Southwest Wastewater Treatment Plant, Plant 2 Clarifier 2 Adaptive Inlet Clarifier Upgrade
City of SpringfieldSpringfield, Missouri#030-2027IFB
This Invitation for Bid (IFB) #030-2027 is for the Southwest Wastewater Treatment Plant, Plant 2 Clarifier 2 Adaptive Inlet Clarifier Upgrade project in Springfield, MO. Bids are due electronically by 3:00 P.M. (CST) on December 10, 2026, via Euna OpenBids. The scope involves removing and installing a new clarifier mechanism and associated systems. Prevailing wage laws apply to public works projects over $75,000. Bidders must comply with Missouri's work authorization laws for service contracts over $5,000. A bid bond of at least 5% of the total bid price is required. A performance bond and labor and materials payment bond will be required after award. A pre-bid conference is scheduled for November 11, 2026, at 10:00 A.M. (CST), and a site visit is scheduled for November 11, 2026, at 2:00 P.M. (CST). Questions are due by November 18, 2026, at Noon (CST).
On PublicBidSearch: the original bid posting, 6 bid documents and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Dec 10, 2026, 3:00 PM CT
- Time stated in bid documents
- Dec 10, 2026, 3:00 PM Central Time
- Bid bond
- 5%
- Performance bond
- Required
- Payment bond
- Required
- Submission
- electronic portal
- Documents analyzed
- 6 published · 3 analyzed
Scope of work
- Removal of existing Plant 2 Clarifier 2 clarifier mechanism.
- Installation of new sludge/scum collection system.
- Mechanical, electrical, and controls integration to create a fully functional system.
Steps to Bid
- 1
Register with Euna OpenBids (formerly DemandStar).
[link available with Pro]
- 2
Attend the Pre-Bid Conference (encouraged). was Nov 11, 2026, 10:00 AM
This date has passed — confirm eligibility with the agency before bidding.
Videoconference. Email Senior Buyer, Ben Calia, at [email available with Pro] for the link and password.
- 3
Conduct Site Visit. was Nov 11, 2026, 2:00 PM
This date has passed — confirm eligibility with the agency before bidding.
Location: 3301 West Bypass, Springfield, MO 65807. No questions will be taken at the site tour.
- 4
Submit questions in writing to the Buyer. was Nov 18, 2026, 12:00 PM
This date has passed — confirm eligibility with the agency before bidding.
Buyer's contact information is on the Title-Signature Page.
- 5
Check the Division of Purchases e-bidding platform for addenda.
[link available with Pro]
- 6
Upload bids electronically to Euna OpenBids (formerly DemandStar). by Dec 10, 2026, 3:00 PM
Bids must be received electronically by this date and time.
What you'll need
Bid security
RequiredThe Contractor shall furnish a Performance Bond and a Labor and Materials Payment Bond with surety approved by the City and on the forms approved by the City. Each bond shall be in the full amount of the contract conditioned upon the full and faithful performance of all major terms and conditions of this contract and payment of all labor and material suppliers.
Contract duration
450 calendar days after Notice to Proceed for Substantial Completion, and 45 calendar days after Substantial Completion for Final Completion.
Submission
Electronic portal
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 10 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
Bids must be submitted electronically through Euna OpenBids (formerly DemandStar) by 3:00 P.M. (CST) on December 10, 2026. Bids will be read aloud via teleconference. Bidding documents and addenda are available via Euna OpenBids or the Division of Purchases webpage. Prevailing wage is applicable on public works construction projects valued at more than $75,000.00. For contracts for services greater than $5,000, bidders must comply with § 285.530, RSMo., providing affirmation of not knowingly employing unauthorized aliens and documentation of enrollment in a federal work authorization program. The City is committed to providing opportunities to DBE, MBE, and WBE prime, general and subcontractors. A site visit will be held on November 11, 2026, at 2:00 P.M. (CST) at 3301 West Bypass, Springfield, MO 65807. Hand-delivered, faxed, or emailed bids will not be accepted. Bids must be uploaded into the Euna OpenBids system prior to the due date and time. Bidders are required to complete, sign, and return the Title-Signature Page with their submittal. The successful bidder shall secure licenses imposed by law and ordinance and pay all charges, including a City of Springfield Business License and registration with the Missouri Secretary of State. A Bid Bond in the amount of not less than five percent (5%) of the total bid price is required. A Performance Bond and a Labor and Materials Payment Bond will be required prior to the issuance of a contract, each in the full amount of the contract.
Key dates
- Questions due
- Nov 18, 2026, 12:00 PM Central Time
- Pre-bid meeting
- Nov 11, 2026, 10:00 AM Central Time
- Site visit
- Nov 11, 2026, 2:00 PM Central Time
- Bids due
- Dec 10, 2026, 3:00 PM CT
Documents
- BID 030-2027IFB-SWTP P2 CLR 2 Adaptive Inlet Clarifier-Final.pdf58 pages
- BID 030-2027IFB Attachment 1 - 2026 Springfield General Cond.pdf279 pages
- BID 030-2027IFB Attachment 2 - SWTP Plant 2 Clarifier 2 .pdf564 pages
- BID 030-2027IFB Attachment 4 - Passavant Geiger Hydrograv Ad.pdf
- IFB 0030-2027 ADDENDUM No. 1.pdf2 pages
1 agency-portal link
More from this agency
- Tennis Court Repair and Maintenance — closes Nov 23, 2026
- Liquid Aluminum Sulfate Supply Contract — closes Nov 30, 2026
- Asset Management Plan – Springfield-Greene County Parks — closes Dec 1, 2026
- School Zone Flashing Beacon System Replacement — closes Dec 2, 2026
- Basketball League Administrator — closes Dec 3, 2026
Similar open bids
- Coldmill, Resurface, Drainage, and ADA Improvements on BU 50 and Route J in Knob Noster, Johnson County — Missouri Department of Transportation
- Culvert Replacement and ADA Improvements over Muddy Creek in Harrisonville, Route 2, Cass County — Missouri Department of Transportation
- Grading, Pavement, Drainage, Bridge Replacement, and Culvert Replacement on Route CC, County Road 1350, Route 245,… — Missouri Department of Transportation
- Tube Exhaust Bellows DPF Inlet 67 through 7500 - RFQ #705101 — Bi-State Development (Metro St. Louis)
- Ward & Persels Intersection Improvements — City of Lee's Summit
Closing this week nearby
- Re-Post-EV4630 Immigration and Refugee Health Clinic Civil Surgeon — closes Nov 17, 2026
- Hickory County School Dist R 1: E-Rate FY2027 Category 2 - Antennas, Connectors, and Related Components; Switches and… — closes Nov 17, 2026
- Hickory County School Dist R 1: E-Rate FY2027 Category 2 - Firewall Service, Components, and Necessary Software and… — closes Nov 17, 2026
- Wheaton School District R 3: E-Rate FY2027 Category 1 - Internet Access and Data Transmission Service — closes Nov 17, 2026
- Wheaton School District R 3: E-Rate FY2027 Category 2 - Firewall Service, Components, and Necessary Software and… — closes Nov 17, 2026