Edison Wastewater Treatment Facility Maintenance & Repair Services
Skagit CountyMount Vernon, Washington
Skagit County is soliciting bids for maintenance and repair services at the Edison Wastewater Treatment Facility and surrounding subarea. Services include monthly, quarterly, and yearly inspections, emergency response within 2 hours, FOG/BOD sampling, pump and lift station maintenance, and reporting to the Edison Advisory Board. The contract is for four years with a two-year renewal option. Prevailing wages must be paid.
On PublicBidSearch: the original bid posting, 5 bid documents and the agency contact (name and email) for this bid.
Contact
Agency contact for this bidName and email — included with ProProOverview
- Due
- Dec 7, 2026
- Submission
- email, hand delivery, mail
- Contract term
- four (4) years from the date of execution + two (2) additional years
- Documents analyzed
- 5 published · 4 analyzed
Scope of work
- Quarterly FOG and BOD sampling at commercial sites and Edison School
- Yearly sludge and scum depth measurements in residential and commercial tanks
- Pumping of grease traps, septic tanks, and residential tanks as needed
Steps to Bid
- 1
Obtain documents: Download the Invitation to Bid and Contract Provisions & Specifications from Official linkPro or at Skagit County Planning & Development Services, 1800 Continental Place, Mount Vernon, WA.
- 2
Submit questions: All written questions must be sent to Lavelle Pilon at [email available with Pro] by 8:00 a.m. on Monday, November 30, 2026, with subject line 'Edison Subarea Maintenance & Repair Services'. by Nov 30, 2026, 8:00 AM
- 3
Deliver in person or by mail: If not submitting electronically, deliver to Skagit County Commissioners Reception Desk, 1800 Continental Place, Mount Vernon, WA 98273-5625.
What you'll need
Contract duration
4 years from execution, with option to renew for 2 additional years
Submission
Email, Hand delivery, Mail
NAICS
561720
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 4 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
Skagit County seeks a Wastewater Treatment Maintenance Contractor to provide regularly scheduled and on-call maintenance, repair, and inspection services for the Edison Wastewater Treatment Facility and associated connections within the Edison Subarea, located in Skagit County, Washington. The contract will be for four (4) years from execution, with an option to renew for two (2) additional years. Services include, but are not limited to: monthly, quarterly, and yearly inspections and maintenance tasks; emergency and on-call response within two (2) hours; FOG (Fats, Oils, Grease) and BOD (Biological Oxygen Demand) sampling at commercial sites and the Edison School quarterly; pump station and lift station monitoring; sludge and scum depth measurement in residential, commercial, and school tanks; grease interceptor and septic system maintenance; and reporting to the Edison Advisory Board and Planning Director. Work will be performed during normal business hours (90% or more), with emergent response required within two hours. Bids must be submitted electronically via email to [email available with Pro] by 1:00 p.m. on Monday, December 7, 2026. Prevailing wage rates under Washington State law must be paid. Bids may be delivered in person or by mail to Skagit County Planning & Development Services, 1800 Continental Place, Mount Vernon, WA 98273-5625.
Key dates
- Questions due
- Nov 30, 2026, 8:00 AM Pacific Time
- Bids due
- Dec 7, 2026
Documents
- invitation-to-bid-112426.pdf9 pages
- 202606_L000_DD_GuemesIslandRoadTrail.pdf15 pages
- contract-provisions-and-specifications-112426.pdf8 pages
- invitation-to-bid-112426-98fa559a-99fe-4acf-b36d-03a7bbc9aed3.pdf8 pages
- contract-provisions-and-specifications-112426-3f5fe115-9438-475c-af1f-17e965.pdf8 pages
Similar bids near Mount Vernon
- LS 16, 17 & 18 Upgrades · Lynnwood · closes Jan 7, 2027
- Wastewater Planning and Modeling · Shoreline · closes Dec 2, 2026
Closing soon near Mount Vernon
- Fireworks Display Services · Arlington · closes Nov 30, 2026
- Police Station & Council Chambers · Stanwood · closes Dec 1, 2026
- SR 20 Spur, Anacortes Ferry Terminal Pavement Preservation · Skagit County · closes Dec 2, 2026
- Bus Stop Shelter and Park-and-Ride Cleaning Services · Everett · closes Dec 2, 2026
- Evergreen Way Safety and Connectivity Plan · Everett · closes Dec 5, 2026