OpenConstructionCloses Dec 2, 2026

Resurfacing and Infrastructure Improvements on SR 63 (US 27/Monroe St) in Leon County, Florida

Florida Department of Transportation — FDOTFlorida#T3A41

Scope includes milling and resurfacing of 5.98 miles of roadway, traffic control, pavement markings (painted and thermoplastic), concrete curbs and gutters, sidewalks, signalization upgrades, guardrail installation and removal, and utility adjustments for City of Tallahassee Water and Sewer, City of Tallahassee Power, and CenturyLink. The project is estimated at $13.7 million and has a 435-day contract duration.

On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (name, email and phone) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName, email and phone — included with ProPro

Overview

Due
Dec 2, 2026
Time stated in bid documents
Dec 2, 2026, 11:59 PM Eastern Time
Submission
mail, hand delivery
Contract term
435 days + None
Documents analyzed
1

Scope of work

  • Resurface 5.98 miles of SR 63 from SR 263 to north of John Knox Road
  • Milling and resurfacing of travel lanes, auxiliary lanes, median crossovers, and paved shoulders
  • Install sidewalks and improve pedestrian access at crosswalks and curb ramps
  • Upgrade signalization at intersections and restripe bridges over SR 8
  • Adjust manholes and valves for City of Tallahassee Water and Sewer, City of Tallahassee Power, and CenturyLink
  • Install traffic control devices, temporary signage, and pavement markings

Steps to Bid

  1. 1

    Register with FDOT's vendor portal and obtain a vendor ID.

  2. 2

    Submit questions to the FDOT contact listed in the document by the deadline. by Dec 2, 2026, 10:00 AM

  3. 3

    Attend the pre-bid meeting (if required) on December 2, 2026, at 10:00 AM ET. by Dec 2, 2026, 10:00 AM

What you'll need

Submission

Mail, Hand delivery

NAICS

237130, 237199

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 2 watch-outs that disqualify bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

Scope also includes median access changes, sidewalk additions, signalization improvements, and addressing design deficiencies such as non-compliant curb ramps, deficient sidewalks, and clear space requirements. Pedestrian signal features and restriping of Bridge #550068 and Bridge #550085 over SR 8 (I-10) are included. No improvements are planned for Bridge Culvert #550003 over Meginnis Arm. Utility work by the highway contractor includes adjustments to manholes and valves owned by the City of Tallahassee Water and Sewer (FPID 452939-1-52-02), City of Tallahassee Power (FPID 452939-1-52-03), and CenturyLink (Lumen) (FPID 452939-1-52-04). The project spans 5.980 miles of roadway and 0.070 miles of bridge.

Key dates

Pre-bid meeting
Dec 2, 2026, 10:00 AM Eastern Time
Bids due
Dec 2, 2026

Documents

  • T3A41BSN.pdf5 pages

See all documents · Download with Pro

More from this agency

Similar bids in Florida

Closing soon in Florida