Fabricate and Assemble Inlet Cover Plate Assembly
Hanford Tank Waste Operations & Closure, LLC (H2C)Richland, Benton, Washington#75280
The work includes fabrication per drawing H-14-112334, with dual-certified 304/304L stub ends and B31.3-compliant welds, leak testing, and coating. The intent is to award all four line items to one contractor. Offerors must acknowledge receipt of Amendment 2 in writing by the due date.
On PublicBidSearch: the original bid posting, 5 bid documents and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Dec 15, 2026
- Time stated in bid documents
- Dec 15, 2026, 5:00 PM Pacific Time
- Bid bond
- 5%
- Submission
- mail, hand delivery
- Documents analyzed
- 5 published · 2 analyzed
Scope of work
- Fabricate 12-inch inlet and exhaust cover plate assemblies per drawing H-14-112334
- Include dual-certified 304/304L stub ends and MSS SP-43 short-pattern stub ends
- Perform B31.3 leak test and 5% radiography on 8-inch stub-end-to-pipe butt welds
- Apply SSPC-SP 6 abrasive blasting and manufacturer-recommended coating to stainless weldments
- Install Actek 46014 hoist rings and provide thread plugs for post-installation use
Steps to Bid
- 1
Review the solicitation and all attachments, including Amendment 01 and Amendment 02.
- 2
Submit questions to Sue Schwisow by November 30, 2026, at 5:00 PM Pacific Time. by Nov 30, 2026, 5:00 PM
- 3
Acknowledge receipt of Amendment 02 in writing by December 15, 2026, at 5:00 PM Pacific Time. by Dec 15, 2026, 5:00 PM
- 4
Submit the complete proposal, including technical and pricing information, by December 15, 2026, at 5:00 PM Pacific Time. by Dec 15, 2026, 5:00 PM
What you'll need
Submission
Mail, Hand delivery
NAICS
332999
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 5 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
The scope includes fabrication per drawing H-14-112334, including all weldments, flanges, stub ends, bolting, gaskets, hoist rings, and embedded angles. All assemblies must be fabricated per the drawing bill of materials, with dual-certified ASTM A403 WP304/304L Sch 10S stub ends for the 3-inch-long pattern (item 24) and MSS SP-43 stub ends for the 8-inch short pattern (item 34). Flange bolting must follow RPP-CALC-68195 torque values with Grade B7 bolts and Grade 2H nuts. Volumetric examination (B31.3) is required for 5% of the 8-inch stub-end-to-pipe butt welds, with no radiography required for other welds. No critical welds require MT or PT. Coating must follow manufacturer’s data sheet with abrasive blasting to SSPC-SP 6, masking machined faces and weldments, and grit only on the top surface. Yellow finish to be applied to bracket overhangs. EPDM gaskets must be 4” x 4” x 3/8” embedded angle. Hoist rings (Actek 46014) must be installed and torqued, with thread plugs furnished by H2C. Stainless steel tags must be stamped with 'SXXX-VTP-V-012' (tank number in place of XXX). Weldment labels must read 'H-14-112334, WEIGHT (measured) LBS, MINIMUM SLING ANGLE 45° FROM HORIZONTAL'. 25 miles), where unloading will be performed by H2C hoisting and rigging personnel using an HMIS-supplied crane. Personnel badging will be arranged prior to delivery. Partial deliveries are acceptable. Invoicing may be proposed by line item or milestone. Offerors must submit a proposal with pricing, schedule, and technical approach. An acknowledgment of this amendment is required by the due date.
Key dates
- Questions due
- Nov 30, 2026, 5:00 PM Pacific Time
- Bids due
- Dec 15, 2026
Documents
- 00_-RFQ_75280_S-FARM_Inlet_Cover_Plate_Assembly.pdf37 pages
- RFQ_75280_S_FARM_INLET_COVER_PLATE_ASSEMBLY1.zip
- 75280_Amendment_01.pdf4 pages
- 75280_Amendment_01__Zip_File_.zip
- Amendment_02_Revise_Proposal_Due_Date_-_Answer_Question.pdf2 pages
More from this agency
- Fabrication of LAW Melter Start-Up Heaters for the Waste Treatment and Immobilization Plant · closes Dec 1, 2026
- Blanket Master Agreement for Hanford Tank Farms Vadose Drilling Services · closes Dec 15, 2026
- LAW Melter Discharge Chamber Thermocouples and Thermowells · closes Dec 15, 2026
- Safety Significant Equipment Fabrications for the West Area Risk Management (WARM) Project · closes Dec 16, 2026
- TX-Farm Corrugated Metal Pipe Covers – Subcontract for Hanford Site · closes Dec 17, 2026
Closing soon near Richland
- Requests for Proposals: Port of Benton Weed Control, Herbicide and Sterilant Services for Port Sites by Task Orders · Richland · closes Nov 30, 2026
- Horn Rapids Crop Circle #303 – Center Pivot Replacement · Richland · closes Nov 30, 2026
- Tracked Material Mover · Richland · closes Nov 30, 2026
- Hazardous Area Classification Review and Training Support · Richland · closes Dec 2, 2026
- Precision Rifles and Accessories · Richland · closes Dec 2, 2026