ClosedConstruction

Widen Sawgrass (SR 869) from University Drive to SR 7 — Roadway Reconstruction, Bridge Widening, Stormwater, Lighting, Signing, and ITS Improvements — Broward County, FL (E8V64)

Florida Department of Transportation — FDOTFlorida#E8V64

Work includes roadway reconstruction, bridge widening, stormwater improvements, lighting, signing, pavement marking, traffic signals, and ITS systems. Addendum No. 1 revised quantities and plan sheets. Project budget estimate: $118,000,000.00.

On PublicBidSearch: the original bid posting, 4 bid documents and the agency contact (name, email and phone) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName, email and phone — included with ProPro

Overview

Due
Nov 17, 2026
Submission
online portal
Contract term
3 years + two additional one-year renewal terms
Documents analyzed
4 published · 2 analyzed

Scope of work

  • Widen SR 869 from University Drive to SR 7, 6 to 10 lanes
  • Reconstruct and resurface 6.983 miles of roadway
  • Widen and reconstruct bridges over University Drive and Riverside Drive
  • Install stormwater drainage and ponds

Steps to Bid

  1. 1

    Register with FDOT's online procurement system (CPP.Web) and download the full bid package, including plans, specifications, and addenda.

  2. 2

    Review the full bid documents, including the revised quantities and plan sheets in Addendum No. 1.

  3. 3

    Submit a bid response by 2:30 PM local time on November 10, 2026, via the FDOT online portal (CPP.Web) or by mail to the address provided.

What you'll need

Submission

Online portal

NAICS

237130

How to submit

Submit via FDOT's online procurement system (CPP.Web). All documents must be uploaded in the required format. Bid must be received by 2:30 PM local time on November 10, 2026.

In person/mail: Florida Department of Transportation, P.O. Box 613069, Ocoee, FL 34761

Get alerts for bids like this

New drainage and stormwater bids in Florida

This bid has closed. We'll tell you when the next one like it posts. Free, no card needed.

Get alerts — free

Project details

Contract No. Work includes roadway reconstruction, widening, milling and resurfacing, widening of Bridges 860498, 860499, 860500, and 860501 over University Drive and Riverside Drive, stormwater enhancements and ponds, Coral Ridge Drive interchange reconstruction, lighting, signing, pavement marking, traffic signals, and Intelligent Transportation System (ITS) improvements on SR 869 from MP 14.867 to MP 18.444. Includes removal of existing structures, bridge superstructure and substructure construction, concrete barriers, guardrails, traffic control, temporary work zone devices, and installation of conduit, junction boxes, and electrical systems. Addendum No. 1 issued October 6, 2026, revises quantities and plan sheets.

Documents

  • e8v64.pdf11 pages
  • e8v64addenda001.pdf3 pages
  • e8v64-11-17-26.pdf11 pages
  • e8v64addenda002.pdf4 pages

See all documents · Download with Pro

More from this agency

Similar bids in Florida

Closing soon in Florida