Gonda Center Deep Energy Project (Re-Bid)
University of California, Los Angeles — Capital ProgramsLos Angeles, California#943981.01
Work includes converting lab air handling units from constant-volume to variable-airflow, installing occupancy sensors, modifying fume hood controls, upgrading system programming, replacing fluorescent lighting with LEDs, patching and painting walls, and ceiling removal and reinstallation where needed. The base bid includes specified ECMs; Alternates 1 and 3 may be considered. Work must be performed in a fully operational building with night and off-shift work required. A mandatory pre-bid conference and job walk are required. The successful bidder must comply with prevailing wage laws, register with the Department of Industrial Relations, and pay at least $15/hour.
On PublicBidSearch: the original bid posting, 3 bid documents and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Dec 15, 2026
- Submission
- mail, hand delivery
- Contract term
- 3 years + Two additional one-year renewal terms
- Documents analyzed
- 3 published · 1 analyzed
- Required submission items
- 1 items · full checklist with Pro
Scope of work
- Install occupancy sensors in lab spaces to reduce air changes
- Modify fume hood exhaust controls and convert to VAV
- Replace fluorescent lighting with LED fixtures
- Upgrade system controls for scheduling, temperature, pumps, and start/stop optimization
- Patch and paint walls in areas impacted by work
Steps to Bid
- 1
Attend the mandatory Pre-Bid Conference via Zoom and the mandatory Job Walk at the project site. was Oct 16, 2026, 10:00 AM
This date has passed — confirm eligibility with the agency before bidding.
What you'll need
Submission
Mail, Hand delivery
NAICS
238290
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 2 watch-outs that disqualify bidders
- The 1-item required-submittals checklist
Cancel anytime · no card to browse
Project details
This project will upgrade existing air handling units and lighting systems within the Gonda Center to reduce the building’s annual energy usage by approximately 45 percent. Most energy savings will be achieved by converting laboratory air handling units from constant-volume to variable-airflow systems. Other energy efficiency measures include programming upgrades for system controls, conversion of laboratory exhaust valves from constant volume to variable air volume (VAV), installation of occupancy sensors in laboratory spaces to reduce air changes, modification of exhaust controls on fume hoods, and implementation of new system strategies to reduce equipment use through scheduling, temperature control, pump management, and start/stop optimization. In locations where equipment is above existing ceiling grids, work shall include ceiling removal and reinstallation or replacement after completion. The base bid shall include the ECMs designated as 'BASE LIGHTING', 'BASE HVAC', and 'ADD-ALT 4' as specified in the SCOPE MATRIX on drawing M0.2. Alternates 1 and 3 of the same matrix may be considered. Night and off-shift work will be required in sensitive areas as identified by the University Representative. The contractor shall conduct an initial air survey of as-built conditions for all areas and equipment under the scope of work. The estimated construction cost is $7,058,000.
Key dates
- Pre-bid meeting
- Oct 16, 2026, 10:00 AM Pacific Time
- Site visit
- Oct 19, 2026, 11:00 AM Pacific Time
- Bids due
- Dec 15, 2026
Documents
- AdforBids_943981-01RE-BID.pdf3 pages
- AdforBids_943981-01ADNDM1.pdf
- AdforBids_943981-01ADNDM2.pdf
More from this agency
- RRUMC 4th Floor Patient Care Reconfiguration – Resilient Flooring Subcontract · closes Nov 30, 2026
- RRUMC 4th Floor Patient Care Reconfiguration – Doors/Frames/Hardware Subcontract · closes Nov 30, 2026
- RRUMC 4th Floor Patient Care Reconfiguration – Specialties Subcontract (Bid Package 18a) · closes Nov 30, 2026
- Emergency Power Equipment Replacement at 200 Medical Plaza (UCLA Project 906020.01, Bid Packages 01, 03–08) · closes Dec 16, 2026
- RRUMC Room 2128 IR-2 Equipment Replacement · closes Jan 19, 2027
Similar bids near Los Angeles
- RFQ No. 44-047 Exhibition Services · Los Angeles · closes Jan 12, 2027
- Shims, 147060 · Los Angeles · closes Nov 30, 2026
- Purchase of Ultrasonic Table for Outpatient Building - RFB-IS-27200330 · Los Angeles · closes Nov 30, 2026
- F125 Wheel Sets & BTR Wheel Assemblies · Los Angeles · closes Dec 8, 2026
- 146999 Screen Vent · Los Angeles · closes Dec 4, 2026
Closing soon near Los Angeles
- Submonitor Connect FE Electronic Motor Overload Protection Device · Los Angeles · closes Dec 1, 2026
- Track Concrete Fastening and Other Track Materials · Los Angeles · closes Dec 1, 2026
- Vacuum Valves, Air, Combination, Roscoe TL Unit 2 · Los Angeles · closes Dec 2, 2026
- Executive Office Standard Furniture · Los Angeles · closes Dec 2, 2026
- Vacuum Valves, Air, Combination, Roscoe TL Unit 2 · Los Angeles · closes Dec 2, 2026