Engineering Design Services for Factory Shoals Pedestrian Bridge Phase 1
Cobb County Government — Cobb County Department of TransportationMarietta, Georgia#B2464
Cobb County DOT seeks qualified engineering firms to provide design services for a new pedestrian bridge over I-20 at Factory Shoals Road. Proposals must be submitted electronically via the Opengov portal. The deadline for SOQs is 12:00 PM on November 12, 2026. The County may negotiate with the top-ranked firm to finalize contract terms.
On PublicBidSearch: the original bid posting, 2 bid documents and the agency contact (name, email, phone) for this bid.
Contact
Agency contact for this bidName, email & phone — included with ProProOverview
- Due
- Nov 12, 2026
- Submission
- electronic portal
- Contract term
- One (1) Multi-Phase, Project Specific contract to be awarded to one (1) firm.
- Documents analyzed
- 2
Scope of work
- Provide concept development and environmental documentation
- Prepare preliminary and final construction plans
- Conduct geotechnical investigations and bridge foundation studies
- Coordinate with utility providers and prepare utility plans
Steps to Bid
- 1
Review the full RFQ and Addendum 1
- 2
Submit written questions via the Opengov portal by 12:00 PM on November 6, 2026 was Nov 6, 2026, 12:00 PM
This date has passed — confirm eligibility with the agency before bidding.
- 3
Attend the non-mandatory Pre-Proposal Conference on October 27, 2026, via Microsoft Teams was Oct 27, 2026, 11:00 AM
This date has passed — confirm eligibility with the agency before bidding.
- 4
If shortlisted, prepare and submit the Phase II Technical Approach via the Opengov portal by the date specified in the finalist notification by TBD
What you'll need
Submission
Electronic portal
NAICS
541330, 541340, 541370
Get alerts for bids like this
New engineering bids in Georgia
This bid has closed. We'll tell you when the next one like it posts. Free, no card needed.
Get alerts — freeProject details
The project will provide a dedicated shared-use path (12 feet wide) with 2-foot barriers on each side, connecting the north and south sides of I-20. The scope includes concept development, environmental documentation (including NEPA, cultural resources, ecology, and noise studies), preliminary and final design, right-of-way plans, geotechnical investigations, utility coordination, and construction support. The County reserves the right to reject any or all responses and to negotiate with the highest-ranked firm.
Documents
- B2464_Factory_Shoals_Ped_Bridge_-_RFQ.pdf32 pages
- B2464_Factory_Shoals_Ped_Bridge_-_Addendum_1.pdf8 pages
More from this agency
- Bell Ferry Road / Roberts Boulevard / Vaughn Road Transit ADA Improvements — closes Dec 10, 2026
- Canton Road at Lake Drive / Old Noonday School House Road — closes Dec 10, 2026
- Cobb Parkway at McCollum Parkway Realignment — closes Feb 25, 2027
- Request for Qualifications for Prequalification of New Contractors for Cobb County Water System for 2026–2028 Period — closes May 31, 2028
Similar open bids
- New Student Union - Feasibility, Programming and Concept — University Of West Georgia
- Professional Engineering Services Request for Qualifications — City of Jasper
- Design Services Hidden Creek Park — City of Dunwoody
- DSC J-472 DP, Utilities Upgrades Phase 1 RFQ-RFP — Regents, Board Of(University System Of Georgia)
- Repair of the TH-1H Servo Con Altimeter (NSN 6610014597535HL, Part No. 8047/10NVG-5V) — DEPT OF THE AIR FORCE
Closing this week nearby
- Program Management Services for TAP and LAP — Request for Qualifications — closes Nov 16, 2026
- Cargo Vans for Technology Department — Reissue — closes Nov 16, 2026
- RFP for JCSS PreK-12 Furniture Procurement Services — closes Nov 16, 2026
- Furniture Procurement Services for Hayes Farm Elementary, Sells Mill Middle, and Hoschton High Schools — closes Nov 16, 2026
- License to Access the American Hospital Association Inc.’s (AHA) Proprietary Databases, Training, and Technical Support — closes Nov 16, 2026