ClosedOther

Repair and Modernize HVAC and Interior Building Systems, Facility 300

Dept of the Air Force — FA8501 OPL CONTRACTING AFSC/PZIOWarner Robins, Georgia

The Department of the Air Force is seeking Solution Briefs for an Other Transaction Agreement (OTA) to repair and modernize HVAC and interior building systems in Facility 300 at Robins Air Force Base, Georgia. The project includes HVAC replacement, interior work addressing lead-based paint, asbestos, and accessibility barriers. The estimated construction magnitude is $20M to $40M. Bidders must have at least five years of construction experience. A Phase 1 Solution Brief is due by 3:00 PM EST on November 16, 2026. The total contract period of performance is 880 calendar days.

On PublicBidSearch: the original bid posting, 6 bid documents and the agency contact (name and email) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName and email — included with ProPro

Overview

Due
Nov 16, 2026
Time stated in bid documents
Nov 16, 2026, 3:00 PM Eastern Time
Submission
email
Contract term
Total Contract Period of Performance: 880 calendar days after Construction NTP date.
Documents analyzed
6 published · 3 analyzed
Required submission items
6 items · full checklist with Pro

Scope of work

  • Repair and modernize HVAC systems in Headhouse and Bay A of B300.
  • Replace electrical system portions.
  • Replace roof on Headhouse and Mechanical Room.
  • Improve exterior wall insulation.
  • Replace interior finishes in Headhouse and Bay A zones.
  • Provide ADA access to basement east section.

Steps to Bid

  1. 1

    Submit Phase 1 Solution Brief via email to Jimmy Ezzell ([email available with Pro]) and Amelia Kelly ([email available with Pro]). was Nov 16, 2026, 3:00 PM

    This date has passed — confirm eligibility with the agency before bidding.

    The Solution Brief should not exceed five written pages, excluding the cover page.

  2. 2

    Participate in Step 2: Interactive Pitch Presentations/Interviews and submit Price Proposal (for short-listed teams only).

What you'll need

Bid security

Required

Current single-project and aggregate bonding capacity, if bonds are anticipated; Name of surety

License

All engineering, plumbing, HVAC, and electrical work required must be accomplished by personnel and/or businesses with a Georgia License.

Contract duration

880 calendar days after Construction NTP date

Submission

Email

NAICS

238220

How to submit

Interested respondents shall submit a Phase 1 Solution Brief consisting of no more than five written pages (5), excluding the cover page via email to the designated point of contact listed.

Get alerts for bids like this

New construction bids in Georgia

This bid has closed. We'll tell you when the next one like it posts. Free, no card needed.

Get alerts — free

Project details

The requirement includes replacement or modernization of end-of-life HVAC equipment; improvements for reliable climate control and energy-efficient operations; and associated interior work to address accessibility barriers, lead-based paint, asbestos-containing flooring, degraded finishes, and workspace configuration. The project aims to improve occupant safety, facility reliability, code compliance, and uninterrupted mission operations for Facility 300’s critical multi-tenant organizations. Facility 300, constructed in 1942, supports key missions including supply chain management, network support, special operations/rotary-wing management, and C-5 cargo aircraft management. The building systems are severely degraded, with HVAC units exceeding their lifecycle, leading to frequent failures and inadequate climate control. Walls have peeling lead-based paint, and degraded flooring contains asbestos. The basement east section is currently inaccessible under ADA standards. This project repairs and modernizes Building 300 workspace to prevent safety hazards, optimize interior space, improve occupant morale, and ensure compliance with energy, safety, and UFC codes. The building will remain in partial operation during the project. The project will be executed under the RAPID framework using a Build-Only approach under 10 U.S.C. § 2808a. The estimated magnitude of construction is $20M to $40M. Interested respondents must submit a Phase 1 Solution Brief by 3:00 PM Eastern Standard Time on November 16, 2026. The Solution Brief should include company information, executive summary, past relevant construction experience (minimum 5 years), team composition, construction execution and phasing approach, and financial capacity and bonding information. All construction materials must adhere to the provided 100% design, the Robins AFB Base Facility Standard, and applicable Unified Facilities Criteria (UFCs). Work will be performed at Robins AFB, GA. Badging requires AF Form 2586. Standard work hours are MON-FRI, 0730-1630, excluding federal holidays. A full-time site superintendent must be on-site at all times when Company personnel are present. Submittals require approval by the Agreements Officer. Dig permits require 21 days advance notice. Crane/Lift permits require 60 days advance notice.

Documents

  • AOI__FA8501-27-RAPID-990029_RPR_RPL_HVAC_SYSTEM_BAY_A_and_HEADHOUSE_110326.pdf6 pages
  • 7._UHHZ990029_-_Submittal_Register.pdf46 pages
  • 3b._UHHZ990029_-_Corrected_Final_Specifications.pdf
  • 3c._UHHZ990029_-_HAZMAT_Report.pdf
  • download
  • 2._UHHZ990029_-_OTA_SOO.pdf7 pages

See all documents · Download with Pro

More from this agency

Similar open bids

Closing this week nearby