine or general construction and have completed at least 3 similar projects. A construction bond is required for projects over $150,000. The contract term is from the last dated signature to May 31, 2027, with a maximum total term of ten years. Prevailing wage requirements apply.
On PublicBidSearch: the original bid posting, 7 bid documents and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Nov 12, 2026, 2:00 PM CT
- Time stated in bid documents
- Nov 12, 2026, 2:00 PM Central Time
- Bid bond
- Required
- Submission
- electronic portal
- Contract term
- May 31, 2027
- Documents analyzed
- 7
Scope of work
- Remove existing floating boat docks and associated items.
- Construct new concrete abutments, approach pads, and riprap protection.
- Install new gangways and spud poles.
Steps to Bid
- 1
Review and respond to the Invitation for Bid (IFB).
Ensure compliance with all instructions and requirements.
- 2
Review and select 'Yes', 'No', or 'Yes with Exceptions' in the Terms and Conditions Tab. was Nov 12, 2026, 2:00 PM
This date has passed — confirm eligibility with the agency before bidding.
If taking exceptions, a redlined version of the Standard Terms and Conditions must be submitted with the Bid.
- 3
Upload all required quote attachments in the Attachments Tab. was Nov 12, 2026, 2:00 PM
This date has passed — confirm eligibility with the agency before bidding.
- 4
Submit the quote via the Summary Tab. was Nov 12, 2026, 2:00 PM
This date has passed — confirm eligibility with the agency before bidding.
What you'll need
Bid security
RequiredConstruction Bond - Pursuant to the Public Construction Bond Act (30 ILCS 550/), Sec. 1. Except as otherwise provided by this Act, until January 1, 2029, all officials, boards, commissions, or agents of this State, or of any political subdivision thereof, in making contracts for public work of any kind costing over $150,000 to be performed for the State, or of any political subdivision thereof, shall require every contractor for the work to furnish, supply and deliver a bond to the State, or to the political subdivision thereof entering into the contract, as the case may be, with good and sufficient sureties. The surety on the bond shall be a company that is licensed by the Department of Insurance authorizing it to execute surety bonds and the company shall have a financial strength rating of at least A- as rated by A.M. Best Company, Inc., Moody's Investors Service, Standard & Poor's Corporation, or a similar rating agency. The amount of the bond shall be fixed by the officials, board
Submission
Electronic portal
Get alerts for bids like this
New construction bids in Illinois
This bid has closed. We'll tell you when the next one like it posts. Free, no card needed.
Get alerts — freeProject details
This project involves the construction and installation of multiple replacement floating boat docks at various locations within the Washington County State Recreation Area (SRA). Dock locations 1, 2, and 3 are included in the base bid, while locations 4, 5, 6, and 7 are offered as individual additive alternate bids. The project area consists of multiple individual sites spread across the SRA, which will remain open to the public during construction. Work must be coordinated with the Site Superintendent to minimize impacts. Concurrent work at multiple sites will be limited, and partial acceptance of completed sites may be requested. A preconstruction meeting with IDNR stakeholders is required before commencing work. Final locations and elevations of docks and abutments must be staked by the contractor and approved by the DNR Regional Engineer prior to construction. The contractor is responsible for identifying and locating existing utilities and repairing any damage to them at their expense. Damage to adjacent turf, trees, pavements, or other features must also be repaired at the contractor's expense. Excess excavation and removed materials must be hauled offsite and disposed of legally. The project specifications detail requirements for floating docks, cast-in-place concrete, materials, equipment, and installation procedures.
Documents
- Attachment_1_-_Project_Plans_12.pdf11 pages
- Attachment_2_-_Project_Specifications_5.pdf16 pages
- B54674invitation-for-bid-vendor-instructions-and-requirements-v26-1.docx
- B54674contract-template-v-25-4.docx
- B54674invitation-for-bid-offer-to-the-state-of-illinois-v-25-3-2-24-25.pdf1 pages
- B54674_BLANK_vendor-disclosure-formerly-forms-a-v27-1.docx
- B54674_BLANK_ipg-active-registered-vendor-disclosure-formerly-forms-b-v-26-.docx
More from this agency
- Sanganois State Fish and Wildlife Area Farm Lease — closes Nov 25, 2026
- 27AL2003 Turkey Bluffs State Fish and Wildlife Area Farm Lease — closes Nov 25, 2026
- Sangchris Lake State Park Farm Lease — closes Nov 25, 2026
- 27AL2558 Chauncey Marsh State Natural Area Farm Lease — closes Nov 25, 2026
- DNR-Rice Lake SFWA - Disc Harrow — closes Nov 30, 2026
Similar open bids
- Central Utility Building Addition and Renovation Construction, UIP Subproject 1-CUB — ENERGY, DEPARTMENT OF
- Request for Proposals (Solicitation of Alternate Proposals) for Village-owned Property - 17924 Halsted Street — Village of Homewood
- PIP-II F-37 Building Low Conductivity Water (LCW) Pump Room Piping System Installation — ENERGY, DEPARTMENT OF
- Repair Building Systems — AGRICULTURAL RESEARCH SERVICE
- Kautz Road Substation Construction, UIP Subproject 2-KRS — ENERGY, DEPARTMENT OF
Closing this week nearby
- Wayfinding Signage Project – Request for Qualifications — closes Nov 20, 2026
- Erie Elementary Charter School: E-Rate FY2027 Category 1 - Internet Access and Data Transmission Service — closes Nov 20, 2026
- E-Rate FY2027 Category 1 - Internet Access and Data Transmission Service — closes Nov 20, 2026
- Erie Elementary Charter School: E-Rate FY2027 Category 2 - Antennas, Connectors, and Related Components — closes Nov 20, 2026
- E-Rate FY2027 Category 1 Internet Access and Data Transmission Services — closes Nov 20, 2026