Replacement of Box Culvert on Stoddard County Road 283 at Duck Creek Township
Stoddard CountyBloomfield, Missouri
Stoddard County is seeking bids to replace a box culvert on County Road 283, 1.5 miles north of J Highway. The work includes removal of the existing structure and installation of a new 18x24 ft box culvert with wing walls at a height of 7 feet. Submissions are due by 4:00 PM on December 4, 2026, at the Stoddard County Clerk’s Office in Bloomfield, MO.
On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (name and phone) for this bid.
Contact
Agency contact for this bidName and phone — included with ProProOverview
- Due
- Dec 4, 2026, 4:00 PM CT
- Time stated in bid documents
- Dec 4, 2026, 4:00 PM Central Time
- Submission
- mail, hand delivery
- Documents analyzed
- 1
- Required submission items
- 4 items · full checklist with Pro
Steps to Bid
- 1
Review the solicitation and scope of work.
- 2
Contact Doug Lowery at (573) 321-0735 for site-specific details.
- 3
Submit the sealed bid to the Stoddard County Clerk’s Office at 401 S Prairie St., Bloomfield, MO, by 4:00 PM on December 4, 2026. by Dec 4, 2026, 4:00 PM
What you'll need
Submission
Mail, Hand delivery
NAICS
237130, 237199
How to submit
Sealed bids must be clearly marked on the outside as 'Duck Creek Township Box Culvert CR 283'. Bids may be mailed or delivered to the Stoddard County Clerk’s Office at 401 S Prairie St., Bloomfield, MO.
In person/mail: Stoddard County Clerk's Office, PO Box 110, Bloomfield, Missouri 63825
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 1 watch-out that disqualifies bidders
- The 4-item required-submittals checklist
Cancel anytime · no card to browse
Project details
Stoddard County is soliciting sealed bids for the replacement of an existing box culvert on Stoddard County Road 283, located 1.5 miles north of J Highway at the intersection with County Road 283 B. The scope of work includes removal of the existing culvert structure and replacement with a new 18-foot by 24-foot box culvert featuring wing walls, constructed to a height of 7 feet. Bids must be submitted in sealed envelope format, clearly marked 'Duck Creek Township Box Culvert CR 283', and delivered to the Stoddard County Clerk’s Office at 401 S Prairie St., Bloomfield, MO, no later than 4:00 PM on Friday, December 4, 2026.
Key dates
- Bids due
- Dec 4, 2026, 4:00 PM CT
Documents
- Commission-Duck-Creek-Township-CR-283-Box-Culvert.pdf1 pages
More from this agency
- Replacement of Bridge Top on Stoddard County Road 702 — closes Dec 4, 2026
- Replacement of Box Culvert Deck on Stoddard County Road 279 — closes Dec 4, 2026
Similar open bids
- Southwest Wastewater Treatment Plant, Plant 2 Clarifier 2 Adaptive Inlet Clarifier Upgrade — City of Springfield
- 2026 I-44 to 44th St., Detention and Drainage Improvements — City of Joplin, Missouri
- Ward & Persels Intersection Improvements — City of Lee's Summit
- Replacement of Box Culvert on Stoddard County Road 283 — Duck Creek Township of Stoddard County
- Replacement of the Deck for the Box Culvert on Stoddard County Road 279 — Duck Creek Township of Stoddard County
Closing this week nearby
- Engineering Services: Highway Safety Manual Analysis of CATSO Intersections and Roadways — closes Nov 20, 2026
- EV4880 Tax Burden Study — closes Nov 21, 2026
- Addition & Remodel to Existing Building at Mountain Grove High School Campus – OMTC Building — closes Nov 20, 2026
- Beverage Procurement Program — closes Nov 20, 2026
- Amphitheater Venue Management — closes Nov 20, 2026