OpenConstructionCloses Dec 15, 2026

Gonda Center Deep Energy Project (Re-Bid)

University of California, Los Angeles — Capital ProgramsLos Angeles, California#943981.01

Work includes converting lab air handling units from constant-volume to variable-airflow, installing occupancy sensors, modifying fume hood controls, upgrading system programming, replacing fluorescent lighting with LEDs, patching and painting walls, and ceiling removal and reinstallation where needed. The base bid includes specified ECMs; Alternates 1 and 3 may be considered. Work must be performed in a fully operational building with night and off-shift work required. A mandatory pre-bid conference and job walk are required. The successful bidder must comply with prevailing wage laws, register with the Department of Industrial Relations, and pay at least $15/hour.

On PublicBidSearch: the original bid posting, 3 bid documents and the agency contact (name, email and phone) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName, email and phone — included with ProPro

Overview

Due
Dec 15, 2026
Submission
mail, hand delivery
Contract term
3 years + Two additional one-year renewal terms
Documents analyzed
3 published · 1 analyzed
Required submission items
1 items · full checklist with Pro

Scope of work

  • Install occupancy sensors in lab spaces to reduce air changes
  • Modify fume hood exhaust controls and convert to VAV
  • Replace fluorescent lighting with LED fixtures
  • Upgrade system controls for scheduling, temperature, pumps, and start/stop optimization
  • Patch and paint walls in areas impacted by work

Steps to Bid

  1. 1

    Attend the mandatory Pre-Bid Conference via Zoom and the mandatory Job Walk at the project site. was Oct 16, 2026, 10:00 AM

    This date has passed — confirm eligibility with the agency before bidding.

What you'll need

Submission

Mail, Hand delivery

NAICS

238290

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 2 watch-outs that disqualify bidders
  • The 1-item required-submittals checklist
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

This project will upgrade existing air handling units and lighting systems within the Gonda Center to reduce the building’s annual energy usage by approximately 45 percent. Most energy savings will be achieved by converting laboratory air handling units from constant-volume to variable-airflow systems. Other energy efficiency measures include programming upgrades for system controls, conversion of laboratory exhaust valves from constant volume to variable air volume (VAV), installation of occupancy sensors in laboratory spaces to reduce air changes, modification of exhaust controls on fume hoods, and implementation of new system strategies to reduce equipment use through scheduling, temperature control, pump management, and start/stop optimization. In locations where equipment is above existing ceiling grids, work shall include ceiling removal and reinstallation or replacement after completion. The base bid shall include the ECMs designated as 'BASE LIGHTING', 'BASE HVAC', and 'ADD-ALT 4' as specified in the SCOPE MATRIX on drawing M0.2. Alternates 1 and 3 of the same matrix may be considered. Night and off-shift work will be required in sensitive areas as identified by the University Representative. The contractor shall conduct an initial air survey of as-built conditions for all areas and equipment under the scope of work. The estimated construction cost is $7,058,000.

Key dates

Pre-bid meeting
Oct 16, 2026, 10:00 AM Pacific Time
Site visit
Oct 19, 2026, 11:00 AM Pacific Time
Bids due
Dec 15, 2026

Documents

  • AdforBids_943981-01RE-BID.pdf3 pages
  • AdforBids_943981-01ADNDM1.pdf
  • AdforBids_943981-01ADNDM2.pdf

See all documents · Download with Pro

More from this agency

Similar bids near Los Angeles

Closing soon near Los Angeles