OpenIFBCloses Dec 4, 2026, 4:00 PM CT

Replacement of Box Culvert on Stoddard County Road 283 at Duck Creek Township

Stoddard CountyBloomfield, Missouri

Stoddard County is seeking bids to replace a box culvert on County Road 283, 1.5 miles north of J Highway. The work includes removal of the existing structure and installation of a new 18x24 ft box culvert with wing walls at a height of 7 feet. Submissions are due by 4:00 PM on December 4, 2026, at the Stoddard County Clerk’s Office in Bloomfield, MO.

On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (name and phone) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName and phone — included with ProPro

Overview

Due
Dec 4, 2026, 4:00 PM CT
Time stated in bid documents
Dec 4, 2026, 4:00 PM Central Time
Submission
mail, hand delivery
Documents analyzed
1
Required submission items
4 items · full checklist with Pro

Steps to Bid

  1. 1

    Review the solicitation and scope of work.

  2. 2

    Contact Doug Lowery at (573) 321-0735 for site-specific details.

  3. 3

    Submit the sealed bid to the Stoddard County Clerk’s Office at 401 S Prairie St., Bloomfield, MO, by 4:00 PM on December 4, 2026. by Dec 4, 2026, 4:00 PM

What you'll need

Submission

Mail, Hand delivery

NAICS

237130, 237199

How to submit

Sealed bids must be clearly marked on the outside as 'Duck Creek Township Box Culvert CR 283'. Bids may be mailed or delivered to the Stoddard County Clerk’s Office at 401 S Prairie St., Bloomfield, MO.

In person/mail: Stoddard County Clerk's Office, PO Box 110, Bloomfield, Missouri 63825

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 1 watch-out that disqualifies bidders
  • The 4-item required-submittals checklist
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

Stoddard County is soliciting sealed bids for the replacement of an existing box culvert on Stoddard County Road 283, located 1.5 miles north of J Highway at the intersection with County Road 283 B. The scope of work includes removal of the existing culvert structure and replacement with a new 18-foot by 24-foot box culvert featuring wing walls, constructed to a height of 7 feet. Bids must be submitted in sealed envelope format, clearly marked 'Duck Creek Township Box Culvert CR 283', and delivered to the Stoddard County Clerk’s Office at 401 S Prairie St., Bloomfield, MO, no later than 4:00 PM on Friday, December 4, 2026.

Key dates

Bids due
Dec 4, 2026, 4:00 PM CT

Documents

  • Commission-Duck-Creek-Township-CR-283-Box-Culvert.pdf1 pages

See all documents · Download with Pro

More from this agency

Similar open bids

Closing this week nearby