ClosedConstruction

Engineering Design Services for Factory Shoals Pedestrian Bridge Phase 1

Cobb County Government — Cobb County Department of TransportationMarietta, Georgia#B2464

Cobb County DOT seeks qualified engineering firms to provide design services for a new pedestrian bridge over I-20 at Factory Shoals Road. Proposals must be submitted electronically via the Opengov portal. The deadline for SOQs is 12:00 PM on November 12, 2026. The County may negotiate with the top-ranked firm to finalize contract terms.

On PublicBidSearch: the original bid posting, 2 bid documents and the agency contact (name, email, phone) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName, email & phone — included with ProPro

Overview

Due
Nov 12, 2026
Submission
electronic portal
Contract term
One (1) Multi-Phase, Project Specific contract to be awarded to one (1) firm.
Documents analyzed
2

Scope of work

  • Provide concept development and environmental documentation
  • Prepare preliminary and final construction plans
  • Conduct geotechnical investigations and bridge foundation studies
  • Coordinate with utility providers and prepare utility plans

Steps to Bid

  1. 1

    Review the full RFQ and Addendum 1

  2. 2

    Submit written questions via the Opengov portal by 12:00 PM on November 6, 2026 was Nov 6, 2026, 12:00 PM

    This date has passed — confirm eligibility with the agency before bidding.

  3. 3

    Attend the non-mandatory Pre-Proposal Conference on October 27, 2026, via Microsoft Teams was Oct 27, 2026, 11:00 AM

    This date has passed — confirm eligibility with the agency before bidding.

  4. 4

    If shortlisted, prepare and submit the Phase II Technical Approach via the Opengov portal by the date specified in the finalist notification by TBD

What you'll need

Submission

Electronic portal

NAICS

541330, 541340, 541370

Get alerts for bids like this

New engineering bids in Georgia

This bid has closed. We'll tell you when the next one like it posts. Free, no card needed.

Get alerts — free

Project details

The project will provide a dedicated shared-use path (12 feet wide) with 2-foot barriers on each side, connecting the north and south sides of I-20. The scope includes concept development, environmental documentation (including NEPA, cultural resources, ecology, and noise studies), preliminary and final design, right-of-way plans, geotechnical investigations, utility coordination, and construction support. The County reserves the right to reject any or all responses and to negotiate with the highest-ranked firm.

Documents

  • B2464_Factory_Shoals_Ped_Bridge_-_RFQ.pdf32 pages
  • B2464_Factory_Shoals_Ped_Bridge_-_Addendum_1.pdf8 pages

See all documents · Download with Pro

More from this agency

Similar open bids

Closing this week nearby